0 1 Alternative Options in the Injectors – Preliminary Summary H. Damerau LIU-TM#8 18 October 2013 Many thanks for discussions and input to T. Argyropoulos,

Slides:



Advertisements
Similar presentations
ISS meeting, (1) R. Garoby (for the SPL study group) SPL-based Proton Driver for Facilities SPL-based Proton Driver for Facilities at CERN:
Advertisements

Expected performance in the injectors at 25 ns without and with LINAC4 Giovanni Rumolo, Hannes Bartosik and Adrian Oeftiger Acknowledgements: G. Arduini,
Review of 2011 studies and priorities for 2012 LIU-SPS-BD.
Outcome from 2011 Chamonix workshop New structure of the SPSU Study Group E. Shaposhnikova /02/20111SPSU meeting.
PSB magnetic cycle 160 MeV to 2 GeV with 2.5E13 protons per ring A. Blas 2 GeV magnetic cycle 29/04/ Requirements 1.Present performance: 1E13p from.
H. Damerau, S. Hancock, LHC Beam Studies Review 28/08/2012 PS: the Longitudinal Plane 1 H. Damerau, S. Hancock LIU Beam Studies Review Meeting 28 August.
Summary and outcome of the 1st LIU-HL-LHC brainstorming meeting (24 th June 2011) Mike Lamont This event is jointly organized by the HL-LHC and LIU projects.
Moriond 2003M. Benedikt, S. Hancock Injection and Accumulation in a High Energy Ion Storage Ring Michael Benedikt, Steven Hancock AB Division, CERN.
Injector MD planning and requests for 2014 Giovanni Rumolo and Hannes Bartosik Thanks to all MD users, machine supervisors, operators, experts … MSWG meeting,
First measurements of longitudinal impedance and single-bunch effects in LHC E. Shaposhnikova for BE/RF Thanks: P. Baudrenghien, A. Butterworth, T. Bohl,
Booster Beam Dynamics Christian Carli On behalf of the team working on and contributing to the study: M. Aiba did all ORBIT simulations (Booster modelling.
History and motivation for a high harmonic RF system in LHC E. Shaposhnikova With input from T. Argyropoulos, J.E. Muller and all participants.
Proton Driver: Status and Plans C.R. Prior ASTeC Intense Beams Group, Rutherford Appleton Laboratory.
T. Argyropoulos, LIU /04/2013 Progress in the SPS: RF studies and beam quality T. Argyropoulos, T. Bohl, J. E. Muller,, H. Timko, E. Shaposhnikova.
Collected by E. Jensen, BE-RF 1 ATOP days RF limitations.
HL-LHC/LIU Joint workshop Goal: Progressing towards an agreed set of 450 GeV beam parameters for High Luminosity operation in LHC after LS2 & LS3. Slides.
Update of achievable beam characteristics at injection in LHC H.Bartosik, C.Bracco, O.Brüning, C.Carli, K.Cornelis, H.Damerau, R.Garoby, S.Gilardoni, B.Goddard,
RF issues with (beyond) ultimate LHC beams in the PS in the Lin4 era 0.
Production of bunch doublets for scrubbing of the LHC J. Esteban Muller (simulations), E. Shaposhnikova 3 December 2013 LBOC Thanks to H. Bartosik, T.
Overview of Booster PIP II upgrades and plans C.Y. Tan for Proton Source group PIP II Collaboration Meeting 03 June 2014.
Lessons from SPS studies in 2010 E. Shaposhnikova Chamonix’11 session 09: LHC injectors upgrade.
E.M, PS-OP shut-down lectures, 20/02/ u Requirements of the LHC on its injectors u What are the nominal & already achieved beams at PS exit? u How.
Update on injection studies of LHC beams from Linac4 V. Forte (BE/ABP-HSC) Acknowledgements: J. Abelleira, C. Bracco, E. Benedetto, S. Hancock, M. Kowalska.
Some ideas for/from the SPS LIU-SPS team. Scrubbing (only) for ecloud in SPS? aC coating remains baseline..... –but scrubbing has many potential advantages.
News on TMCI in the SPS: Injecting high intensity bunches Benoit for the MD team: T. Bohl, K. Cornelis, H. Damerau, W. Hofle, E. Metral, G. Rumolo, B.
LINAC4 and the Upgrade of the LHC Injector Complex R. Garoby 26 February, 2013.
SPS proton beam for AWAKE E. Shaposhnikova 13 th AWAKE PEB Meeting With contributions from T. Argyropoulos, T. Bohl, H. Bartosik, S. Cettour.
