OV-1.1 CSE4939 CSE4940 CSE4939W/4940 CS & E Design Lab I/II Profs. Steven A. Demurjian and Swapna Gokhale Computer Science & Engineering Department The University of Connecticut 191 Auditorium Road, Box U-155 Storrs, CT
OV-1.2 CSE4939 CSE4940 Projects and Deliverables – Now to Oct 1 CSE4939W: First Project Based Course Concentration on Architecture, Specification, and Design Emphasis on Incremental Development via an Agile Approach Deliver 2 Increments CSE4940: Continuation of the Project Emphasis on Incremental Development Deliver 3 Increments – Aim for Final Beta Extensive Testing Throughout Semester Final Poster/Presentation at Gampel
OV-1.3 CSE4939 CSE4940 Schedule – Fall 2015, Spring - TBD AssignmentAssignedFirst DraftRevised Version (if any) Project ProposalSept. 9Sept. 12Sept. 16 High-level SpecificationSept. 16Sept. 23Sept. 30 Dec. 11 Jan. 27 First Sprint/ScrumSept. 23Sept. 30Oct. 7 Second Sprint/ScrumNov. 4Nov. 11 Third Sprint/ScrumDec. 11Jan. 27
OV-1.4 CSE4939 CSE4940 CSE4939W Project Proposal Web Links: 1 to 2 page proposal due Sept 12 th by 5pm Feedback by Sept 14 th, 12noon Revised Proposal due Sept 16 th See Three Examples on Web Page Team A: Drones Team D: Rooms Team G: Personal Health Assistant
OV-1.5 CSE4939 CSE4940 CSE4939W High Level Specification Web Links: 6-8 pages (Single spaced, 12 pt, 1 in margs) Product Backlog – See Next Two Slide Purpose, Objective, Goals Introduction, Glossary, Operating Environment Information, Performance, Security High-Level Software Architecture Each Student Clearly Identifies their Section Due on September 23; Revised September 30 Again – Samples for Teams A, D, and G
OV-1.6 CSE4939 CSE4940 Product & Sprint Backlogs – Rooms
OV-1.7 CSE4939 CSE4940 Product & Sprint Backlogs – PHA
OV-1.8 CSE4939 CSE4940 CSE4939W Initial Sprint Due Sept. 30 Contains Six Sections: Section A. Sprint Backlog Section B: User Stories/Use Cases Section C: User Based Specification/Interfaces Section D: Detailed Design Section E: Test plans Section F: Product Backlog Items (PBI) (see slides 6/7) Focus on the RED HIGHLIGHTED sections only Samples on web page:
OV-1.9 CSE4939 CSE4940 CSE4939W Initial Sprint – Requirements Due Sept. 30 Section A. Sprint Backlog Section B: User Stories/Use Cases 5 to 7 use cases with actors Section C: User Based Specification/Interfaces 4 to 6 GUI Mockups Section D: Detailed Design Add 5 new Diagrams per Sprint Section E: Test plans Section F: Product Backlog Items (PBI) (see slides 6/7) Update with Changes at end of Sprint Used to Generate New Sprint Backlog
OV-1.10 CSE4939 CSE4940 Successive Sprint - Requirements Section A. Sprint Backlog Section B: User Stories/Use Cases 5 to 7 use cases with actors Section C: User Based Specification/Interfaces 4 to 6 GUI Mockups Section D: Detailed Design Version Due November 10: Initial 10 Diagrams Subsequent Versions – Update Existing and Add 5 Diagrams Section E: Test plans Section F: Product Backlog Items (PBI) Update with Changes at end of Sprint Used to Generate New Sprint Backlog
OV-1.11 CSE4939 CSE4940 Section A. Sprint Backlog For Initial and All Successive Sprints For each sprint item, there is: Primary and secondary individual in charge of the item (initials) The different task for the PBI in the sprint. Effort in hours for weeks 1, 2, 3, and 4 For Each Week Each member has 10 hours 50 hours effort per team For Entire Sprint Each member has 40 hours 200 hours effort per team
OV-1.12 CSE4939 CSE4940 Section A. Sprint Backlog
OV-1.13 CSE4939 CSE4940 Section A. Sprint Backlog
OV-1.14 CSE4939 CSE4940 Section B: User Stories/Use Cases Initial 5-7, Successive Modify/Add
OV-1.15 CSE4939 CSE4940 Section B: User Stories/Use Cases Initial 5-7, Successive Modify/Add
OV-1.16 CSE4939 CSE4940 Section C: User Specification/Interfaces Initial 4-6, Successive Modify/Add
OV-1.17 CSE4939 CSE4940 Section C: User Specification/Interfaces Initial 4-6, Successive Modify/Add
OV-1.18 CSE4939 CSE4940 Section D: Detailed Design Not on Initial Sprint, 10 for Sprint Nov 4
OV-1.19 CSE4939 CSE4940 Section D: Detailed Design Not on Initial Sprint, 10 for Sprint Nov 4
OV-1.20 CSE4939 CSE4940 Section E: Test plans Not on Initial Sprint, 10 for Sprint Nov 4
OV-1.21 CSE4939 CSE4940 Section E: Test plans Not on Initial Sprint, 10 for Sprint Nov 4
OV-1.22 CSE4939 CSE4940 CSE4940 Software Quality Assurance Due Spring 2016 Web Links: Qualities are: Performance Portability Understandability Productivity Reliability User Friendliness Robustness Repairability Reusability Maintainability Interoperability Evolvability Each Team Member Does 2 Qualities Importance and Relevance Attainment of Quality in your Specifacation ½ page, 12 pt, single spaced per Quality