Vacuum sectorisation H- Injection Some history Wim Weterings 19-09-2013.

Slides:



Advertisements
Similar presentations
Backwards Compatibility L4 – L2 W. Weterings LBCC - 14.
Advertisements

19th – 20th of September 2007Cryogenic Expert Meeting at GSI, Jan Patrick Meier1/11 Cryogenic Experts Meeting at GSI, 2007 The SIS 100 Cryogenic Jumper.
Cooling System Get the engine up to optimum operating Temperature as quickly as possible and maintains it at that temperature. Controls the heat produced.
Internal H0/H- dump Cesare Maglioni, Melanie Delonca Thanks to: R. Chamizo, R. Versaci, O. Aberle, J. Borburgh.
31/03/11FV 1 CEDAR from flammable gas safety point of view.
11-13/10/2007 ILC BDS Kick-Off Meeting, SLAC, US 1 BDS Vacuum System Dr. Oleg B. Malyshev ASTeC Daresbury Laboratory.
E-Zapper Exit - Plasma Window 18 MeV Electron Accelerator Plasma Igniter Plasma Window Beam in Atmosphere Fast- Acting Valve 2 um Be Window Mechanical.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Safety Review: RF Issues Derun Li Absorber Safety Review December 9-10, 2003 Lawrence Berkeley National Laboratory Berkeley, CA
LHC VACUUM SYSTEM: 2012 REVIEW AND 2014 OUTLOOK G. Lanza, V. Baglin, G. Bregliozzi, J.M. Jimenez EVIAN 2012.
BISMV & H 0 -H - PSB INJECTION VACUUM REQUIREMENTS LIU - PSB meeting 29th October 2012 C. Pasquino, P. Chiggiato, J. Hansen.
H 0 -H - PSB INJECTION VACUUM REQUIREMENTS C. Pasquino, P. Chiggiato, J. Hansen PSB - H0-H- injection review meeting, 18th April 2013.
4 November 2014 Mike Hourican TE/ABT1 LIU-SPS Injection Upgrade With input from Jan Borburgh, Bruno Balhan.
Vacuum, Surfaces & Coatings Group Technology Department Cleanness of the 3-4 cold beam lines Outline:  History: Status of 2009 cleaning  Foreseen and.
PSB H 0 -H - Injection: Sectorisation Analysis C.Pasquino, J. Hansen, P.Chiggiato LIU - PSB Ho-H- Injection Meeting 1.
LTC Extended days, 03 March’08 J.M. Jimenez, AT Vacuum Group LHC Vacuum commissioning J.M. Jimenez On behalf of AT-VAC.
PSB h- injection Layout issues –Are 3 or 4 KSW needed –Geometry of the injection –Element lengths and locations Element performance specifications H 0.
Injection foils and handling system Review on PSB 160 MeV H - Injection 9-10 November 2011 W. Weterings C. Boucly, M. Hourican, R. Noulibos, Y. Sillanoli.
Vacuum System of the LHC Injectors and Beam Transfer Lines by J.M. Jimenez Accelerator Technical & Operation Review (ATC/ABOC Days) - Session 4 22 January.
Vacuum / cryo links Mechanical design issues Jo van den Brand, Martin Doets Nikhef Cascina, January 21,
TS Department / Civil Engineering Group 17 October 2007 Civil Engineering Layouts & Tunnel Cross Section 1 CLIC workshop – Working group: Two beam hardware.
Beam Vacuum Quality Control Outline  VSC consolidation  VSC support  Organization  Status Cédric Garion on behalf of TE-VSC Cédric Garion TE/VSC Beam.
Technology Department 1 Stripping Foil and instrumentation R. Noulibos - W. Weterings – Pieter Van Trappen Technical meeting 21-mai-2014 L4 – PSB - Injection.
ENEN H- INJECTION: STATUS ON MECHANICAL DESIGN - VACUUM SECTORIZATION - BHZ162 CHAMBER MODIFICATIONS - DUMP AREA - BHZ11 CHAMBER MODIFICATIONS.
John Osborne : GS-SEM Civil Engineering 19 May 2009 Report on behalf of CLIC Civil Engineering and Services (CES) WG CTC 19 May 2009 Tunnel Cross Section.
Machine status – December 28  Machine status - overview  Blue ring: ramp development  Yellow ring: obstruction update  Set-up and ramp-up.
05 Novembre 2003Chamonix XIV Workshop, January How to deal with leaks in the QRL and magnet insulation vacuum Paul Cruikshank for AT/VAC Germana.
New injection region 1L1 Engineering Change Request PSB-L-EC-0001 EDMS Wim Weterings PLI Meeting Wednesday 14 th January 2015.
New Fast Wire Scanners in 4L1 and 11L1 - Vacuum outgassing measurements and vacuum pressure simulations – (Friederike Salveter, Jose Antonio Ferreira Somoza,
23 rd WP8 Bi-weekly meeting Lukasz Krzempek (TE-VSC-DLM) TAS-Q1 – vacuum equipment design.
The Stripping Foil Test Stand in the Linac4 Transfer Line
Experience with LEP (and LHC) cryo-modules Workshop on cryogenic and vacuum sectorisations of the SPL O.Brunner – November ’09.
Internal H0/H- dump M. Delonca, C. Maglioni On behalf of EN/STI Thanks to: A. Christov, S. Mathot, C. Pasquino, A. Patapenka.
11/4/2005OLAV 1 Workshop CERNW. Maan Fast Vacuum Valves at CERN -Introduction to fast valves -History of fast valves in use/used at CERN -LEP fast shutters.
BI.DIS10: Magnets & generators R. Rosol, L. Sermeus, T. Stadlbauer, TE-ABT LIU review, 20 November
Transformer positions for BISMV and BSW M. Hourican 2 March 2015.
PSB dump replacement 17 th November 2011 LIU-PSB meeting Alba Sarrió.
ABT LIU Project Review 2015 BI.KSW: Magnet November 20 th 2015 L. Feliciano TE/ABT.
Status of the ELENA transfer lines with special consideration of vacuum, hand-over optics and beam time distribution after 2017 W. Bartmann, D. Barna,
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
1 Sector Test – Preparation Layout in LSS7 Jan Uythoven (AB/BT) Thanks to Mike Lamont and the other ‘sector testers’
PS/SPS Days Roberto Losito/Oliver Aberle 13th January 2004
Review on shorter PSB main bending magnets Injection layout with short magnets Advantages & Disadvantages Wim Weterings
PSB Injection Overview + Specification changes ABT LIU Project Review Wim Weterings.
Radiation Protection studies for the Linac4 / Linac2 interface Joachim Vollaire, DGS-RP 28/09/2015 Linac4 Coordination Meeting.
PSB H 0 -H - Injection: Sectorisation Analysis C.Pasquino, J. Hansen, P.Chiggiato 1LIU - PSB Ho-H- Injection Meeting.
RF power couplers vacuum issues J.M. Jimenez Vacuum, Surfaces and Coatings Group (TE-VSC)
TAS-Q1 Status & what if exercise Etude [HL-LHC] TAS-Q1.
PSB H- injection concept J.Borburgh, C.Bracco, C.Carli, B.Goddard, M.Hourican, B.Mikulec, W.Weterings,
ECR - PSB: New KSW magnet in 16L1 Luis Feliciano, 4 th February.
1 NBI Rh. Jones (CERN - AB/BDI) CNGS Target Area Beam Position Monitors OUTLINE 1.Recap of Requirements & Layout 2.Monitor Candidates -Secondary.
COOLING & VENTILATION PLANTS M. Nonis – CERN EN Department / CV Group Annual Meeting of the FCC study – Rome 14 th April 2016.
Internal H0/H- dump M. Delonca On behalf of EN/STI Thanks to: A. Christov, C. Maglioni, S. Mathot, C. Pasquino, A. Patapenka.
Wim Weterings Remy Noulibos
LCWS11 WG4 Fully featured accelerating structure engineering design
Linac4-PSB 160 MeV connection readiness review
LINAC4 ADVISORY COMMITTEE
Installation of an Instrument on a CERN machine
HEL – Safety aspects Christelle Gaignant
CLEX* Status and Plans CTF3 complex CLEX
XFEL Vacuum System Commissioning
WPs concerned by L4 connection:
J.M. Jimenez On behalf of TE-VSC group
ATLAS ITk CO₂ Cooling pipe routing Common Mechanics meeting
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
Cooling System Get the engine up to optimum operating Temperature as quickly as possible and maintains it at that temperature. Controls the heat produced.
SPS 1 and 5 during W J.MEIGNAN EN-ACE-OSS 23/01/2019.
Cooling System Get the engine up to optimum operating Temperature as quickly as possible and maintains it at that temperature. Controls the heat produced.
BGC Collaboration Meeting –
SNS Coupler Shipping Plans
Presentation transcript:

