E. Cavanna, N. Bourcey, P. Ferracin, S. Izquierdo Bermudez, J. Mazet, J. C. Perez, F.O Pincot, X. Sarasola 13-01-2015.

Slides:



Advertisements
Similar presentations
Susana Izquierdo Bermudez, on behalf of the winding team
Advertisements

S2 Glass Insulation Hexcel Corporation S2 Fiberglass Cloth #4522 with F81 Silane Finish. 30” (0.762 m) wide roll, 125 yards long (114.3 m),.0051” (0.130.
Mikko Karppinen Nb3Sn Coil Production for 11 T Dipole Model Magnets.
LHQ Coil 1 OL Curing LHQ Coil 1 Shipping Miao Yu 02/28/2013.
EuCARD-HFM ESAC review of the high field dipole design, 20/01/2011, Maria Durante, 1/40 EuCARD-HFM ESAC Review of the high field dipole design Fabrication.
Raúl Morón Ballester TE-MSC-LMF
Outline: Goals for the cable development at CERN. Main parameters of the cable. Cable development work for a cable width of 15.1 mm and for a cable width.
SQXF Coil 2 Impregnation Status & Plan Fred Nobrega 09/09/2014.
Coil working group video-meeting P. Ferracin, J. C. Perez, S. Izquierdo Bermudez, X. Sarasola February 4th, 2014.
SQXF 25 m Cable Practice Winding at LBNL Miao Yu Dan Cheng 10/31/2013.
LHQ Coil Fabrication Experience and Plan Miao Yu 04/08/2013.
Nb3Sn Cable and Insulation for LARP High-Gradient Quadrupole Magnets
11 T Dipole informal coil and assembly readiness review Long coil and fabrication tooling development status and plans September 22 nd, 2013 – F. Savary.
Coil Design and Fabrication Miao Yu Outline Introduction Coil Design –Coil Pole –Coil End Parts –Coil Insulation Coil Fabrication –Winding.
HQ Coil 23 and 25 Status LARP Video Meeting September 19, 2013 Dan Cheng.
E. Cavanna, N. Bourcey, P. Ferracin, S. Izquierdo Bermudez, J. Mazet, J. C. Perez, Francois-Olivier Pincot, X. Sarasola
Eucard WP 7.3 HFM Winding and tooling tests Insulation choice F.Rondeaux /01/2011 Dipole design review- II-8 Winding and tooling tests – insulation.
Coil working group video-meeting P. Ferracin, J. C. Perez, S. Izquierdo Bermudez, X. Sarasola January 29, 2014.
Fred Nobrega. 9 Dec 2014 Model Design & Fabrication – FNAL Fred Nobrega 2 Outline Background Mechanical Design Model Magnet Features Coil Technology and.
SMC Plans for new SMCs for Fresca2 program J.C. Perez EUCARD-WP7-HFM Short Model Coil review 12 December 2011.
FReSCa2 Technical Review, 9 th June 2015, CEA Saclay FReSCa2 Technical Review June 2015 CEA Saclay J.C Perez on behalf of Fresca2 collaboration team.
Design Features: still to be determined and open questions P. Ferracin 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014 KEK, Tsukuba.
Development of the EuCARD Nb 3 Sn Dipole Magnet FRESCA2 P. Ferracin, M. Devaux, M. Durante, P. Fazilleau, P. Fessia, P. Manil, A. Milanese, J. E. Munoz.
CERN/CEA Collaboration agreement No. KE2275/TE WP4 – Nb 3 Sn technology development Pré-Kick-off meeting 03/07/2014.
LQ status and plans – G. Ambrosio 1 LARP Collaboration Meeting - LBNL, April , 2006 BNL - FNAL - LBNL - SLAC OUTLINE: Goals, Input and Output Sub-tasks.
E. Cavanna, N. Bourcey, P. Ferracin, S. Izquierdo Bermudez, J. Mazet, J. C. Perez, F.O. Pincot, X. Sarasola
DOE Review of LARP – February 17-18, 2014 Coil Design and Fabrication Miao Yu February 17,
Eucard-WP7-HFM 9 th Collaboration Meeting at Warsaw University of Technology Status on SMC & RMC Models J.C Perez on behalf of SMC collaboration team.
