ISE4 Integrated Demo Ver 2 May 11, 2005. ISE4 Integrated Demo2 Revised Arrangements Demo Scenario Design agent –Export AP 216 hull form Navy –Import hull.

Slides:



Advertisements
Similar presentations
VeriSTAR-HLC (Hull Life Cycle) overview
Advertisements

Health and Safety Executive Health and Safety Executive Buy Quiet - A long-term strategy to influence the supply and purchase of low- noise machinery.
Softricity LLC Advance slides with arrow keys. Without PDMLynx Informal processes based upon excel, access, paper files No consistency across organization.
16 May06 1 Integrated Shipbuilding Environment 4 (ISE 4) Demonstration Overview Presentation for Seattle NSRP Panel Meetings May 16, 2006 Ron Wood Burt.
27 Apr ‘06 1 STEP translator for distribution systems for ShipConstructor ISE-2 & ISE-3 follow-up CATIA V4 to ShipConstructor piping demo ShipConstructor.
ISE 6 Phase 2 Demo Scenario Nov 20, Stakeholders ISEA –NSWC PHD (Combat Systems) –NSWCCD SSES (HM&E) Program Offices –PMS 500, etc. –IWS 1 (Combat.
Development of ISE Interoperability Modules
Warship 2010 The Application of Integrated Computing Technology to the Design, Construction and Lifecycle Support of Warships The Royal Institution of.
Adelija Čulić-Viskota
HELP GUIDE NEW USER REGISTRATION (SLIDE 2) TAKING A QUIZ (SLIDE 8) REVIEWING A QUIZ (SLIDE 17) GROUP MEMBERSHIP (SLIDE 26) CREATING QUIZZES (SLIDE 31)
Smart Grid - Cyber Security Small Rural Electric George Gamble Black & Veatch
NSRP Panel Meeting – San Diego Presented by: Bryan J. Miller Topgallant® Product Data Management and Collaborative Software for Shipbuilding.
1 Autodesk’s Manufacturing Solutions Kvalitetssikring i engineering processen Mads Storgaard.
Chapter 7 Functional and Enterprise Systems. Chapter 7Slide 2 Customer Relationship Management  Customer Relationship Management The philosophy that.
Advisor December 2009 User Council David Stevenson December 2, 2009.
2 Apr ‘08 1 DDG 1000 Logistics Data and Structure DDG 1000 Design Data and Structure Link between design and logistic data Current Logistics data import.
RAM Modelling in the Project Design Phase Friday 30 th April, 2010 Paul Websdane Reliability Modelling for Business Decisions Asset Management Council.
Vice President, Engineering NSRP Executive Director
Interim SCIM and STEP Implementation 2008 NSRP System Technology Panel Project Ted Briggs, Intergraph Corp. Mike Olson, Northrop Grumman Information Systems.
Reuse and Data Module Code Naming Considerations Mike Olson, Northrop Grumman IT Ted Briggs, Intergraph Integrated Shipbuilding Environment (ISE) ISE-6.
Agenda  Contract issues?  Review AP 214 Linkage mechanisms  Review external reference mechanisms  Populate PDM schema  Next Steps.
Integrated Shipbuilding Environment
Integrated Logistics Environment (ILE) NSRP Joint Panel Meeting 7 – 9 December 2010 New Orleans, LA 1 Presented by: Michael Olson Northrop Grumman Technical.
1 ILE Project Integrated Logistics Environment Kickoff Meeting Subtask 1.2 Sharing Structural Design Data with Manufacturing Systems Presented by: Michael.
27 Apr ‘06 1 Integrated Shipbuilding Environment (ISE) ISE4 Project Demonstration April 27, 2006.
1 Improving Interoperability through the use of ISO Presented by : Ron Wood Date:August 25, 2005.
STEP Shipbuilding Demonstration Highlights Integrated Shipbuilding Environment 4 (ISE 4) 26 June 2006 Ron Wood.
27 Apr ‘06 1 Integrated Shipbuilding Environment (ISE) Overview April 27, 2006.
1 ILE Project Integrated Logistics Environment Kickoff Meeting Location:Mystic Marriott Hotel Groton, CT Date:Thursday, June 17, 2010 Overview Presented.
1 Integrated Logistics Environment (ILE) Project Presented by : Dr. Burton Gischner Date:May 3, 2011 NSRP Joint Panel Meeting San Diego, CA.
30 April Enabling Shipbuilding Interoperability ISE-6 Project Exchange of Product Models for Life Cycle Support ISE-6 Final Demonstration Overview.
2 Apr ‘08 1 DDG 1000 Logistics Data and Structure DDG 1000 Design Data and Structure Link between design and logistic data Current Logistics data import.
