GENERATION PROTOCOL AND SETTLEMENT TODAY COMET WG / RMS Workshop Electric Reliability Council of Texas May 2, 2007.

Slides:



Advertisements
Similar presentations
Distributed Generation (DG)
Advertisements

Ramping and CMSC (Congestion Management Settlement Credit) payments.
9/22/00 1 Jerry W. Smith. 9/22/00 2 Jerry W. Smith.
MISO’s Midwest Market Initiative APEX Ron McNamara October 31, 2005.
SPP.org 1. Status Update: Retail Open Access for ETI within SPP Stakeholder Meeting September 16 th, 2008 Austin, TX.
Raine Cotton  Registered DG settlement is in accordance with Protocol Section as Real-Time Energy Imbalance at a Load.
Loads Acting as a Resource Relationships with QSEs and LSEs
Electricity Markets Overview Lo-Cal seminar, 09/21/2010.
Utility Regulation March 10, 2011 Raj Addepalli Deputy Director, Electric, Office of Electric,Gas and Water New York State Department of Public Service.
Demand Response in MISO Markets NASUCA Panel on DR November 12, 2012.
ERCOT Billing, Settlement Disputes & Data Extracts
October 28, 2014 Update to RMS 1. * Reviewed and Discussed: * ERCOT Protocols and Retail Market Guide Requirements * TDSPs’ Data Processes for IDR vs.
Hurricane Rita. 2 ERCOT Preparation ERCOT started alerts to QSEs and TOs on 9/21 Did a site failover of EMMS system Austin Taylor Procured satellite voice.
Warren Lasher Director, System Planning October 4, 2014 Our Energy Future.
Welcome New York Independent System Operator. (Pre-NYISO) Regulated Market Physical contracts Regulated industry Cost Based System Two Party Deals Bundled.
ERCOT WHOLESALE MARKET OPERATIONS MODULE 2. 2 Essential Concepts Ancillary Services Congestion Management Topics.
DC Tie Reservation and Scheduling with Mexico Shams Siddiqi representing Sharyland Utilities WMS Meeting May 15, 2007.
ERCOT MARKET EDUCATION
Current DG Framework for Competitive Areas of ERCOT DREAM TF September 28, 2015.
1 Welcome to Load Participation Orientation Elev MenWomen Phones Info Presentation and other Load Participation information will be posted at:
Ontario Electricity Supply Forum PEO Mississauga Chapter - September 6, 2007 Rhonda Wright-Hilbig, P.Eng Market Analysis - IESO.
Distributed Energy Resources Concept Document Discussion ERCOT Staff DREAM Task Force Aug. 25,
Bulk Power Transmission System
ERCOT MARKET EDUCATION
ERCOT MARKET EDUCATION Retail 101. Introductions, Roles and Responsibilities.
June 17, Strategic Framework Business Definition and Strategic Issues Board of Director’s Meeting June 17, 2003 ERCOT Strategic Planning Task Force.
Grabbing Balancing Up Load (BUL) by the Horns December 2006.
PJM©2013www.pjm.com Economic DR participation in energy market ERCOT April 14, 2014 Pete Langbein.
COMMERCIAL OPERATIONS ORGANIZATION Betty Day Director, Commercial Operations (office) (cell) (fax)
1 ERCOT Wholesale Settlement Module 3. 2 BENA iq = -1 * (Σ (RI iz + LI iz + URC iz + MISD iz + MISR iz ) z + TCRPAY Bei + Σ CSC Bei ) * LRS iq Can you.
COMPLIANCE ROLLOUT Vann Weldon Compliance Training Administrator March 23, 2005 NERC FUNCTIONAL MODEL REVIEW.
PJM© Demand Response in PJM 2009 NASUCA Mid-Year Meeting June 30, 2009 Boston, MA Panel: Price Responsive Demand – A Long-Term Bargain.
SPP Presentation. Retail Open Access for ETI within SPP Implementation Considerations Stakeholder Meeting February 21, 2007 Austin, Texas.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations May 8, 2012 – COPS Meeting May 9, 2012 – WMS.
ERCOT MARKET EDUCATION Retail 101. Retail Transaction Processing.
RMS/COPS Workshop VI 1 October 06, Antitrust Admonition ERCOT strictly prohibits Market Participants and their employees who are participating in.
ERCOT MARKET EDUCATION Retail 101. Smart Meter Technology.
01/17/ CP Discussion October 16,2002 Retail Market Subcommittee Austin, Texas.
ERS Update – DSWG Presentation September 21, 2012.
1 Presentation MIT November 14, 2011 Metering Issues Taskforce (MIT) Elimination of Time Error Correction Potential Impact on Wholesale Settlements.
RMS Update to TAC October 5, RMS Activity Summary 2008 Test Flight Schedule Update on TAC directive relating to identifying issues with net metering.
Floyd Trefny, P.E. Director of Wholesale Market Design Nodal Market Tools to Manage Wind Generation January 29, 2009 Presentation to the Renewables Technology.
Distributed Generation Registration June 30, 2008.
Product-Pricing Strawman David Sun Ali Ipakchi 26 October.
ERCOT MARKET EDUCATION Retail 101. Introductions, Roles and Responsibilities.
ERCOT MARKET EDUCATION Retail 101. Advanced Meter Technology.
Wholesale Electricity Spot Market (WESM)
ERCOT Public 1 Project Panel 1 Dan Woodfin Director, System Operations August 15, 2014.
ERCOT Wholesale Market Basics Module 3 Settlement.
COPS – ERCOT PROJECTS UPDATE WHOLESALE MARKET DEVELOPMENT Paula Feuerbacher October 20, 2004.
RPRS Settlement Examples Market Support Services March 30, 2005 March 14, 2006 Presented by ERCOT Art Deller Bill Kettlewell.
Role of Account Management at ERCOT 2006 TAC Subcommittee Review ERCOT Board February 21, 2006.
Lead from the front Texas Nodal 1 High-Level Overview of draft NPRR implementing PUCT Rule Posting Requirements January 8,
Real Time Balancing (RTB) & Resource Plan Statuses Change to the QSE practice of showing offline units as online and available ERCOT Presentation to ROS.
Current Nodal OS Design 1.The NMMS database will have an OWNER and an OPERATOR designation for each piece of equipment in the model. The OWNER and OPERATOR.
March 22, 2011 ERCOT Board of Directors Commercial Market Operations Version 2 - Updated on March 18, 2011 Betty Day.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations June 27, 2012 – ETWG Meeting.
07/27/2006 Overview of Replacement Reserve Procurement ERCOT Staff PRS RPRS Task Force.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations November 2, 2012 – RCWG Meeting.
Texas Nodal Program ERCOT Readiness & Transition (ERT) Supplemental Information TPTF January 12, 2009 Kevin Frankeny.
ERCOT MARKET EDUCATION
TAC Report to the ERCOT Board
ERCOT Wholesale Market Basics
Hurricane Rita.
NPRRs 815NPRR Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service.  This Nodal Protocol Revision Request (NPRR) revises.
The New Texas Wholesale/Retail Market
ERCOT Program Mock Market Approach Nov 15, 2000
Energy Storage Settlements Consistent with PUCT Project & NPRR461
Texas Energy Market About ERCOT ERCOT market participants
Texas Energy Market About ERCOT ERCOT market participants
Presentation transcript:

GENERATION PROTOCOL AND SETTLEMENT TODAY COMET WG / RMS Workshop Electric Reliability Council of Texas May 2, 2007

2 2 ERCOT GENERATION PROTOCOL AND SETTLEMENT ERCOT’s RoleERCOT’s Role Market Participant RolesMarket Participant Roles Generation RegistrationGeneration Registration Protocol and Operating Guide References Market Functions and Process to Realize Settlement Energy Settlement for Resources Topics

3 3 May 2, 2007 ERCOT’s Role as defined in the protocols: System Reliability System Reliability Facilitate Wholesale Market Facilitate Wholesale Market Facilitate Retail Market Facilitate Retail Market ERCOT GENERATION PROTOCOL AND SETTLEMENT

4 4 May 2, 2007 (3) Core Process to fulfill its role: Market Operations Market Operations Power Operations Power Operations Commercial Operations Commercial Operations ERCOT GENERATION PROTOCOL AND SETTLEMENT

5 5 May 2, 2007 Day-Ahead Ancillary Services Capacity Market Day-Ahead Ancillary Services Capacity Market Selection & Dispatch based on competitive bids Selection & Dispatch based on competitive bids “Balanced” schedules by QSEs “Balanced” schedules by QSEs Market Operations ERCOT GENERATION PROTOCOL AND SETTLEMENT

6 6 May 2, 2007 Managing Reliability – Keeping the lights on by ensuring: - Adequate transmission capacity - Adequate reserves (Ancillary Services), “just in case” - Adequate instructions are provided to participants Power Operations ERCOT GENERATION PROTOCOL AND SETTLEMENT

7 7 May 2, 2007 The ERCOT power operations system monitors and analyzes all grid components every 2-4 seconds for status, loading and output. In conjunction with the transmission control centers of the TDSPs ERCOT directs the safe and reliable operation of the power system. Power Operations ERCOT GENERATION PROTOCOL AND SETTLEMENT

