1 RPC project Upgrade Anna Colaleo (INFN-Bari) on behalf of Bari (Resp.D.Creanza), LNF (Resp.S. Bianco), Naples (Resp.L. Lista), Pavia (Resp.P. Vitulo)

Slides:



Advertisements
Similar presentations
Davide Piccolo INFN Napoli Muon Annul Review Cern 15 September 2003 Chamber Production QA/QC MUON ANNUAL REVIEW On RESISTIVE PLATE CHMABERS CERN, 15 September.
Advertisements

RPC project Upgrade phase I Pierluigi Paolucci. RPC system in the forward region The forward region of the RPC project consists of: 4 disks equipped with.
CMS Annual Review 2003 PACT - the RPC Muon Trigger Bari-Helsinki-Laapperanta-Warsaw Jan Królikowski Warsaw University.
Link Board Upscope Frascati group Napoli group Warsaw group.
Atlas SemiConductor Tracker Andrée Robichaud-Véronneau.
Davide Piccolo - INFN NapoliSIENA maggio 2004 Production and Quality control of RPCs for the CMS muon barrel system Davide Piccolo – INFN Napoli.
MoA 2010 – RPC project G. Iaselli P. Paolucci. 2010: Unique RPC project composed by: Barrel, Endcap and Upgrade M&O 2010 Peking University3 Korea4 India3.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
US CMS Phase 2 R&D Discussion 30-July-2013 “Phase 2 muon R&D” J. Hauser, UCLA  Add redundancy (power) to trigger where most needed  First and innermost.
RPC project status report RPC IB meeting 28 June 2011 Pigi Paolucci.
GEMs for CMS Upgrade Muons are quite central to most of the Physics that would unfold from “CMS” Triggering and tracking with muons, is therefore a challenging.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
RPC Endcap Maintenance and RE4 Upscope Anton Dimitrov on behalf of RPC TC CMS Week Dec 2012 CERN, Geneva.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
Barrel Endcap The RPC System Baseline Six stations in the Barrel Four station in the Endcap up to  = 2.1 Baseline Six stations in the Barrel Four station.
CERN, Main challenges for the ATLAS upgrade project in the coming year.
Muon trigger upgrades, missing since not aimed towards DOE funding PHENIX upgrades: view presented to DOE R&D $3.5M Construction $16.6M Au-Au p-p 200 Si-Si.
Barrel RPC Chamber consists of 2 double-gaps, each equipped with a common plane of 96 strips read-out by 6 front-end boards. The two double- gaps have.
RPC Upscope : An overview with Indian perspective L. M. Pant Nuclear Physics Division Bhabha Atomic Research Centre L. M. Pant India-CMS Meeting, BARC.
GEM chambers for SoLID Nilanga Liyanage University of Virginia.
DHCAL Overview José Repond Argonne National Laboratory CALICE Collaboration Meeting DESY, Hamburg, Germany March 20 – 22, 2013.
G. Pugliese RPC requests for GIF++ G.Pugliese, N. Zaganidis and I. Pedraza on behalf of the RPC group 1.
India CERN Meeting, BARC, 28/02/11
Gap Production for Upscope of the Endcap RPCs Sung Keun Park Korea Detector Laboratory Korea University February 5, 2010 Workshop on the Forward CMS RPC.
NEC Varna sep 12-18, 2005 A. Marinov Andrey Marinov On behalf of the CMS Forward RPC Collaboration Y. Ban, J. Cai, H. Liu, S. Qian, Q. Wang, Y. Ye, J.
T. Kawamoto1 ATLAS muon small wheels for ATLAS phase-1 upgrade LHCC T. Kawamoto (New) small wheels ? Why new small wheels for high.
W.Van Doninck Re-scope TDR August 2008 The forward RPC system (TDR) China Korea Pakistan Gap production Korea Gap production Korea Front-end electronics.
Only Three stations up to  = 1.6 RE i/3 REi/2 REi/1 RPC RE restoration.
