Grid-enabling the Australian Synchrotron 24 February 2005.

Slides:



Advertisements
Similar presentations
Do we need a GN of NGOs? Yes! (as far as participation in the GN does not reduce/affect involvement in the GP/DRR) The GN should build on existing networks.
Advertisements

GRIDs Workshop Brussels Jan 2003 Next Generation Grid Architecture Keith G Jeffery Domenico Laforenza Thierry Priol.
E-Science Update Steve Gough, ITS 19 Feb e-Science large scale science increasingly carried out through distributed global collaborations enabled.
Achieve Benefit from IT Projects. Aim This presentation is prepared to support and give a general overview of the ‘How to Achieve Benefits from IT Projects’
1 US activities and strategy :NSF Ron Perrott. 2 TeraGrid An instrument that delivers high-end IT resources/services –a computational facility – over.
ESO-ESA Existing Activities Archives, Virtual Observatories and the Grid.
Slide: 1 Welcome to the workshop ESRFUP-WP7 User Single Entry Point.
January 6. January 7 January 8 January 9 January 10.
2nd Workshop Prague 29/11/2007 WP4: Pilot action plan Region of Central Macedonia Isidoros Passas, URENIO Research Unit.
May 17, Capabilities Description of a Rapid Prototyping Capability for Earth-Sun System Sciences RPC Project Team Mississippi State University.
Research IT Service Projects 2009 Fred Clarke, Head of Research IT Service 25 th February 2009.
SCHOOL OF INFORMATION UNIVERSITY OF MICHIGAN bugscope.beckman.uiuc.edu.
Promoting Excellence in Family Medicine Enabling Patients to Access Electronic Health Records Guidance for Health Professionals.
April 2, 2013 Longitudinal Data system Governance: Status Report Alan Phillips Deputy Director, Fiscal Affairs, Budgeting and IT Illinois Board of Higher.
Assessment of Core Services provided to USLHC by OSG.
GridPP Tuesday, 23 September 2003 Tim Phillips. 2 Bristol e-Science Vision National scene Bristol e-Science Centre Issues & Challenges.
Regional Technical Forum End-use Load Shape Business Case Project Project Initiation Meeting Portland, OR March 5, 2012.
SICSA student induction day, 2009Slide 1 Social Simulation Tutorial Session 6: Introduction to grids and cloud computing International Symposium on Grid.
Workshop on the Insurance Core Principles IV Conference on Insurance Regulation and Supervision in Latin America Punta Cana, May Makoto Okubo,
1 e-Infrastructures and Virtualisation, Remote Instrumentation “The views expressed in this presentation are those of the author and do not necessarily.
Open Data from Reliable Records Anne Thurston. The Open Data movement, a key aspect of Open Government, is now a top development interest across the world.
CI Consumer Justice and Protection programme Indrani Thuraisingham CI Office for Asia-Pacific and the Middle East.
IT Consolidation Feasibility Study KICKOFF Bill Roth, CITA Bryan Dreiling June 1, 2010.
The Concept of the European Platform of Women Scientists An instrument of support and a way to become active in the policy debate Isabel Beuter, M.A. Center.
Chuck Humphrey Data Library Co-ordinator University of Alberta May 16, Capitalising on Metadata Tool development plans IASSIST 2007.
UN/CS/RAI/USAA/DB01/ Development of a Strategic Plan for a Digital Archives Programme Common Services Working Group on Archives and Records.
N° 1 Directorate General for Energy and Transport Preparation of the Green Paper on Urban Transport Brussels, June 2007 Marcel Rommerts Clean Transport.
Research and Educational Networking and Cyberinfrastructure Russ Hobby, Internet2 Dan Updegrove, NLR University of Kentucky CI Days 22 February 2010.
Promoting Education for Entrepreneurship in Europe Maud Skäringer European Commission Enterprise and Industry Directorate-General Entrepreneurship Unit.
The Australian Energy Regulator SA electricity distribution determination 2015–2020 Framework and approach Presentation to the Energy Consumers’ Council.
FERC Office of Energy Projects 1 Hydroelectric Licensing Regulations Final Rule July 23, 2003 Federal Energy Regulatory Commission Office of Energy Projects.
1 Strategic Plan for Digital Archives Programme DAP PROJECT SCOPE OVERVIEW STATUS.
Grid Computing & Semantic Web. Grid Computing Proposed with the idea of electric power grid; Aims at integrating large-scale (global scale) computing.
Recent Developments in CLARIN-NL Jan Odijk P11 LREC, Istanbul, May 23,
- Vendredi 27 mars PRODIGUER un nœud de distribution des données CMIP5 GIEC/IPCC Sébastien Denvil Pôle de Modélisation, IPSL.
GRID Overview Internet2 Member Meeting Spring 2003 Sandra Redman Information Technology and Systems Center and Information Technology Research Center National.
Sacramento Area Council of Governments ITS Partnership Meeting February 2, 2005.
Cooperative experiments in VL-e: from scientific workflows to knowledge sharing Z.Zhao (1) V. Guevara( 1) A. Wibisono(1) A. Belloum(1) M. Bubak(1,2) B.
Reliable Power Reliable Markets Reliable People AESO Integrated Market Roadmap March 2009 Stakeholder Session.
SOLUTION What kind of plan do we need? How will we know if the work is on track to be done? How quickly can we get this done? How long will this work take.
A practical methodology for technology needs assessment: Introduction and overview of preliminary issues Imperial College Centre for Energy Policy and.
Development of a harmonised quality assurance and accreditation system at institutional level, national, regional and Pan-African continental level EU.
BFC Information and Communication Tools 2003 Paris Clearing House Workshop.
1 IRES, version 0: an overview Vladimir Markhonko United Nations Statistics Division The Oslo Group on Energy Statistics Fifth meeting, Cork, Ireland,
International Recommendations for Energy Statistics (IRES): A progress report Fourth Meeting of the UN Committee of Experts on Environmental-Economic Accounting.
International Portal on Food Safety, Animal and Plant Health Presentation prepared by Mike Robson Project Manager.
eSciDoc Community Model Draft eSciDoc Community Model Overview 1.Introduction 2.Requirements on the Community Model 3.Organizational.
Inception Report: 21st March, 2012
OCT Environmental Profiles DEVCO-TF OCT, September 2013.
The Global Forum on Food Security and Nutrition A platform for inclusive, multistakeholder policy dialogue Rome December 2015.
Eurostat Future statistical Cooperation in the Pan African statistical programme XVII meeting of the Management Group on Statistical Cooperation Luxembourg,
IT Infrastructure Plans
GISELA & CHAIN Workshop Digital Cultural Heritage Network
WGARM Appraisal Decision Assistance Phase 1, Dec. 2002
Overview of the Neighbourhood Plan Process
grid and next generation network
Antonella Fresa Technical Coordinator
AFRICAN RCE’s: CHALLENGES AND OPPORTUNITIES
The Enablers Project Project Name: The Enablers Project
The Stakeholder Conference 03 November 2010 Ramada Hotel, Tunis
WGARM Appraisal Decision Assistance Phase 1, Dec. 2002
Creating a Strategic Plan for Research and Scholarly Activity
MAX IV Laboratory National Synchrotron Light Source – two storage rings (1.5 & 3.0 GeV) and a Short Pulse Facility Characteristics of User Program: 15.
GISELA & CHAIN Workshop Digital Cultural Heritage Network
EGI-Engage T. Ferrari/EGI.eu.
Item 2.2 of the Agenda Remote access to confidential data for researchers: possible actions under the 7th Framework Programme Pascal JACQUES Unit B 5 15.
CCN Nursing in Cancer Care: The Plan for 2013/14
Structural Funds: Investing in Roma
Capitalising on Metadata
CCN Nursing in Cancer Care: The Plan for 2013/14
Presentation transcript:

Grid-enabling the Australian Synchrotron 24 February 2005

Project Program Phase 1 (to end January 2005) –Specification of grid requirements –Consultations with scientists –Preparation of discussion paper Phase 2 (to end February 2005) –Circulation of discussion paper –Consolidation of comments and research –Preparation of draft project proposal Phase 3 (to end March 2005) –Circulate draft project proposal (by 11 March 2005) –Consult with key stakeholders –Conduct forum with key scientists and stakeholders –Prepare final project report (by 25 March 2005)

Key Issues Data security Data management Data linking Data manipulation and visualisation Security, authentication, audit trails Telepresence Remote operations Production class facilities Virtual organisation management

Responses to Discussion Paper Generally supportive of discussion paper context Reinforced data security as key issue Reinforced the need to link related data (experiment, beamline, etc) Noted not many examples worldwide, although similar to Diamond Network security and reliability issues are important Remote access and telepresence are key facilitating needs

Project Scope National Data Structure –primary, backup, archive Regional nodes as ‘virtual instruments’ Secure Data Network Data Grid Semantic Grid

National Data Architecture Virtual Laboratory Institutional Storage Secondary Storage Secondary Storage Institutional Storage Backup Storage Primary Storage Primary Storage Archive Storage Backup Storage Archive Storage

National Data Architecture Virtual Laboratory Institutional Storage Secondary Storage Secondary Storage Institutional Storage Backup Storage Primary Storage Primary Storage Archive Storage Backup Storage Archive Storage

National Data Architecture Virtual Laboratory Institutional Storage Secondary Storage Secondary Storage Institutional Storage Backup Storage Primary Storage Primary Storage Archive Storage Backup Storage Archive Storage

Data and Semantic Grid Development Coordinated research and development programme Integration with international activities Involvement of formal and informal networks of scientists Phased approach: –Phase1: Quick runs using available technologies with key metadata to facilitate later stages –Phase 2: Provide support tools and services for data management –Phase 3: Develop technologies/techniques for semantic grid.

Project Costs Data Centre - Capital: $5M, Operating: $2M/a Regional ‘virtual’ nodes: (each) Capital: $0.5M, Operating $0.3m/a Data Grid and Semantic Grid Research and Development: $3M Network and other costs: $1M –excludes building costs

Project Timelines

Operational Structure Formal project management structure and processes Formalise operational management of data