GLAST LAT Project DOE/NASA Review, March 31, 2004 1 GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager

Slides:



Advertisements
Similar presentations
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Tracker Test Plan Overview.
Advertisements

GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 IOC – S.Williams SAS - R.Dubois 1 Instrument Operations Center (IOC) and Science.
GLAST LAT ProjectLAT Face to Face, July 17-18, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center
GLAST LAT ProjectMonthly Review, September 1, Tracker SubsystemR. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S August Status Meeting.
GLAST LAT ProjectMonthly Status Meeting, June 30, Cost/Schedule Reports for 4.1 LAT Presentation Presentation May 2005 Month End Gamma-ray Large.
GLAST LAT ProjectNovember 04, 2005 Phase 0 TRR 1 GLAST Large Area Telescope: Integration and Test -Electrical Test- Phase 0 TRR Key Requirements Documents.
GLAST LAT Project June 6, 2007 NCRs and Waivers 1 GLAST Large Area Telescope Systems Engineering Test Status, NCRs and Verification Status Pat Hascall.
GLAST Large Area Telescope: Manufacturing Preparation Design Engineering Meeting Jerry Clinton 1 April 2003 Stanford Linear Accelerator Center Stanford,
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware July 2005 Status Marc Campell, Subsystem Manager.
GLAST LAT Project Integration and Test SVAC Peer Review 1 GLAST Large Area Telescope: I&T Integration Readiness Review SVAC Peer Review July 21,
GLAST LAT ProjectDOE Rebaseline Review, February 13, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Chief Engineer.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Aug. 14, 2001 Scott Williams 1 GLAST Large Area Telescope: Instrument Operations Center Scott.
GLAST LAT ProjectEngineering Meeting, April 1, GLAST Large Area Telescope Engineering Meeting Quality Assurance And Manufacturing Preparations April.
GLAST LAT ProjectEngineering Meeting, December 3, GLAST Large Area Telescope: Engineering Meeting December 10, 2002 Lowell A. Klaisner Stanford.
GLAST LAT ProjectSubsystem Managers Face to Face, November 17, GLAST Large Area Telescope: Darren Marsh Stanford Linear Accelerator Center Performance.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR-01967Section 15 Manufacturing & Processes 1 GLAST Large Area Telescope Manufacturing.
GLAST LAT Project Quarterly Review, Aug. 14, 2001 Gunther Haller1 GLAST Large Area Telescope: Electronics, DAQ & Flight Software Gunther Haller Stanford.
GLAST LAT ProjectSLAC Pre - Baseline Review, April 16, 2002 ` 1 GLAST Large Area Telescope: I&T Overview WBS: Elliott D. Bloom Stanford Linear Accelerator.
GLAST LAT Project4.1.7 July 17, 03 LAT Meeting G. Haller V41 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S LAT.
GLAST LAT ProjectJune Cost/Schedule Status Meeting 07/23/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to June Cost/Schedule.
GLAST LAT ProjectSubsystem Managers Meeting May 12, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
GLAST LAT Project18 July GLAST Large Area Telescope: NCR 529 Systems Engineering R. Bright Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
GLAST LAT Project LAT Monthly Apr SAS 1 Gamma-ray Large Area Space Telescope GLAST Large Area Telescope WBS 4.1.D SAS LAT Monthly Managerfest.
GLAST LAT ProjectF-to-F, June 15, TrackerR.P. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S Face-To-Face June Meeting Robert Johnson.
GLAST LAT Project May 2, 2007 NCRs and Waivers 1 GLAST Large Area Telescope Systems Engineering Test Status, NCRs and Verification Status Pat Hascall Systems.
GLAST LAT ProjectNovember 17, 2004 AntiCoincidnce Detector 1 GLAST Large Area Telescope: Face to Face Meeting November 17, 2004 AntiCoincidence Detector.
GLAST Calorimeter SLAC LAT Meeting 17Jul 2003 Naval Research Lab Washington DC wnjohnson 1 SLAC Meeting Calorimeter Subsystem 17 July 2003 W. N. Johnson.
GLAST LAT ProjectJune 30, 2004 Monthly Review Rev. C 1 GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR-01967Section XX 1 GLAST Large Area Telescope: LAT System Engineering WBS Dick Horn.
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 G. Haller 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR-01967Section 1 Introduction & Science Overview 1 GLAST Large Area Telescope: Introduction.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR Section 15 Manufacturing Process 1 GLAST Large Area Telescope Manufacturing Process.
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Engineering Model Tower.
National Aeronautics and Space Administration November 23, Gamma-ray Large Area Space Telescope (GLAST) Kevin Grady, Project Manager Steven Ritz,
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: Schedule Summary; Critical.
GLAST LAT ProjectFace to Face Managers Meeting 04/14/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Face to Face Managers.
GLAST LAT Project – Cost and Schedule ReviewJanuary 27, 2004 AntiCoincidence Detector 1 GLAST Large Area Telescope: Cost/Schedule Review January 27, 2005.
GLAST LAT ProjectMarch 24, H Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS H: Tower Shipping and Storage.
GLAST LAT ProjectApril 2005 Project Status Overview May 24, April, 2005 Lowell Klaisner LAT Project Manager Rev. - LAT Project Status Overview Gamma-ray.
GLAST LAT ProjectI&T&C Pre PDR Presentation – Oct 2, 2001 B. Grist1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 W. N. Johnson Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem.
GLAST LAT Project CAL Peer Design Review, Mar 17-18, 2003 W. N. Johnson Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem.
GLAST User’s Committee Meeting– 1 – June 6-7, 2005 GLAST Burst Monitor (GBM) Chip Meegan NASA/MSFC.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR-01967Section XX 1 PREP For CDR - April Schedule Wall Walk GSFC Chart Flip (Select) Post.
GLAST LAT ProjectDOE/NASA Baseline-Preliminary Design Review, January 8, 2002 Document: #1 GLAST Large Area Telescope: I&T Overview Elliott D. Bloom Stanford.
GLAST Calorimeter Monthly Cost / Schedule / Mission April 2004 Naval Research Lab Washington DC wnjohnson 1 Monthly Cost/Schedule/Mission Review GLAST.
SPP FIELDS DFB Quarterly November 21, 2014 Solar Probe Plus FIELDS Instrument Quarterly Digital Fields Board (DFB) 1.
GLAST LAT ProjectSLAC Internal Review, April 16-18, 2002 LAT-PR Electronics and Flight Software WBS GLAST Large Area Telescope: Electronics,
Bill Raynor Naval Research Lab
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Project Major Activities Over Next Days (as of xx/xx/xx)
Mechanical Integration
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope Instrument Science Operations Center
GLAST Large Area Telescope: Cost/Schedule Review September 1, 2005
GLAST Large Area Telescope:
Large Area Telescope Project
Lessons Learned and Earned Value Management System Assessment
GLAST Large Area Telescope
GLAST Large Area Telescope:
GLAST Large Area Telescope:
March ’05 Face to Face Meeting Introduction
Introduction and Overview
GLAST Large Area Telescope:
Overview Cost to Complete
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Presentation transcript:

GLAST LAT Project DOE/NASA Review, March 31, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager Gamma-ray Large Area Space Telescope Summary April 1, 2004

GLAST LAT Project DOE/NASA Review, March 31, MCM Burn-In & Test Apr 29, 2004 Tower Assembly & Test Jul 7, 2004 Tower A RFI Aug 18, 2004 Working Critical Path, 3/31/04 Tower 14 RFI Feb 15, 2005 LAT Assembly Complete Apr 8, 2005 System Test Complete Jun 28, 2005 Environmental Test Complete November LAT RFI November 12, 2005 Pre-ship/CD-4 Review June 29, 2005 This critical path based on Tracker estimates presented March 31, The schedule after Tower A will be worked to mitigate the resulting delay in LAT RFI.

GLAST LAT Project DOE/NASA Review, March 31, Mitigating late module arrival The project is focusing on integration and test of the first tower. The following are areas to work as we learn more about actual performance –I&T can use the additional time for more training and testing to reduce risk in integration and improve productivity. –Some part of System Test could be moved earlier and tested with a partial LAT configuration –System Test Period is 2 Shift/5 Days, could be up to 3 Shift/7 Days –Increase the production rate of modules by working second shifts, etc. –Investigate compressing the environmental test schedule from the present 15 weeks

GLAST LAT Project DOE/NASA Review, March 31, Summary The LAT is a challenging instrument Significant technical progress -- no major issues outstanding Producing flight hardware Overall project funding is adequate if stay on schedule Funding in the current fiscal year is an issue being worked Schedule is challenging –Focusing on installation of the first flight tower in the grid –Mitigating delays as they occur Delay in completing Grid design – Qualify 2 nd grid Delay in arrival of CAL ASICs -- Load parts before qualification Tracker delay due to test anomalies – Proceed with fabrication before testing is complete Project management needs to be proactive in identifying plans to mitigate potential future schedule delays A strong, talented staff that is committed to delivering this instrument and doing the science

GLAST LAT Project DOE/NASA Review, March 31, GLAST Feb 2007 launch