CMS Experiment at the LHC, CERN Date Recorded: :21 CET Run/Event: / Candidate Collision Event Report from Belgium Michael Tytgat.
2/4/2001Ludovico Pontecorvo INFN Roma1 Plans for the H8 system test: 2001/2002 Goals for the 2001/2002 Test beam Beam layout Chamber Supports 2001 Schedule.
MoA and M & O-B Pigi Paolucci. Introduction The RPC endcap and barrel project were merged in an unique project in the 2009 and so we don’t have a long.
Pixel power R&D in Spain F. Arteche Phase II days Phase 2 pixel electronics meeting CERN - May 2015.
P. Paolucci - I.N.F.N. of Napoli 1 RPC workshop, 2 march 07 RPC Power system P. Paolucci, G. Polese and D. Lomidze I.N.F.N. di Napoli.
General Muon Meeting, 03-March-2014 Jay Hauser “Update on Phase 2 muon Technical Proposal”  Recent developments:  ME0 inserted into HGCAL as for other.
Pigi Paolucci & Anna Colaleo – RPC project 2012 RPC M&OB scrutiny Anna Colaleo (INFN-Bari) RM Pierluigi Paolucci (INFN-NA) PM 1.
RRB scrutiny Report: Muons. Internal scrutiny group for RRB report Internal scrutiny group composition – J. Shank, G. Mikenberg, F. Taylor, H. Kroha,
Marcello Abbrescia RPCs for CMS during Phase II RPC rate capability M. Abbrescia, The dynamic behaviour of Resistive Plate Chambers, NIM A 533 (2004) 7–10.
RPC M & O-B status Pigi Paolucci. Introduction 2008: RPC project budded from the barrel and forward 2009: M&OB token of 5 KCHF (but INFN 163 KCHF) The.
CMS-GEM gas system GEMs for CMS High Eta Muons - Workshop III, CERN April R.Guida PH-DT-DI.
Ian Crotty HPL (Bakelite) Low Eta TDR Up-Scope 05 Feb 10 HPL for the Up-Scope of the CMS RE Low Eta as per the 1997 TDR in CMS Contents Specification Contingency.
Cables Ian Crotty 8 May 2012 Cables for the RE4 Upscope in CMS News. The HV cables are in the Integration DB (INB/904) The Hv order is confirmed. Need.
W.Van Doninck February 2010 The CMS muon upscope Restore the TDR version of CMS  ME4 CSC’s and RE4 RPC’s on Yoke YE3  When ? During first long shutdown.
Chamber mechanics Chamber mechanics Production in China Peking University Group – 20 Aug
The CMS Muon System BAN Yong, Peking University 2006/12/12 IHEP, Beijing, China Outline: CMS-Muon system: introduction China’s contribution to CMS Muon.
CMS – RPC GIF++ G. Pugliese on behalf of the RPC Collaboration 1.
The Phase-1 Extension of the CMS Endcap RPC System Michael Tytgat on behalf of the CMS Collaboration Outline :  Introduction  RPC Upgrade  Simulation.
Summary of IAPP scientific activities into 4 years P. Giannetti INFN of Pisa.
Operation, performance and upgrade of the CMS Resistive Plate Chamber system at LHC Marcello Abbrescia Physics Department - University of Bari & INFN,
P. Paolucci G. Pugliese M.Tytgat
Cables for the RE4 Upscope in CMS
University of Wisconsin
(On Behalf of CMS Muon Group)
Dept. of Physics and Space Sciences, Florida Institute of Technology
Production ad Quality control of RPCs for the CMS muon barrel system
Atlas: Upgrade Phase I Massimo Della Pietra.
HCAL M&O-B Budget CMS Finance Board
CMS November Upgrade Week
Jan Królikowski Warsaw University
Chamber Design and Integration RE3/1 and RE4/1
Electronics for RPC Upscope
To do list production organization and commitments
Pierluigi Paolucci - I.N.F.N. Naples
RPC Detector Control System
RPC Detector Control System: towards the final system
HL-LHC upgrade at IPHC news
(On Behalf of CMS Muon Group)
Pierluigi Paolucci & Giovanni Polese
RPC Detector Control System
Plans for the 2004 CSC Beam Test
Presentation transcript:

1 RPC project Upgrade Anna Colaleo (INFN-Bari) on behalf of Bari (Resp.D.Creanza), LNF (Resp.S. Bianco), Naples (Resp.L. Lista), Pavia (Resp.P. Vitulo)

2 CMS is design to have a highly redundant muon system : RPC+DT/CSC Up to  = 1.8 lack of redundancy in RPC/CSC : restoration of the fourth layer of RPCs (RE4) and CSC (ME4/2) enables efficient 3 out of 4 logic at the level- 1 trigger, restoring loss of trigger efficiency in this region. The CMS Forward Muon upgrade High eta CSC 2.1 < |  < 2.4, ME1/1 chamber electronics to be high Luminosity since the present ganging of some channels results in unacceptable number of spurious tracks The Forward Muon upgrade is driven by lack of redundancy in the low and high eta region and by unacceptable high muon LV1 trigger threshold at peak instantaneous luminosity. New detector High |  : lack of redundancy from 1.6 to 2.1 (lost 30% acceptance): RPC descoped/postpone due to budget and not sure RPC’s would survive cm -2 s -1

3 Baseline TDR: 4 disks equipped with 3 rings of chambers RPC trigger in the forward region Forward trigger is now de-scoped due to insufficient budget 1) Restoration 4 th stations RPC trigger requires 3/3 algorithm -with 2/3: rate is just too high due to noise and wrong pt assignment. shutdown ) Missing all 1 rd rings (no coverage for |η| > 1.6 ) R&D on more advanced gas detector which could be able to cope with high rates and provide better spatial resolution with respect to RPCs. R&D ongoing on Micro-Pattern Gas Detectors (MPGDs) -shutdown 2017

4 The RPC case: the 4 th station - Better efficiency requires extra redundancy: 3/4 algorithm. E ffects on rate. Preliminary efficiency vs rate studies : - Electronics only: 0.05 Hz/cm2 - Neutron “noise” estimates for L=2x10 34 cm -2 s -1 (quadruple for L=8x10 34 cm -2 s -1 ). – RE1-3: 25 Hz/cm2, RE4: 40 Hz/cm2 – RE1-3: 75 Hz/cm2, RE4: 120 Hz/cm2 For RPC trigger rate seems to be not dominated by neutron BG but by luminosity increase Rate depends non-linearly on neutron rate 3/4 4/4 Efficiency vs Trigger rate: pt>

5 The CMS Muon endcap upgrade Global Muon Trigger robustness in 1.2<|  <1.8 depends critically on the 4 th RPC and CSC stations : controlled rate, lower thresholds, efficiency high. High trigger thresholds would affect lot of physics channels with  muon in final state like H/Z->  ->  tau-jet (low pt) or H->ZZ(WW), A FB (W/Z) Upgraded trigger Get more physics High acceptance 12kHz GMT output GMT with upgrade CSCGMT with upgrade RPC

6

7 All infrastructure service must be added to YE3: -Gas and cooling system (racks and manifolds) -The LV system including cabling to the power supply system. -The HV cabling to the feet Patch Panel in the YE1 and to USC + power system in USC -Off detector electronics: the Link Board Boxes with Link boards/control boards and the related cables and optical fibers. - Temperature and Humidity Sensors The new RE4 station will be installed on the back of the YE3 yoke, mounted independently of the CSC chambers. Infrastructures

8 Institutions The groups from Pakistan, China, Korea, Belgium, India, and Egypt have already committed themselves to this completion. Poland and Colombia have joined the project, although they have not yet committed to any financial contribution. Recently interest has been expressed from Iran and negotiations have started to define possible contributions and areas of involvement. CERN joined the RPC project In red the approved 8