Vacuum sectorisation H- Injection Some history Wim Weterings

Recommendations and Outcome Review 2011 Vacuum isolation – Possibility to isolate foils from PSB vacuum to avoid foil damage due to differential pressure. – Interlock to avoid venting of the PSB vacuum system before isolation of foil exchange unit.

Foil exchange unit /11/20113Review on PSB 160 MeV H - Injection Foil “in beam” positionFoil “retracted” position Valve can now close to isolate system Minimum required length for retraction Pre-Review Design

Space limitation /11/20114Review on PSB 160 MeV H - Injection Blocking of the passage acceptable ? ~20 cm Present SituationFuture Situation Pre-Review Design

Space limitation Obstruction of the outside PSB passage. Limited space for removal of complete foil mechanism. Possibility to remove part of the wall to be discussed. ~20 cm Action 28: Investigate civil engineering for more space. ‘Impossible’, Supporting wall of main PSB cross beam and complete dismantling of region would be required for intervention. Very complicated and costly operation 20/03/2012Follow-Up Review on PSB 160 MeV H - Injection

Possible solution for integration of sector valves - 1 Retractable Foil Exchange Mechanism Vacuum Manifold Ion Pump Required space for system is blocking the passage Current Baseline Design Review Outcome Design

Possible solution for integration of sector valves - 2 Fixed Foil Exchange Mechanism Series 48 Large body gate valves with pumping manifolds Ion Pump Reduced space for system avoiding blocking the passage Horizontal Option

Why re-sectorising this sector? At the moment the sector valves are foreseen to be positioned right before and right after the stripping foils; A different sectorisation would allow: -Less radiation for TE/VSC during pumping and leak detection. -More space for installation of stripping foils. -Positioning of the sector valves away from a radioactive area; -Less problems to find space for pumping and venting. -A bigger sector might help in controlling the initial phase of the pump down and venting, preventing a sudden rupture of the graphite foils (experimental test are ongoing…) Foil Dump 8LIU - PSB Ho-H- Injection Meeting From presentation Jan Hansen