CCM Resources 1. Project Cost Overview Boards 3&4 (production boards-130 each type ) – Eng. changes and designer layout work – Done – Tech time to place.

Slides:



Advertisements
Similar presentations
M. Gilchriese US ATLAS Pixel Meeting July 18-19, 2002 UC Santa Cruz.
Advertisements

US CMS DOE/NSF Review: May 8-10, US CMS Cost & Schedule Mark Reichanadter US CMS Project Engineer DOE/NSF Review 8 May 2001.
PIP Update Oct Agenda Summary Update – Current Activities/Updates – Recent PIP News – Upcoming Talks, Reports, Meetings Updates/Talks: Ken Domann.
Summary of the SVD session 19 March 2009 T. Tsuboyama (KEK)
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
MICE-SciFi team, 14 October 2003 SciFi: progress report Progress: All stations shipped to FNAL … … assembly in progress Measurements: Effect of radiated.
Link Board Upscope Frascati group Napoli group Warsaw group.
4 Dec 2001First ideas for readout/DAQ1 Paul Dauncey Imperial College Contributions from all of UK: result of brainstorming meeting in Birmingham on 13.
Slide 1Rod Production presented by Jim Lamb (UCSB)April 9, 2004 Rod Production Rod Production, April , presented by Jim Lamb (UCSB)
Server Virtualization: Navy Network Operations Centers
From Research Prototype to Production
MQXF considerations MDT section 11/04/2012. Summary Revised planning Development Personnel Production: strategy and personnel Cost Planning issues not.
EE and SE Installation Wolfgang Funk - CERN CMS 11/9/ ) Introduction 2.) Installation scenario 3.) SE schedule, manpower, cost estimates 4.) EE.
CERN Erik van der BijTS-DEM TS-DEM Development of Electronic Modules Erik van der Bij CERN Electronics development support: how it is organized.
1 Jim Thomas - LBL 4.2 Meters ~ 1 Meter The SSD: March Face to Face Meeting Jim Thomas Lawrence Berkeley Laboratory March 14 th, 2012 The SSD.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
1 HO Upgrade: QC and Production Preparation in India Shashi Dugad India-CMS Meeting, BARC 30 July 2010.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese U.S. ATLAS Review Revised Version November 29, 2000.
CCM Resources 1. Project Cost Overview (1) Boards 1&5 (spares) [completed/to be done] – Eng. time to recover layout files. – Designer time for minor layout.
TE/MPE/EE J. Mourao T/MPE/EE 1 November 2012 LHC Machine Local protection Redundant Power supply (DQLPUR) & interface Module (DQLIM) progress status.
GEM chambers for SoLID Nilanga Liyanage University of Virginia.
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese Revised Version December 18, 2000.
11/22/2015S. Holm1 CMS HCAL TIMING & CONTROL MODULE(CCM) Cost and Status of V5 Boards –Boards 3 and 4 were modified to improve the QPLL and Crystal layout.
U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS1 CMS Project at UR Pawel de Barbaro University of Rochester DoE Review July 15-16, 2002.
PIP Update Dec. 4th Agenda Summary Update – Current Activities/Updates – Recent PIP News – Upcoming Talks, Reports, Meetings Updates/Talks: Ken.
CMS Si Tracker Project - US CMS Meeting at Riverside – May 19, US CMS Tracker Outer Barrel (TOB) Silicon Project Tim Bolton (for Regina Demina)
AFE IIt Project Status. Current Status  AFE II Prototype Testing Complete u Detailed ch by ch testing has been done s 3071 good channels out of 3072.
1 ME1/1 OTMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
1 ME1/1 ODMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