9 INFN groups has been leading the RPC project since the beginning (Barrel resp.) and gave an important contribution on the commissioning of full system, guaranteeing the success during CMS operation. We aim to bring our expertize in several part of the Upscope project and also gain further expertize on aspects which are historically not under our responsibility. - Italian participation in QC/QA during the construction (resistivity meas., QC electronics production, chambers QC) and commissioning phase will be very important - A further improvement can come with involvement of INFN group in the trigger system: 1) we would like to acquire knowledge on the Link system in order to operate it: -Design of the board, test and commissioning would be the training and learning phases. -Involve new people (PhD students) in the link and trigger project 2) we would like acquire expertize on the trigger system in order to participate with a strong group in the design of trigger system for the high eta region. - Operating experience has proved the importance of temperature and humidity monitoring 1) need to increase the monitoring granularity in all forward system (more sensors) 2) we would like to provide optical sensors with a new technology which we already introduced in CMS for other subsystem. INFN RPC Project Manager ( ) = P. Paolucci (Naple) Upgrade Coordinator ( ) = P. Iaselli (Bari)

10 Interests and costs CERNChinaBelgiumIndiaItalyKorea Pakista nEgypt Total ? KSF Technical Proposal BL=Belgium, CH=CERN, CN=China, IN=India, IT=Italy, KL=Korea, FI=Finland, PK=Pakistan, PL=Poland Very preliminary and still under definition

11 Chamber production and test sites High Pressure Laminate (HPL): – Raw material production at the Puricelli industry near Milan – Quality check and resistivity measurement at INFN Pavia and CERN The gas gaps: 180 (144+spares) chambers needed: gaps will be produced by KODEL at Korea University. A total of about 540 (432 + spares ) gaps are needed Honeycomb boxes and auxiliary parts will be produced in “Beijing Axicomb Technology Co., Ltd” (China) Readout strips will be produced in “Beijing Gaonengkedi GT Co., Ltd” (China) Gap and chamber test sites: – CERN site at 904: CERN and Pakistan group will provide qualified manpower for the assembly and test (60 RE4/2-RE4/3) – Belgium site: The chamber construction will be the main effort of the University of Gent. The manpower to perform the assembly will be provided by both the University of Gent and the Vrije Universiteit Brussel(60 RE4/3) – India site: RPC assembly and testing would be done at two sites: Nuclear Physics Division-Bhabha Atomic Research Centre (NPD-BARC) at Mumbai; and Punjab University at Chandigarh (60 RE4/2 ) 11

3/31/11 Chambers production plan

13 Production QC and commissioning All people and experts will be involved in the commissioning and integration of the full system. Bari and Pavia groups will be involved in the quality control program: Quality control of bakelite production in Pavia - 1 physicist + 1 technicians (0.3 FTE) – Pavia. Quality control of chamber production at CERN: - 1 physicist + 2 technicians (0.3 FTE) Bari - 1 physicist + 1 technician (0.3 FTE) Pavia

14 Two instruments used: A “Portable” instrument: measurements on 30cmx30 cm (max) samples in INFN lab and Puricelli A “Fixed ” instrument: measurements on an entire panel (9 measurements in 9 different positions across the panel) barrack in INFN Pavia Great experience of Pavia group will be very important in the quality check of Bakelite. Pavia is already checking bakelite pre-production at Puricelli (resistivity values, stability in time..) Bakelite resistivity measurement and QC

15 Electronics: Front-end/Trigger/Readout DB

16 Electronics The 144+spares new chambers have to be equipped with FEB, Link board, power systems. Good opportunity to improve the existing system and built new spares for all system 1) FEB and distribution boards (DB) will be produced under Bari supervision. Some modifications in distribution board will be implemented. 2) Power system for RE4 will be ordered to the CAEN under the Napoli supervision (India, Belgium budget) 3) Link system: The CMS electronic/trigger groups have strongly recommended to review to “old” project and to implement all the protections and improvements needed (comes from the experience accumulated in these years). The main goals are: build an updated and more robust system and involve more groups in the RPC trigger project in order to compensate for the Warsaw dependence and gain experience for the design of trigger system for upgrade at high eta. New design includes: LV regulators + critical component protections Back-compatibility: – mechanical, electrical and firmware compatibility with the present system. – has to work in both new and old (protected) link box – possibility to have both protected and not protected boards in the same box 16