Leading Edge Architecture for Prototyping Systems An Overview.
AP210: Electrical/Electronics PCA Design Information Physical Component Placement Bare Board Geometry Layout items Layers non-planar, conductive & non-conductive.
Operations Management And Planning
Design Flow 1 Mission Req (ASSET) Initial design by space Detailed Design (Equip by Comp) Zone model Compartmention Model List of comp + req Compartmentation.
1 ILE Project Integrated Logistics Environment Kickoff Meeting Task 2 Completion of the Ship Common Information Model Presented by: Dr. Burton Gischner.
3 February Enabling Shipbuilding Interoperability ISE-6 Project Exchange of Product Models for Life Cycle Support ISE Overview Presentation (to.
Using and modifying plan constraints in Constable Jim Blythe and Yolanda Gil Temple project USC Information Sciences Institute
Publish ISO Technical Corrigenda for ISO , and NSRP Systems Technology Panel Project Pete Lazo Product Data Services Corporation.
© University of Strathclyde Martin Fitchie University of Strathclyde Research Presentation Day 2004 Integrating Tolerance Analysis and.
Copyright © The OWASP Foundation Permission is granted to copy, distribute and/or modify this document under the terms of the OWASP License. The OWASP.
OWASP ESAPI SwingSet An introduction by Fabio Cerullo.
ISE6 Demo 1/9/2008 Virginia Beach Meeting Discussion.
Interim SCIM and STEP Implementation 2008 System Technology Panel Project Ted Briggs, Intergraph Mike Olson, Northrop Grumman Ron Wood, Northrop Grumman.
Implementing Parametric CAD in STEP ???? Kenneth E. Wolsey May 16, 2007
ISE4 Alternate Demo Scenario Incorporates suggestions B. Kassel, S. Gordon, & B. Gischner with input from: T. Briggs and S. Moore May 23, 2005.
30 April Enabling Shipbuilding Interoperability ISE-6 Project Exchange of Product Models for Life Cycle Support ISE-6 Final Demonstration Overview.
7 Aug Integrated Shipbuilding Environment (ISE) ISE-6 Phase 2 DDG 1000 TDWG Collaboration Data Module Code (DMC) Naming Overview.
Getting Started with IT Academy E-Learning.
ISE 6 Phase 2 Demo Scenario Sept 11, 2008 NSWC CD.
ISE6 Demo Scenario From 8/30/2007 Telecon. 8/30/2007 ISE6 Demo Scenario 2 Demonstration Core idea: –Use of PLCS enables: Maintaining the right configuration.
ISE6 Demo 11/14/2007 Ft Lauderdale Meeting Discussion.
Industry Goals. Increase Customer Satisfaction  On-Time, On-Budget, Within Scope  Ensure High Quality Delivery Increase Margins  Drive Efficiencies.
Operational Planning to Sales – Instructor Led Training Integrated Supply Chain Demonstration Danny Smith Solution Architect, AGSS.
November 4, An Integrated Logistics Environment for an Effective Shipbuilding & Supporting Enterprise Prepared by: Dr. Burton GischnerElectric Boat.
1 ILE Project Integrated Logistics Environment Kickoff Meeting NPDI Project & SCIM Summary & Status Presented by: Rick Lobsitz (NGTS)
Publish ISO Technical Corrigenda for ISO , and NSRP Systems Technology Panel Project Pete Lazo Product Data Services Corporation.
March 24, ISE-6 Phase 2 Demo March 24, 2009.
Multipurpose Polar Icebreaking Subsea Work Vessel Niko Kantonen Santeri Ihalainen.
1 S HIP T ECH 2011 A S HIPBUILDING T ECHNOLOGIES I NFORMATION E XCHANGE Total Ownership Cost/Quality/Energy Efficiency Completion and Validation of the.
Lesson Two Ship Design. Contents Design essentials Design Procedure advances factors concepts requirements Detailed operation.
Project Outline I A New CRM database must accomplish the following:  Deliver support resources for internal IT  Integrate all data from existing CRM.
MVDC Collaboration MVDC Issues and Viability of Red Demo in Philadelphia.
REPAIR & MAINTENANCE Marina Zanne, M.Sc.
Functional and Enterprise Systems
Critical Infrastructure Assessment Kick-Off Meeting
Functional and Enterprise Systems
What Measure Will You Use?
Upgrading to S3D Technology: Automation API
Presentation transcript:

ISE4 Integrated Demo Ver 2 May 11, 2005

ISE4 Integrated Demo2 Revised Arrangements Demo Scenario Design agent –Export AP 216 hull form Navy –Import hull form - into Focus DB then to ASSET –Run ASSET to do ship arrangements - will add decks, pilot house, machinery spaces, also define requirements –Output to Focus DB, Export AP 215 Design agent –Import, complete ship arrangement –Add equipment Navy –Import back to LEAPS for vulnerability tool assessment –Generate recommendation Build yard –Import, fix arrangement

May 11, 2005ISE4 Integrated Demo3 Revised Arrangements Demo Scenario Initial ASSET Arrangement + Requirements (LEAPS) Build Yard Design Agent AP 216 Hull Initial Arrangement Complete Arrangement + Equipment Vulnerability Analysis (LEAPS) Vulnerability Report

May 11, 2005ISE4 Integrated Demo4 Arrangement Requirements (LEAPs) Initial Arrangement (Tribon) Updated Initial Arrangement (Sener) Initial Electrical System Design (KSSI) Ship check Project? Detailed Structural Design (Intergraph) FEM Analysis (EB) Structural Design Feedback (Intergraph) Neutral Manufacturing (ISPE) Yard Specific Manufacturing (EB & Intergraph )

May 11, 2005ISE4 Integrated Demo5 ISE4 Demo Scenario ASSET mission and compartment requirements generated in LEAPS (P21) Create initial compartment and equipment arrangement (Tribon XML) –Include importing vendor data for main engine - CPC + AP 203 –Incorporate Atlantec SBIR demonstration to import equipment? Update arrangement (Sener – P21) –Structural update required which impacts tank size (mission requirement) –Or incorporate Ship Check results to drive structural change Demonstrate Initial Electrical System design (KSSI) –Electronic system in Pilot House Transfer arrangements to detailed design (Intergraph) Extract structure for analysis (Intergraph) FEM analysis of Engine Room (EB) Feedback from Analysis (Ingr) Extract Structure for Manufacturing (Ingr) Develop neutral structural manufacturing model (ISPE) Generate yard-specific manufacturing data (EB, Ingr) –Compare EB and Avondale manufacturing outputs

May 11, 2005ISE4 Integrated Demo6 Demo Scenario Issues Better way to integrate Electrical into demo? Reason that arrangements are updated –Ship Check doesn’t fit with Initial Arrangement scenario If LEAPS does not provide initial ASSET data –Could provide reason arrangements are updated –Claim Navy Analysis programs determined xxx

May 11, 2005ISE4 Integrated Demo7 Eng Analysis Demo Scenario AP 203 P21 Shipyard (Add to CPC, CAD) Vendor Equip arrangement Ship Product Model (ISDP) AP 227 P28 Equip arrangement AP 215 P28 Compartmentation AP 216 P21 AP 218 P28 AP 209 P28 CPC CAD Parts Analysis (COG, weight, location) AP 209 /218 P28 GUID, doc URL Feedback

May 11, 2005ISE4 Integrated Demo8 Notional Mediators Required APARM -> AIMAIM-ARMARM-> 209 AIM P21 216Eng Analysis 215Arrangements 218Eng Analysis 227Eng Analysis 209Eng Analysis??

May 11, 2005ISE4 Integrated Demo9 Mediators Required / PLM ARM AIM P28 P21 P28 P21 P28