Plans and schedule for QXF Giorgio Ambrosio and Paolo Ferracin Joint LARP/CM20 HiLumi meeting Napa Valley, CA, USA 8-10 April, 2013 The HiLumi LHC Design.
Fred Nobrega, Nikolai Andreev 21 September, 2015.
S. Caspi, LBNL HQ Progress and Schedule Shlomo Caspi LBNL LARP Collaboration Meeting – CM13 Port Jefferson November 4-6, 2009.
Helene Felice 11/16/2011 LARP Collaboration Meeting 17 1 st HiLumi Collaboration Meeting CERN Status on HQ Coil Design and Fabrication.
D. Smekens. 2 Coil ID  CableCu DUMMY Cu DUMMY WST DUMMY RRP 54/61 DUMMY RRP 108/127 RRP 108/127 RRP 108/127 RRP 132/169.
F. Savary Question 1 A. Magnet design criteria for the prototype and production magnet to be tested before the installation into the tunnel.
Long Quadrupole – G. Ambrosio 1 LARP Collaboration Meeting – FNAL, Oct , 2008 BNL - FNAL - LBNL - SLAC Long Quadrupole Giorgio Ambrosio LARP Collaboration.
Helene Felice HQ Test Results Review Thursday December 16 th Overview of HQ coils and Magnet.
FRESCA2 Technical Meeting 5-Validation of coil winding with Cu coils Françoise Rondeaux 09/06/ CEA-Irfu-SACM-LEAS - 5-Rondeaux- FRESCA2 Technical.
ECC Clément Lorin – Maria Durante Acknowledgements: Fresca2 team.
Task 6: Short Period Nb3Sn Superconducting Helical Undulator George Ellwood
MQXFS Coil V1 Fabrication Status -Winding and Curing Miao Yu
SQXF1 End Parts Mini Review G. Ambrosio and P. Ferracin October,
MQXF Short model and prototype plans P. Ferracin, G. Ambrosio HL-LHC/LARP International Review of the MQXF Design December 10-12, 2014 CERN.
Conductor working group video-meeting P. Ferracin, S. Izquierdo Bermudez December 19, 2013.
SQXF Cu Cable Winding Test at LBNL Dan Cheng Dec 17, 2013.
QXF Coil Insulation during Each Step QXF Coil WG Miao Yu 08/22/2013.
DOE Review of LARP – February 17-18, 2014 SQXF Coil Design and Fabrication Winding and Curing Miao Yu February 17,
CERN MBHSM0101 and Plan for Future Models F. Savary on behalf of the 11T Dipole Project Team.
E. Cavanna, M. Duret, P. Ferracin, T. Genestier, L. Grand-Clement, F. Lackner, S. Luzieux, F. Savary, S. Triquet, J.C. Perez, M. Pozzobon, H. Prin, P.
E. Cavanna, P. Ferracin, S. Izquierdo Bermudez, J. C. Perez
Long coil manufacturing plan and QC at CERN F. Lackner, P. Ferracin, H. Prin, M. Duret, F. Savary, L. Favier, S. Triquet, S. Luzieux, R. Principe, C. Scheuerlein,
EuCARD-WP7-HFM meeting 15 November 2011 Status of construction of FRESCA2 dummy coil assembly Attilio Milanese, Juan Carlos Perez.
LHQ Coil Fabrication Experience and Plan Miao Yu 04/08/2013.
P. Ferracin on behalf of the MQXF collaboration
Procurement Status Miao Yu 11/19/2013.
Coil Design and Fabrication
TQS Overview and recent progress
Status of the manufacturing process of a Nb3Sn wiggler prototype
MQXFS short model coils and structures fabrication
11T Dipole – Single Aperture 2m Model
ERMC/RMM activities May 2017
FCC 16 T dipole 4578 dipoles + 5 % spares : 4807 dipole magnets
J.C. Perez on behalf of SMC collaboration team J.C. Perez
CEA KE 2775 progress meeting WP3 – FRESCA 2 Magnet
DS11 T Transfer function, integral field and coil length
Mechanical stability and QXF coil winding
P. Ferracin and G. Ambrosio
Paolo Ferracin, Giorgio Ambrosio
MQXF updates P. Ferracin October 9th, 2014.
MQXF coil cross-section status
QXF schedule and milestones
Presentation transcript:

E. Cavanna, N. Bourcey, P. Ferracin, S. Izquierdo Bermudez, J. Mazet, J. C. Perez, F.O Pincot, X. Sarasola

E. Cavanna, N. Bourcey, P. Ferracin, S. Izquierdo Bermudez, J. Mazet, J. C. Perez, F-O. Pincot X. Sarasola Outline 2 Coil NameDescriptionStatus MQXF-001First Practice (Cu)Post Impregnation MQXF-101Second Practice (Nb3Sn – Low grade)Measurements post-impregnation MQXF-102First Coil (Nb3Sn)Impregnation MQXF-103Nb3SnHeat treatment 1.Status 2.Traces for LARP 3.Pole gaps

E. Cavanna, N. Bourcey, P. Ferracin, S. Izquierdo Bermudez, J. Mazet, J. C. Perez, F-O. Pincot X. Sarasola Coil 001 Post impregnation operations ongoing. 3 A new tool for the impregnation of the ends (inner layer) has been machined. Impregnation of the end spacers on inner layer is foreseen for the next days. Update from last presentation

E. Cavanna, N. Bourcey, P. Ferracin, S. Izquierdo Bermudez, J. Mazet, J. C. Perez, F-O. Pincot X. Sarasola Coil Measurements with faro arm ongoing Measurements made on a granite bench Coil supported on two points Method and tools are under development.

E. Cavanna, N. Bourcey, P. Ferracin, S. Izquierdo Bermudez, J. Mazet, J. C. Perez, F-O. Pincot X. Sarasola Coil 102 Coil ready for impregnation 5

E. Cavanna, N. Bourcey, P. Ferracin, S. Izquierdo Bermudez, J. Mazet, J. C. Perez, F-O. Pincot X. Sarasola Coil 102 Pre-tinning of Nb 3 Sn cables (update from last presentation): Problem during pre-tinning of Nb 3 Sn cable on outer layer: 4 strands broke. It happened during cool down, when the operators were dismounting the mould. 6

E. Cavanna, N. Bourcey, P. Ferracin, S. Izquierdo Bermudez, J. Mazet, J. C. Perez, F-O. Pincot X. Sarasola Coil 102 Pre-tinning of Nb 3 Sn cables: 7 Solution: 3 strands of NbTi have been added before the splicing

E. Cavanna, N. Bourcey, P. Ferracin, S. Izquierdo Bermudez, J. Mazet, J. C. Perez, F-O. Pincot X. Sarasola Coil 102 Pre-tinning of Nb 3 Sn cables: 8 Dimensions of the damaged area, before cutting the cable NOTE: dimensions in mm, evaluated for proportion with respect to the cable width

E. Cavanna, N. Bourcey, P. Ferracin, S. Izquierdo Bermudez, J. Mazet, J. C. Perez, F-O. Pincot X. Sarasola Coil 102 Pre-tinning of Nb 3 Sn cables: 9 Dimensions of the damaged area, after cut of the cable and repair NOTE: dimensions in mm, evaluated for proportion with respect to the cable width

E. Cavanna, N. Bourcey, P. Ferracin, S. Izquierdo Bermudez, J. Mazet, J. C. Perez, F-O. Pincot X. Sarasola Coil 103 Coil ready for heat treatment 10

E. Cavanna, N. Bourcey, P. Ferracin, S. Izquierdo Bermudez, J. Mazet, J. C. Perez, F-O. Pincot X. Sarasola Traces for LARP N°2 sets of traces have been manufactured for LARP Electrical checks still to be done 11

E. Cavanna, N. Bourcey, P. Ferracin, S. Izquierdo Bermudez, J. Mazet, J. C. Perez, F-O. Pincot X. Sarasola Pole gaps 12 Initial pole gap set for each coil Coil 001 Cu: 3 mm Coil 101 Nb 3 Sn lowgrade: 7.5 mm Coil 102 Nb 3 Sn: 5 mm Coil 103: 4.5 mm

E. Cavanna, N. Bourcey, P. Ferracin, S. Izquierdo Bermudez, J. Mazet, J. C. Perez, F-O. Pincot X. Sarasola Pole gaps 13 Check of pole gap during fabrication * gap after heat treatment evaluated by sight (no possibility to measure it): however the gap is almost closed. ** for coil 102, winding mandrel dismounted on Friday, and pole gap measured on Monday. Initial GAP (set before winding) [mm] GAP just after curing and release tension [mm] GAP before heat treatment [mm] GAP after heat treatment [mm] Coil 000 (Cu) Coil 101 (Nb 3 Sn low grade) Coil 102 (Nb 3 Sn) Coil 103 (Nb 3 Sn)

E. Cavanna, N. Bourcey, P. Ferracin, S. Izquierdo Bermudez, J. Mazet, J. C. Perez, F-O. Pincot X. Sarasola Pole gaps 14 Some considerations Total contraction coil 101: = 1.9 mm (0.4 mm during reaction) Total contraction coil 102: = 1.63 mm (0.43 during reaction) Contraction coil 103 before reaction: 1.4 mm If coil 103 will contract of 0.4 mm during reaction, the gap contraction will be 4.5-( )=1.8 mm