17 Link system Naples is designing the board -Electronic Service: 8-7 months in the 2010 and First design ready. Cooling test done (see slides LBupgradeStatus.pdf) Board production in Italy Preproduction 2011, full production 2012 Complete test setup at CERN (bd 904): Warsaw and Italian responsibility LNF, Naple and Bari will be involved in test and commissioning - Frascati, Naples, Bari (supervision ) Installation under Italian/Warsaw responsibility It will ensure the transfer of knowledge and will be responsible for the software integration in the trigger system Warsaw is the group with the expertise in the link board/trigger hardware/firmware and software.

18 Preliminary schedule for link project 18  Prototypes test and test setup at CERN:1 tech FTE engineer* (2011) + Warsaw  Test at CERN (blg 904):1 tech FTE engineer* (2012) + Warsaw  Installation 2013:2 tech FTE engenier* (2013) + Warsaw  Commissioning 2013:1 phys for 6 months (2013) + Warsaw *Need Engenier (PhD student/Post-doc) to work at bd904 and during commissioning phase with Warsaw experts, under F. Loddo supervision

19 Costs breakdown for link system

20 Temperature and Humidity sensors Sensors for T and H monitoring in endcap stations (LNF, Napoli and CERN). Each endcap chamber, RE4 but also RE2, RE3 (each existing ring now is equipped with only 6 sensors) will be equipped with one FBG sensor for T measurement: radiation hard, insensitive to magnetic field, precise, no electrical noise, ease to install, minimal cabling. And costs are similar to the conventional sensor. Humidity monitoring will be performed via conventional electronic sensors (4/disk). The INFN Naples and LNF groups have the expertise on FBG sensors in HEP detectors (FINUDA, BTEV, CMS) and industrial applications Explore possibility of using optical sensors for gas contaminants (PRIN funded)

21

22

23 weeks T sensors: tasks and time-line Sensors certification and packaging (Frascati resp.) at LNF clean room and lab, (possibility of parallelization using labs at Enea, Roma1, UniNa, Unibenevento): Installation at CERN (Napoli resp.)

24

25 Costs breakdown RPC project Assuming 1€ = 1.3 CHF Link system Total = 288k€ ~ CHF Sensors Total= 25k€ ~32000 CHF Total = 313 → 406 kCHF + 10% (10% contingency) = 345 k€ → 448 kCHF Total request to INFN including 10% contingency = 345k€ (450kCHF) Original request was 600 kCHF Do not include FTE cost and transport Costs include TVA for the moment.

26 Cost time profile 66% costs of sensors (-65kCHF => 50 k€) must be shared between RPC institution contribution to M&OB (INFN ~36%) over 3 years ( ) = ~18kEuro (over 3 years) from INFN (discussion ongoing inside RPC IB)

27 Conclusions INFN involvement in restoration RPC Forward system - Bakelite test – Pavia -Chamber commissioning – Bari, Pavia -Electronic production supervision and commissioning – Bari/LNF/Napoli -T/H sensors – LNF/Napoli Total request to INFN ~ 345 k€ (~ 450kCHF) (including 10% contingency) We also envisage to involve new people, who has to work at CERN with Warsaw experts in order to be able to form a group that can take part in future at the design of trigger system for the high eta region project (several groups already working on the simulation and detector/trigger R&D)

28 Backup

29 CMS Global Muon Trigger Combine informations from 3 different systems Optimized algorithm with respect to efficiency rates ghost suppression

30

31 RPC Simulation Validation Compare RPC rates with Physics TRD estimations for L=2x1033 (Section 3.4.7, Fig. 3.25) – Use our estimated rates for L=2x1034 but scale by 1/10 Good agreement for the “no RE4” case

32

33 Electronics: general layout