Deliverables, Cost, Manpower, Schedule & Maintenance Su Dong CSC Readout Replacement CDR Oct/8/
Rev of Run IIb, Nov 4-8, 2002, A. Bean 1 Silicon Management  Organization and Management  Schedule  Resources  Conclusions Alice Bean Univ. of Kansas.
P. Shanahan Nov 15, 2003 Page 1 MINOS WBS 2.3: Electronics, DAQ and Database Status Accomplishments since May review Near Detector Electronics production.
M. Brooks DC Meeting, 15-Sep-00 MuTr Mechanics Status SOUTH ARM: Chambers fabrication complete Stations 2+3 installed Station 1 test-installed will be.
L. Greiner1IPHC-LBNL Phone Conference 05/2012 STAR IPHC-LBNL Phone Conference News and updated ladder testing.
High Rate Tracking Test Beam Area David Christian & Richard Coleman.
Tevatron BPM Upgrade Stephen Wolbers CD Accelerator Coordination Meeting September 21, 2004.
M. Gilchriese Items from Talks U.S. Pixel Meeting Santa Cruz July 2003.
DOE/NSF Review of U.S. ATLAS May 21-23, 2003 CSC Mechanics and Electronics Paul O’Connor Tom Muller BNL May 22, 2003.
R. Boyd 1 February  Dr. M. Saleem  D. Jana  M. R. Meera Labbai  R. Boyd.
High Order Mode Suppressors (HOMS) for SPS TWC200 (Sébastien Calvo, David Bastard) 25 November 2015 LIU-SPS Coordination Meeting.
CMS Upgrade Workshop, FNAL, Nov 19-21, O.Prokofiev CMS Upgrade Workshop Updated ME4/2 chamber construction costs and prototype Status and plans.
25/04/2014R. Guida, A. Wasem PH-DT-DI Gas1 Outline ALICE gas systems meeting Outline Introduction Review usage of ALICE gas M&O 2013 Review achievements.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
Josh Stein 29-Apr-08 Undulator Controls Undulator Controls Status Update Josh Stein LCLS Undulator Controls CAM/TL.
INJECTORS BLM SYSTEM: PROGRESS REPORT Christos Zamantzas on behalf of the BLM team. MSWG 28/08/2015.
Technical Board Summary Alan Bross MICE CM17 CERN February 25, 2007.
3/7/20131 PHENIX WEEKLY PLANNING 3/7/2013 Don Lynch.
Cables Ian Crotty 8 May 2012 Cables for the RE4 Upscope in CMS News. The HV cables are in the Integration DB (INB/904) The Hv order is confirmed. Need.
Tracker cooling plant refurbishment Project status Revised plan Financial impact.
LARP Review, June 10, 2013Magnet Cost and Schedule – M. Kaducak 1 IR Quadrupole Cost and Schedule Marc Kaducak LARP Review June 10, 2013.
HE FEE Boards production status 26 th May 2016 Mandakini Patil 1.
ALICE Trigger Upgrade CTP and LTU Design Review ALICE CTP and LTU Upgrade Design Review CERN 27 th January 2016 Budget, time schedule, resources David.
9/29/2016E. Hazen - oSLB1 HO Trigger Links ● oSLB produced (69 pieces) – First few tested (by me) -- seem OK – Production testing to be done by student.
E. Hazen1 New DCC Status and Plans Jim Rohlf, Eric Hazen, Arno Heister, Phil Lawson, Jason St John, Shouxiang Wu Boston University.
Final CALICE OsC meeting: Status and summary of project
University of Wisconsin
CONS and HL-LHC day Analysis of needs from BE-CO
Next generation rad-hard links
Brief Status SPS Prototype PSB Prototype Installed in LS1
Outline Introduction to LHC Power Converters Remaining Inventory Observed Availability New inventory – FGClite Cumulative & SEE Effects Maintenance.
HCAL M&O-B Budget CMS Finance Board
CMS November Upgrade Week
Support Structure Fabrication
10/month is the present production rate 2 FTE + sporadic contributions
CDR Project Summary and Issues
BLM planning 24/02/2014.
BLM planning 03/03/2014.
Lehman 2000 Project Timeline
Plans for the 2004 CSC Beam Test
Presentation transcript:

CCM Resources 1

Project Cost Overview Boards 3&4 (production boards-130 each type ) – Eng. changes and designer layout work – Done – Tech time to place POs and gather parts, place POs for PCBs/board assembly. – Tech time for functionality testing at FNAL. Eng/tech time for debugging. Shipping to CERN. – Radiation Testing (chips at CERN, CCMs at MGH) – CCM testing at 904: Eng. Time+Travel + Physicist Travel + student COLA – I&C at Point 5: Russian Tech(s) time + student COLA (2) 1 Teams of 2 Techs to harvest and reinstall CCMs (Arefiev + Smirnov/Epshteyn (if available)) + 2 students to modify CCMs and test 2

Production Boards 3&4 – 108 CCMs needed for HB/HE/HO Full Production – 130 boards of each type (includes spares + test stands + test beam) 130 additional along with 25 prototype – PCB fabrication (2 weeks) – Parts procurement (3 days – 1 week) – PCB assembly (2 weeks) – Board testing + debugging (20 days) [tech + physicists] – Should take months after project approval/funding (slower due to holidays). Parts procurement can start as soon as project is approved, but some parts have long lead-times. If rad testing is required, it will need to be done simultaneously to meet the installation schedule. 3

I&C Summary CCM installation CMS has scheduled access time for the jumper intervention to resolve the RBX data loss problems – CCM will already need to be unstacked. Swapping out boards 3&4 is straightforward 130 sets of new Boards 3 & Board 4 will be ready (tested with 10 day burn-in) by 1 May 2013 There is sufficient access to have extended functionality testing time in CMS in the proposed CCM intervention plan HCAL is in close communications with TC for coordinating the LS1 activities 4

I&C Cost estimate Labor needed (Jan-Aug) – Skilled techs to remove/install CCMs from RBX (2-3 Russian techs) – 2 teams of 2 students for work in 904 (4 students total – could have international contribution here) Test and burn-in CCM boards Stack/unstack of CCM cardpack Clipping jumper Install new Boards 3 & Board 4 Test modified CCMs Labor in current LS1 planning for CCM jumper work (US/Protvino) Russian techs 2 students Additional 2 students needed for CCM Board 3&4 work International HCAL may provide the additional 2 students needed ($0 cost) If not, the incremental cost is COLA for 2 students for 9 months (US rates) – 1000 kCHF x 9 x 2 = kCHF (x1.1 for exch rate) = $19800 If needed, we can provide 1 physicist for testing at CERN $8k travel (per month) Total labor needed for I&C is an incremental change to the current US HCAL LS1 labor plan $ $8k = $27800 Cost range ($0 -$27800), depending on international support and required physicist travel support 5

Summary Boards 3&4 Cost (130 additional boards of each type) Board #3 & #4 (130 boards each type)Per boardTotal M&S (itemized:not incl 18% overhead) PCB Fab$24.10/$25.25$6415 Parts (#3/#4)$100/$90$24700 Assembly (130 x 2 boards)$9.31/$9.66$2466 Total for M&S (Incl overhead)$39625 (total:$ %) Labor for Production (incl overhead) Parts Procurement~$ x 2 boards [tech + physicists] (test+debug) $12500-$20k Radiation Testing (if needed)$0-$16500 Total Production Labor$15500-$39500 Labor for I&C [CERN Testing + I&C (LS1 group+2 students+ travel)] $0-$27800 Total Cost Range$ $

Summary New Board 3&4 design will make the CCM more robust to QPLL failures – This redundancy is built into the new ngCCM but did not exist in the old design. CCM production schedule and I&C plan is tight, but achievable – The full 130 sets of Board 3 & 4 will be tested/burned-in by May 1, in time for installation Overall incremental cost in terms of CCM interventions already planned in LS1 (jumper removal) is not large. Cost of the production quantities of new CCMs should be looked at in view of the cost to support the CCM hardware in the past – 1 FTE (Dick + grad student) per year While this maintenance need won’t disappear completely, we hope it will be greatly reduced to <<1 FTE 7