Lake City Army Ammunition Plant (LCAAP) Independence, MO Alliant Lake City Small Caliber Ammunition Company NDIA SYMPOSIUM MAY 14,2003.

Slides:



Advertisements
Similar presentations
Five to Ten Year Vision for CBM by: John S. Mitchell for: ATP Fall Meeting -- Condition Based Maintenance Workshop November 17, 1998, Atlanta Georgia.
Advertisements

“Harnessing the Power of Technology for the Warfighter”
Energy Service Productivity Management ©2007 ESPM Energy Consultants, L.L.C. All Rights Reserved.
Washington State Department of Health Division of Environmental HealthOffice of Drinking Water Mike Dexel Water Resources Policy Lead Municipal Water Law.
Presented by: Mozart Team Spring 2008 MGT 693.  Company History & Background  CAT’s Strategy  SWOT Analysis  Competition  Industry Analysis – Porter’s.
Kronos Overview Go-Live Date June 17, Why are we implementing Kronos? Current Process: – Sign in / out on paper – Fill out AU-15 turn into supervisor.
The Small Arms Production Base William Sanville Project Manager Maneuver Ammunition Systems (PM-MAS)
Section 209 Activity Report September 12, 2011 Federal Railroad Administration.
1 AO Milan 40MM Manufacturing Support Capabilities J. Fine & J. Solgaard January 28, 2004.
M 249 SAW.
IDENTIFYING NEXT PRACTICES FOR MBE DEVELOPMENT Carla Preston Director, Supplier Diversity Development 1 National Minority Supplier Development Council.
THE PRESIDENT’S FISCAL YEAR 2012 BUDGET REQUEST Federal Transit Administration.
Introduction and Course overview by S. O. Duffuaa.
Why Latvia? Baltic Renewable Energy – Latvia. Latvia is positioned for potential Baltic Renewable Energy – Latvia Population: Total EU Canada/US.
CORPORATE STRATEGY OF TATA MOTORS
Using ISO 9001:2000 to Build an EMS at McAlester AAP Gary W. Chiles, Ph.D. Federal Environmental Consulting LLC Sernanda Anderson McAlester Army Ammunition.
Doug Brown October 23, Budget Overview A Budget Planning Process (Overland Park’s) Financial Management.
ACTION PROPOSAL FOR FLYWHEEL ENERGY TECHNOLOGY Enhance future grid reliability, interoperability, & extreme event protection In 20 years, the flywheel.
The South Carolina Technical College System System Update and Initiatives January 7, 2010.
LATROBE SPECIALTY STEEL AMM Aerospace Metals Conference Pittsburgh, PA Dan Hennessy V.P. - Manufacturing April 11, 2007.
Standard WBS Version 1.0 WBS2-3.pptPage 1 Standard Work Breakdown Structure Legend = Decomposes to lower level WBS elements 4.0 Implementation 4.0 Implementation.
Infrastructure – Mission to Preserve & Renew. Infrastructure – Transportation funding must be sufficient to both repair and sometimes replace our highway,
ICS321 – Management Information Systems Dr. Ken Cosh.
We’re proposing to modernize our Rodeo Refinery to recover propane from our refining process, and better recover butane — to cut sulfur dioxide emissions.
Cultural Resource Management in the Department of Defense September 29, 2005 Maureen Sullivan Federal Preservation Officer.
ISAT 211 Mod 2-1  1997 M. Zarrugh ISAT 211 Module 2: Competitiveness and Operations Strategy  The learning objectives of this module are –To explain.
 Improve innovative technology that will lead to better efficiency and minimized costs  Maintain growth through effective risk management  Actions.
SMALL CALIBER Advanced Planning Briefing to Industry (APBI) 13 February 2002 Mr. Mike Richard Lake City/Small Cal Division Lead Engineer/Project Manager.
STRATEGIC PLAN DEPUTY CHIEF OF STAFF FOR PERSONNEL, INFRASTRUCTURE AND LOGISTICS U.S. ARMY TRAINING AND DOCTRINE COMMAND OCTOBER 2005.
Program Executive Office Ammunition
MAST Technology, Inc. Company Overview - July 2008.
UNIDO - Energy Efficiency Creating a Standard Framework for Sustainable Industrial Energy Efficiency Lorence Ansermet UNIDO Regional Office in South Africa.
M249 SAW.
AMC Committed To Excellence ALACV PROGRAM ALACV Airburst Demonstration Fuze For 40mm Cannon Caliber Ammunition Fred Herr US Army ARDEC Mark Tomes Alliant.
PRESENTATION TO THE PORTFOLIO COMMITTEE OF HOME AFFAIRS GPW : Role, Mandate and Challenges Prof A D Mbewu Chief Executive Officer 2 September 2014 GOVERNMENT.
Propellants & Explosives Sector Issues and Concerns February 3 rd, Munitions Executive Summit - ICAP.
KINETIC INITIATED CORE MUNITIONS (KICM™) 0.50 Caliber
Are you looking for an opportunity to join a company that has a long history and an exciting future? A place where you can grow within an international.
Office of Science (SC) Overview John Yates Office of Operations Program Management, SC-33 Office of Science Briefing for DOE FIMS Training at ANL – May.
Manufacturing Plant maintenance Materials management Quality management.
Forms of energy Environmental Science. Energy Energy - capacity to do work  It gives us the ability to use the machines/devices that we need to use Can.
Emergency Response for Dangerous Goods Freight Week 2009 Thursday 10 th September 2009.
COMPANY PROFILE  Corporate profile:   etc.  Mission and activities:   etc. 1/2.
A Partnership For The New Millennium & You!
Railroad Safety Update Joint Hearing of the Minnesota House Transportation Policy & Finance Committee & Senate Transportation and Public Safety Committee.
13 May 2003 PROGRAM EXECUTIVE OFFICE, SPECIAL PROGRAMS SPECIAL OPERATIONS ACQUISITION AND LOGISTICS CENTER JOINT SERVICE SMALL ARMS PROGRAM (JSSAP) National.
Condition Based Maintenance Plus (CBM+) Overview
New York State Division of Homeland Security and Emergency Services Office of Interoperable and Emergency Communications.
Information from the experts: Michelle Comerford, Principal Comerford Consulting Group LLC J. Michael Mullis, President & CEO J. M. Mullis, Inc. Food Industry.
INDIAN CREEK GOLF CLUB Post Flood Analysis September
HORSE CREEK WATER SERVICES INC GENERAL RATE APPLICATION.
Maintenance Management
1 Maintenance Management. 2 Equipment Malfunctions l Equipment malfunctions have a direct impact on: l Production capacity l Production costs l Product.
Agriculture Mechanics as a Profession Mechanics A branch of physics that deals with motion and the action of forces on bodies.
ME Spring 2015 Systems Engineering, Part II Session 16 5 March 2015 Mr. Larry Hopp, CPL.
ME Summer 2013 Systems Engineering, Part II Session July 2013 Mr. Larry Hopp, CPL.
Careers in Agriculture Chapter 2 Ag. Mechanics I Mr. Herren.
Future Rail and Road developments
PARTS FOR ALL MAKES CRANE PARTS.
CAD/PAD Life Cycle Sustainment Plan (LCSP) 2017 CAD/PAD International Logistics meeting Lee Manis USN/USMC CAD/PAD APML 23 May 2017.
Signal Improvement Project COMMUNITY DEVELOPMENT DEPARTMENT
TF Mission To protect and strengthen our bases and the jobs and economic impacts associated with them in alignment with the expected assessment criteria.
HIGHER PRODUCT DESIGN PRODUCT PLANNING PRODUCT LIFE CYCLE
City-wide LED Street Light Conversion Program
Microsoft Dynamics 365 – Purchasing & Supply Process at AltaSteel
Agenda Overview Tactical Employment ATK 25mm Barrett HEDP System
Mission -- Improve Weapon Technology -- Improve Defense Management
Capital Improvement Plans
Please click on any button below
M918E1 40mm DNT Safe Training Solution Parari 2019 Canberra, Australia
Presentation transcript:

Lake City Army Ammunition Plant (LCAAP) Independence, MO Alliant Lake City Small Caliber Ammunition Company NDIA SYMPOSIUM MAY 14,2003

(2) Plant Overview History 26 December Ground Breaking 12 September First Round 11 October First Railcar Load

(3) Plant Overview Mission To provide America’s Armed Forces quality ammunition for training, maintaining and sustaining combat power -- safely, on-time, economically and in an environmentally responsible manner, maintain a viable, reliable and responsive Small Caliber Ammunition production capability to meet the services’ crises response demands. Vision To maintain and improve the LCAAP as the premier ammunition production facility in the Department of Defense and across the industry. Lake City Mission & Vision

(4) Plant Overview mm7.62mm Caliber.5020mm M200 M855 M856 M193 M196 Blank Ball Trace Ball Trace Saws Saws SCAMP M82 M80 M62 M62 M118LR M852 M276 Blank Ball Trace OHF Special Match Dim Ball Trace M1A1 M33 M17 M8 M20 M962 Blank Ball Trace API API-T SLAP-T PGU-27/B PGU-28/B M56A4 M220 M55A2 TP SAPHEI HEI TP-T TP Families of Ammunition

(5) Plant Overview Production History KOREA VIETNAM WWII Remington Arms Olin ATK

(6) Plant Overview Plant Capabilities reduced through the 80’s Bulding 3A 20mm cases Phased out late 70’s Building mm conventional manufacturing Phased out by 1989 Buildings 139/142 M505 Fuse assembly Safety issues M55 series demand

(7) Plant Overview Lake City in 90’s typical of Industrial Base Plant operating at less than 20% capacity 5.56mm largest volume 7.62mm and Cal.50 no long term major requirements Army push to reduce assets Sell used equipment ARMS initiatives Reduced maintenance funding Building needing repair Excess equipment being used for replacement parts

(8) Plant Overview Consolidation Plan thought the answer Plan agreed and funded by the Army in 1996 $6M+ approved 3 year plan Plan consolidated three production buildings into one Building 3 to remain open 20mm operations to Blg 3 & close Blg operation to Blg 3 & close Blg 2 Plan implemented in 1997 through 1999

(9) Plant Overview Current requirements with Replenishment exceed capacity Plant operating at 3/8/6 Blgs 1 & 3 Blg 2 largely occupied by Links Little equipment and facilities available for use Old production lines not equipped Buildings need major infrastructure repair 7.62mm and Cal 50 future requirements strong

(10) Plant Overview Lessons learned Things always change Once capacity is gone; very expensive to replace Older ammunition systems still have place in today’s Army

(11) Plant Overview