8 8 May 2, 2007 Commercial Operations Operation of the retail transactions and financial settlement of the wholesale market Registration Registration -Retail premises -Market participants Retail Transactions Retail Transactions Data Acquisition Data Acquisition Load Profiling Load Profiling Data Aggregation Data Aggregation Settlement and billing Settlement and billing ERCOT GENERATION PROTOCOL AND SETTLEMENT

9 9 May 2, 2007 Qualified Scheduling Entities (QSE) Only QSEs can schedule, bid and financially settle with ERCOT for energy and capacity Functions: Schedule Load and Generation Schedule Load and Generation Bid into the Ancillary Service market Bid into the Ancillary Service market Provide Ancillary Services Provide Ancillary Services Power Marketing Power Marketing Settle with ERCOT Settle with ERCOT QSE Market Participants ERCOT GENERATION PROTOCOL AND SETTLEMENT

10 May 2, 2007 Resources (RES) Generation Facilities capable of providing energyGeneration Facilities capable of providing energy Loads capable of decreasing demand (LaaR)Loads capable of decreasing demand (LaaR) Can Provide reserve capacityCan Provide reserve capacity All Resources must be represented by a QSE Market Participants ERCOT GENERATION PROTOCOL AND SETTLEMENT

11 May 2, 2007 TDSP Transmission & Distribution Service Providers (TDSPs) Local distribution / electric delivery companyLocal distribution / electric delivery company Own / maintain transmission linesOwn / maintain transmission lines Work with ERCOT in retail switching processWork with ERCOT in retail switching process Provide meter data to ERCOT for Settlement*Provide meter data to ERCOT for Settlement* Rates for service remain regulated by PUCTRates for service remain regulated by PUCT * ERCOT polls certain meters; some entities use a MRE Market Participants ERCOT GENERATION PROTOCOL AND SETTLEMENT

12 May 2, 2007 Resources (RES) Registration ERCOT GENERATION PROTOCOL AND SETTLEMENT

13 May 2, 2007 Resources (RES) Registration ERCOT GENERATION PROTOCOL AND SETTLEMENT

14 May 2, 2007 Resources (RES) Registration ERCOT GENERATION PROTOCOL AND SETTLEMENT

15 May 2, 2007 Resources (RES) Registration ERCOT GENERATION PROTOCOL AND SETTLEMENT

16 May 2, 2007 Distributive Resources Protocol and Operating Guide Reference ERCOT GENERATION PROTOCOL AND SETTLEMENT Section 16.5 – Registration of Generation Resources… Every Generation Resource connected to the ERCOT Transmission System, distributed generator over one (1) megawatt (MW), Load acting as a Resource and EILS Resource must register with ERCOT. Distributed generation is an electrical generating facility located at a customer’s point of delivery (point of common coupling) of ten (10) megawatts (MW) or less and connected at a voltage less than or equal to sixty (60) kilovolts (kV) which may be connected in parallel operation to the utility system.

17 May 2, 2007 Distributive Resources Protocol and Operating Guide Reference ERCOT GENERATION PROTOCOL AND SETTLEMENT Section – TDSP Metered Entities TDSPs are responsible for supplying ERCOT with meter data associated with: 1.All Loads using the ERCOT System; 2.Any Generation Resource that delivers less than ten (10) MW to the ERCOT System and that is connected directly to the distribution system; …. meter data is not required from: (a)generation owned by a NOIE and used for NOIE’s self-use (not serving Customer Load); and (b)renewable generation with a design capacity less than fifty (50) kW interconnected to a TDSP and not registered as a Generation Resource

18 May 2, 2007 Distributive Resources Protocol and Operating Guide Reference ERCOT GENERATION PROTOCOL AND SETTLEMENT Operating Guide Section – Power Generation Companies This Section defines the minimum requirements for the integration of generation facilities greater than 10 MW into the ERCOT System. A generation facility shall be defined as any individual generating unit at a plant location that supplies energy to the ERCOT System. Each generation facility shall meet the following general requirements in order to integrate into the ERCOT System. Physically located in the ERCOT Control Area, Represented by a QSE represented PGC, or directly by a QSE.

19 May 2, 2007 Distributive Resources Protocol and Operating Guide Reference ERCOT GENERATION PROTOCOL AND SETTLEMENT Operating Guide Section – Power Generation Companies The QSE reporting for a PGC or a generation facility shall provide the following telemeter quantities for generation facilities greater than 10 MW to ERCOT Control Area Authority: Generator megawatts, Generator megavars, Generator energy (megawatt-hours), Substation equipment status, and Voltage where the facility connects to the Transmission Grid The directly connected TDSP may obtain any required data from ERCOT.

