Green Drop Compliance in Johannesburg Etienne Hugo General Manager: Operations Johannesburg Water (Pty) Ltd.

Slides:



Advertisements
Similar presentations
Introduction to Concurrency Management. What is Concurrency? Chapter , F.S. requires Comprehensive Plans to adopt a concurrency management system,
Advertisements

C MKT Overview of CH2M HILL US Civil Nuclear Industry Programme in Romania September 2009.
1 © 1999 Deloitte Consulting Infrastructure Sub-processes In Scope – Plan and Manage Business.
DRAFT 2009/10 TO 2011/12 MEDUIM TERM REVENUE AND EXPENDITURE FRAMEWORK BUDGET.
IPN-ISRAEL WATER WEEK (I2W2)
Drinking Water Through Recycling The benefits and costs of supplying direct to the distribution system Dr Stuart Khan School of Civil & Environmental Engineering,
RELIABLE SUPPLIERS Supply Chain Management and Procurement policies in place Supply Chain Management and Procurement policies in place Register all suppliers.
WWTF’s MPCA Permit Renewal January 14,  Our current NPDES permit expired Sept. 30,  NPDES permits are a 5 year term.  Upon expiration,
INTRODUCTION TO ISO Joan Kithika. OUTLINE DEFINITIONS WHY ENVIRONMENTAL MANAGEMENT? LEGAL OVERVIEW HOW TO MANAGE THE ENVIRONMENT-AN ENVIRONMENTAL.
FY Budget Presentation to Board of Finance March 31, 2014 SWPCA William P. Brink, Executive Director Rhudean Bull, Administration Manager.
1 CITY OF MONROE WASTEWATER DEPARTMENT BUDGET Presented by Barry S. LaRoy, P.E. Director of Water & Wastewater Utilities March 27, 2010.
OUTCOMES AND STRATEGIC ISSUES FROM THE MCC WSLG 19 November
Air Conditioning Inspection Certificates Low Energy Consultancy can help LEC Ltd can conduct and provide ACI certification for all Air Con installed equipment.
1 Water Services Training Group 16 th Annual Conference Water Sector Reform Programme Implementation INEC, Killarney, 8 th November 2012.
UK WIR The UK Experience Christopher Royce Anglian Water Services.
DEPARTMENT OF HUMAN SETTLEMENTS- SANITATION INPUTS ON NATIONAL WASTE MANAGEMENT STRATEGY 29 MAY 2012 By Mandisa Mangqalaza.
Evaristo Oliveira – Eng. International Committee of the Red Cross Water & Habitat Unit.
WHAT TO EXPECT FROM SANS 241:2015
DEPT OF ESTATES AND FACILITIES Engineering Team DEPT OF ESTATES AND FACILITIES Engineering Team Annual Report 2004/05 Presented by: Russell Smith Estates.
TRP Chapter Chapter 4.2 Waste minimisation.
The Role of Local Government in implementing Biogas Projects Barry Coetzee, Head: Integrated Waste Management, Strategy & Policy Solid Waste Management.
Institute for Resource Efficient and Sustainable Systems Graz University of Technology From Cleaner Production to Zero Emissions May 12, 2005 From Cleaner.
Sustainable Consumption and Production
What is it? Why it is so important?
Part 2 - Simplified Strategy. The IWCM Process The IWCM process consists of two main parts: Part 1: An Evaluation Study ( recently completed); and Part.
FOG Guidance Document Launch Seminar 26th January 2012 Water Services Training Group Guidance Document Control of Fat Oil and Grease Launch Seminar 26.
CP methodology adapted to UNFCCC Swedish International Development Agency S ESSION 9.A United Nations Environment Program Division of Technology Industry.
Using the Logical Framework to Develop Activity and Resource Schedules.
A N N I S T O N A R M Y D E P O T Environmental Management System Implementation at Anniston Army Depot April 8, 2004.
Patient Safety Friendly Hospital Intiative Purpose Implementation of a set of patient safety standards in hospitals Implementation of a set of patient.
Immovable Assets Unbundling. Purpose The Fixed Asset Register does not function independently of the other financial and management systems. A comprehensive.
1 Water Services Training Group 19 th Annual Conference Optimising Services Delivery in the Water Industry Radisson Blue Hotel Sligo, 3 rd. September 2015.
Orange County Utilities Department Water and Wastewater Budget Challenges March 9, 2010.
Circuit Rider Training Program (CRTP) Circuit Rider Professional Association Annual General Meeting and Conference August 30, 2012.
An overview of Demand Side Management (DSM) Implementation in RSA Morore Mashao ESKOM - DSM.
P A L M E R D E V E L O P M E N T G R O U P P D GP D G City of Cape Town An Update of the Water Services Financial Model 26 October 2006.
1 Water Services Training Group 17 th Annual Conference Creating a new Irish Water Industry INEC, Killarney, 5 th September 2013.
Sustainable Cities through Environmental Compliance and Enforcement Kenneth Markowitz 19 October 2015.
January 2013 Action Plan Skills Building: Module 4 Implementing and Evaluating the Action Plan.
District Improvement Plan
WSNTG Annual Conference September 2006 Water Services National Training Group 10 th Annual Conference 7 th September 2006.
Estates across STFC This presentation is to give PPD the opportunity to respond to proposals for the future management of Estates across STFC The proposals.
Parliamentary submission on the eradication of the Bucket Toilet System 22 & 23 February 2007 Cllr. Derrick Ndlovu.
Goal 4: Environmental To blend our residential and commercial properties with our “City of Parks and Trails” image to create sustainable framework of.
Rarotonga 29 th January, What is an EMP? An EMP sets out how a business will undertake its operation to manage pollution risks. EMPs deal with pollution.
Welcome to Chokhavatia Associates For over 30 years, Chokhavatia Associates has been delivering world-class, award-winning design solutions with all the.
Budget Study Sessions ENVIRONMENTAL & UTILITY SERVICES Proposed Operating Budget OUTCOMES: -Reliable Utility Infrastructure -Healthy.
1 EASTERN MUNICIPAL WATER DISTRICT Fiscal Year 2014 / 15 Fourth Quarter Enterprise Performance Measures Update John Ward Director of Engineering.
UTILITY PARTNERSHIP CITY OF STOCKTON & OMI / THAMES WATER SERVICE CONTRACT.
Essential Requirements of Pool Management Companies
Butibori CETP Pvt. Ltd. Environmental Activities & Technological Initiatives Plot No. P-13 Near Indorama Gate No-1, MIDC Industrial Area, Butibori, Nagpur.
Municipal Water Infrastructure Grant (MWIG)
Wastewater Fee Increases
Lecture : Tasks and Responsibilities in the Management of Healthcare Wastes Which one do you want ? by Dr Mohammed Ali Al Zahrani.
Meeting Standards and Expectations in the Water Industry
Presentation by Department: Water Affairs 22 March 2011
Water Quality and Water Security towards a joint action plan to continue to improve the quality of life of SA’s people through improved water quality.
OHS Staff Introduction Training
Management of Change Report Errors to Management.
Treatment –Reverse Osmosis (Desalination)
City of Rehoboth Beach Water and Wastewater Financial and Rates Review
Patient Safety Friendly Hospital Intiative
WASTEWATER MANAGEMENT 19 September 2018
Green Drop KPA Score Allocation
Assessment of the Implementation of the Programmes of Measures
Industrial Effluent Discharge and Pollution Renaldo du Toit
Sustainable Industrial waste water management
Water Director's Meeting May 2013, Dublin DG Environment
COX’S BAZAR,BANGLADESH. SEWAGE TREATMENT PLANT INTRODUCTION  Sewage treatment is the process of removing contaminants from waste water and household.
The Role of Local Government in implementing Biogas Projects Barry Coetzee, Head: Integrated Waste Management, Strategy & Policy Solid Waste Management.
Presentation transcript:

Green Drop Compliance in Johannesburg Etienne Hugo General Manager: Operations Johannesburg Water (Pty) Ltd

Presentation Introduction to Johannesburg Water. Objectives of sewage treatment. Factors affecting “green drop” compliance. Consulting Engineers appointments. Process Controllers and Maintenance. Capital and Operational expenditure. Conclusions.

Johannesburg Water (Pty) Ltd Johannesburg Water (JW) was established in January 2001 by City of Johannesburg for the delivery of water and sanitation services. JW manages, operates and maintains 6 wastewater treatment works. In 2009, the works produced 260 dry tons of sludge per day. (1550 m 3 / day at 17% dry solids concentration)

Treatment Works

Objectives of Sewage Treatment To produce an effluent quality that fully complies with the licence conditions at all times. To treat and dispose of sludge in compliance with the 2006 “Guidelines for the utilization and disposal of wastewater sludge”. To ensure that the above operations are cost effective, affordable and sustainable. To maintain safe and healthy working conditions. To prevent raw sewage overflows from entering streams and rivers..

Green Drop Compliance Factors affecting “green drop” compliance Appointment of consultants. Process Controllers. Maintenance. Opex and Capex. Conclusions.

Consulting Engineers Consulting Enginners requirements: Experience in designing for your licence conditions. Experience in designing for local conditions. Implementation of successful designs under the above conditions.

Consultant / Client Assess clients experience with various processes. List available processes that attain required results. Input from client / operational staff on process selection. Implement successful designs. Select proven mechanical equipment. Keep the whole process simple. Are existing staff able to operate and maintain the proposed design?

Process Controllers All treatment processes require some level of technology: Education must meet level of technology selected. Process controllers must be committed to attainment of objectives. Train in-house and only for needs. Give opportunity to develop skills.

Maintenance Implement a simple but effective maintenance programme. Outsource repairs to agents.

Capital Expenditure Capex used for new, replacement or major refurbishment of equipment. Require a five year plan for the above. Five year plan split into annual capital expenditure.

Operational Expenditure Targets must be set for high cost areas such as power and chemical consumption, salaries etc. Annual operational budget developed from previous years performance. Consider cost increases for power, chemicals, salaries etc. Carefully monitor expenditure.

Conclusions Carefully select consultants and ensure clients input into decisions made. Education, commitment, specific training and opportunity to develop cannot be substituted one for the other. Implementation of a simple maintenance programme is essential. Repairs to mechanical plant should be undertaken by the agents. Sufficient Capex and Opex must be made available for successful operational and maintenance performance.

THANK YOU FOR YOUR ATTENTION.