20 May 2, 2007 Distributive Resources Protocol and Operating Guide Reference ERCOT GENERATION PROTOCOL AND SETTLEMENT Operating Guide Section – Power Generation Companies The PGCs reporting QSE shall, as a minimum, provide adequate modeling information, as follows: Machine impedance and characteristics, Excitation system data, governor system constants, Transformer impedance, and Other relevant information.

21 May 2, 2007 Balanced Schedules & “Relaxed” Balanced Schedules & “Relaxed” Balanced Schedules For each Interval of a QSE schedule: Qty of Resources and Obligations must Balance Qty of Resources and Obligations must Balance Bilateral Transactions must Match (Qty, QSE, Zone) Bilateral Transactions must Match (Qty, QSE, Zone) QSE may set obligations equal to supply, and/or schedule BES via ERCOT to meet Obligations* QSE may set obligations equal to supply, and/or schedule BES via ERCOT to meet Obligations* Resources: Generation or purchases Obligations: Load or sales * Limited by QSE’s collateral with ERCOT ERCOT GENERATION PROTOCOL AND SETTLEMENT

22 May 2, 2007 What is the Resource Plan? Each QSE representing a Resource or Load Acting as a Resource must submit a Resource Plan!! Plan of how Generation Resources will operate Due to ERCOT by 4:00 pm of the day-ahead period Used by ERCOT to determine resource adequacy Validated against balanced schedules Let’s Check Under the Hood! Resource Plan ERCOT GENERATION PROTOCOL AND SETTLEMENT

23 May 2, 2007 Wholesale Market Timeline ERCOT Market Timeline Market Operations Adjustment Period: Precedes Operating Period Operating Period: Balancing Energy Clearing Occurs every 15 minutes Power Operations Day-Ahead Period: 6:00am to 6:00pm prior to Operating Day. Commercial Operations Initial Settlement 10 days after Operating Day Final Settlement 59 days after Operating Day True-up Settlement: 180 days after Operating Day And/or specific Protocol Criteria is met ERCOT GENERATION PROTOCOL AND SETTLEMENT

24 May 2, 2007 How does ERCOT acquire meter data? ERCOT GENERATION PROTOCOL AND SETTLEMENT

25 May 2, 2007 TDSPs Send Meter Data to ERCOT Data is submitted to ERCOT via “EDI 867 Transactions” and loaded into ERCOT’s LODESTAR system for settlement. “EDI 867 Transactions” EDI: Electronic Data Interchange Data Acquisition

26 May 2, 2007 EPS Meter Data Collection Polled directly by ERCOTPolled directly by ERCOT ERCOT converts the raw data to Settlement QualityERCOT converts the raw data to Settlement Quality MV90 is Data Collection SoftwareMV90 is Data Collection Software MV90 ERCOT initiates remote communication Meter data downloaded by ERCOT (15-minute data) Data Acquisition

27 May 2, 2007 DC Ties NOIE Points of Delivery When is an EPS meter required? In general, generation: –Directly connected to transmission system –>10MW –Ancillary Services –Auxiliary Load Also: –Bi-Directional NOIE Points of Delivery –DC Ties Generation Data Acquisition

28 May 2, 2007 ERCOT settles for services procured to manage the Texas power grid. Capacity Settlement Settlement Calculations Settlement of What? Energy Settlement

29 May 2, 2007 Balancing Energy Resource Imbalance Load Imbalance OOME Uninstructed Resource Charge Congestion Mismatched Schedules BENA Energy Settlement Calculations

30 May 2, 2007 oScheduled Generation - Metered Generation oPaid/charged at MCPE oWhy an imbalance? Instructed Deviations Uninstructed Deviations (may be subject to URC) Do all Resource Imbalances result in payments to the QSE? Resource Imbalance Protocol Energy Settlement Calculations

31 May 2, 2007 RI izq = (QRS izq - MR izq ) * MCPE iz Resource Imbalance Protocol Terms RI : Resource Imbalance Amount QRS: Scheduled Resource MR: Metered Resource MCPE: Market Clearing Price for Energy Translation: Resource Imbalance is the difference between the Scheduled and Actual Resource output times the Clearing Price for Energy. Subscripts i: Interval z: Zone q: QSE Energy Settlement Calculations

32 May 2, 2007 Scheduled Generation Actual Generation 0 220MW Resource Imbalance Example 208MW 55MWh52MWh Energy Settlement Calculations

33 May 2, 2007 o Scheduled Load - Adjusted Metered Load o Paid/charged at MCPE o Why an Imbalance? UFE Forecast Inaccuracies Relaxed Balanced Schedule (section 4.3.1) LaaR’s Load Imbalance Protocol Energy Settlement Calculations

34 May 2, 2007 Actual Load Scheduled Load South Zone Load Imbalance Example Energy Settlement 35MWh40MWh

35 May 2, 2007 Questions