Damping of Coupled-bunch Oscillations with Sub-harmonic RF Voltage? 1 H. Damerau LIU-PS Working Group Meeting 4 March 2014.
LHC Injectors Upgrade Project 1/12/2010 R. Garoby.
Coupled-bunch oscillation feedback studies 1 H. Damerau LIU-PS Working Group Meeting 20 February 2013 Many thanks to R. Garoby, S. Gilardoni, S. Hancock,
FCC-FHI 28/1/14 Requirements from Collider Draft parameters just available in EDMS:
E. Benedetto, 24/04/14, LIU-PSB Meeting, MDs planning for 2014 MDs planning for 2014 E. Benedetto Thanks: G. Rumolo, B. Mikulec and the RF, OP, ABP, BI.
Momentum slip-stacking of the nominal I-LHC beam in the SPS Particle simulations (preliminary) T. Argyropoulos, E. Shaposhnikova LIU-SPS BD WG 30/01/2014.
LER Workshop, Oct 11, 2006Intensity Increase in the LER – T. Sen1 LHC Accelerator Research Program bnl-fnal-lbnl-slac  Motivation  Slip stacking in the.
Beam loss and radiation in the SPS for higher intensities and injection energy G. Arduini 20 th November 2007 Acknowledgments: E. Shaposhnikova and all.
Pushing the space charge limit in the CERN LHC injectors H. Bartosik for the CERN space charge team with contributions from S. Gilardoni, A. Huschauer,
End-of-year talk LIU-SPS BD WG meeting Our meetings in 2013 O During year - 9 meetings of LIU-SPS BD WG (less than usual 12 in the past :-)
RF measurements during floating MD in Week 40 3 rd of October 2012 LIU-SPS BD WG 25/10/2012 Participants: T. Argyropoulos, H. Bartosik, T. Bohl, J. Esteban.
Progress on e-cloud effects (PS and SPS) G. Iadarola, H.Bartosik, G. Rumolo, M. Taborelli, C. Yin Vallgren Many thanks to: G. Arduini, T. Argyropoulos,
High Intensity Beams in Existing Accelerators for CN2PY: SPS studies, PS issues E. Shaposhnikova Laguna-LBNO General Meeting CERN, Acknowledgments:
Outcome of beam dynamics simulations - Scenarios, requirements and expected gains s LIU-SPS Coordination meeting 26/08/2015 A. Lasheen, E. Shaposhnikova,
Longitudinal aspects on injection and acceleration for HP-PS Antoine LACHAIZE On behalf of the HP-PS design team.
Summary of ions measurements in 2015 and priorities for 2016 studies E. Shaposhnikova 3/02/2016 Based on input from H. Bartosik, T. Bohl, B. Goddard, V.
Longitudinal Limitations of Beams for the LHC in the CERN PS 0.
Update on RF parameters A.Lachaize11 th HPPS design meeting04/09/13.
HP-PS beam acceleration and machine circumference A.LachaizeLAGUNA-LBNO General meeting Paris 18/09/13 On behalf of HP-PS design team.
PS beam dynamics issues in view of LHC beams upgrade: brief status and prospects G. Rumolo (Beam Dynamics for the PSB/PS Upgrade Working Groups), based.
PS2 beam parameters and proposal for aperture strategy M. Benedikt , PS2 meeting1Beams and apertures, M.Benedikt.
LHC Injectors Upgrade Project 11/11/2010 R. Garoby.
Beam Manufacture in PS2 M. Benedikt, S. Hancock. LHC Beams in the PS by 2015 Typeh injε l inj [evs] h ejN bunch ej RF ej [MHz] ε l ej [evs] τ ej [ns]
LIU-PS Beam Dynamics Working Group Introduction and objectives
Harmonic system for LHC
Alternative/complementary Possibilities
Alternative/complementary Possibilities
Plans for ions in the injector complex D
Other Scenarios for a partial Upgrade of the Injector Complex C
Longitudinal beam parameters and stability
Update on the HiLumi/LIU parameters and performance ramp up after LS2
Acknowledgments: LIU-PT members and deputies, H. Bartosik
New AD Production Beam in the PSB
The SPS 800 MHz RF system E. Shaposhnikova for BE/RF
The LHC25ns cycle in the PS Triple splitting after 2nd injection
News on TMCI in the SPS: Injecting high intensity bunches
Beam dynamics requirements after LS2
Generation of Higher Brightness Beams for LHC
Collective effects in the SPS and LHC (longitudinal plane)
SPPC Longitudinal Dynamics
Summary of session 9: "LHC Injectors Upgrade"
JLEIC ion fullsize booster (2256m) space charge limit (Δν=0
Updated MEIC Ion Beam Formation Scheme
Presentation transcript:

0

1 Alternative Options in the Injectors – Preliminary Summary H. Damerau LIU-TM#8 18 October 2013 Many thanks for discussions and input to T. Argyropoulos, M. Benedikt, H. Bartosik, T. Bohl, C. Carli, R. Garoby, S. Gilardoni, B. Goddard, S. Hancock, W. Herr, B. Mikulec, Y. Papaphilippou, G. Rumolo. E. Shaposhnikova, H. Timko, R. Tomas and many others

2 (Alternative) upgrade option overview Linac4 PSB PS SPS Basic choicesAdditional benefit/margin Faster recombination kickers PSB-PS (with 1.4 GeV) Double-batch or h=5 single batch injection 3-split, BCMS, BCS or PBC (pure batch comp.) Mini-microbatch, 8b+4e together with 3-split or BCMS Resonance compensation Special injection optics Long. flat or hollow bunches 2.0 GeV at PSB  PS transfer SPS RF upgrade: 4  3+2  4 More RF power plants: 4  2+4  3 or 10  2 Relaxed  l with 200 MHz in LHC LHC ACN cavities in SPS? Split tunes optics Special injection optics 28 GeV at PS  SPS transfer +5 % +? % +15 % +25 % +? % Vertical painting Linac4 +25 % Long. flat or hollow bunches

3 PS-SPS space charge limit, standard 3-split, 1.4 GeV BCMS BCS 3-split, 2.0 GeV PBC 3-split, 1.4 GeV 3-split, 2.0 GeV BCS BCMS PBC BCSBatch compression + split h = 9  10  20  21 BCMSBatch comp. + merge + split h = 9  10  11  12  13  14  7  21 PBCPure batch compression h = 9  10  …  20  GeV, PS: -  Q y = GeV, PS: -  Q y = 0.31 With PS at 1.4 GeV, pure batch compression reaches brightness as 2 GeV transfer  But ~15% less bunches in LHC and ~twice longer filling, but squeezed to limit (at SPS extraction, number of bun- ches per LHC ring not considered)

4 PS-SPS space charge, alternatives 3-split, 1.4 GeV h5SB 3-split, 2.0 GeV 8b+4e+BCMS 3-split, 1.4 GeV 3-split, 2.0 GeV h5SBSingle-batch h = 5 injection h = 5  10  20  21 8b+4eDouble split + empty bucket h = 7  21 (2b+1e  …  8b+4e) 8b+4e+BCMSBatch comp. + batch comp. h = 9  …  14  GeV, PS: -  Q y = 0.31 h5SP attractive only together with Linac4 and PSB-PS transfer at 1.4 GeV 8b+4e schemes approach or push brightness beyond SPS space charge limit 8b+4e 8b+4e+BCMS 2.0 GeV, PS: -  Q y = 0.31 (at SPS extraction, number of bun- ches per LHC ring not considered)

5 Larger bunch intensity from SPS?  = const, LD+PWD     Baseline upgrade: shorter cavities and 2  1.6 MW RF power N b ≈ 2 · ppb without degradation, 2.5 · ppb for 10% longer bunches  Even shorter cavities and more RF power? E. Shaposhnikova et al., LIU-TM#2 LD: Loss of Landau damp. PWD: Potential well dist. Slope? · · · Additional step of adding 2  1.6 MW: intensity gain ≈ half of first step No gain at low intensity  MWs of RF only heating the cavities  Significant uncertainty in LD+PWD line, sensitive as LD proportional to  l 5/2  Additional emittance constraints on bunch length during acceleration P old = 1.05 MW P new = 1.6 MW RF voltage at transfer to LHC Analysis still in progress

6 8b+4e scheme or 200 MHz in LHC?  = const, LD+PWD V RF for 3 MV at 200 MHz in LHC 8b+4e scheme (SPS ejection): Reduced line density due to less bunches Single bunch effects LD+PWD unchanged LD: Loss of Landau damp. PWD: Potential well dist. 200 MHz in LHC  ~ 2 ·  l ≈ 1.1 eVs No issue with LD or PWD Beam loading and matching with LHC         Analysis still in progress Significant gain from larger longitudinal emittance at transfer to LHC (assumes blow-up in SPS, to avoid bottleneck around start of acceleration) Revisit 200 MHz capture system in the LHC? Install additional 200 MHz standing wave cavities (those for LHC?) in SPS?  = const, LD+PWD

7 Preliminary summary and remarks No magic alternative to Linac GeV + SPS RF upgrade Large number of schemes to increase intensity and brightness from injectors  Linac4+PSB+PS may push SPS to space charge limit Longitudinally larger bunches in SPS would help a lot Limited reach of brute-force approach for even more RF power Interesting alternatives can be studied in injectors after LS1  PSB: Hollow bunches  PS: Flat or hollow bunches, special flat-bottom optics, pure batch compression, 8b+4e schemes, higher PS-SPS transfer energy  SPS: split tunes optics, higher intensity with slightly longer bunches Combinations of alternatives keep flexibility of injector complex to react to requests from LHC Numerous alternatives, e.g., H - injection into the PS, 400 MHz or slip stacking in SPS do not appear as studied in literature

8 8 THANK YOU FOR YOUR ATTENTION!

9 Introduction Evaluation of alternative schemes based on  ‘Common references’ document (  Assumptions presented in LIU-TM#4 ( Parameters for US1/2 with standard schemes now in good agreement with G. Rumolo’s tables ( SPS space charge limit to be revised Analysis for most of the schemes very superficial and simplified Optimization strategy: 1.Fix maximum intensity per bunch at SPS ejection 2.Calculate minimum transverse emittance backwards through the chain  Results: Transverse emittance at extraction from SPS (25 ns by default) and number of bunches per batch

10 Evaluation of injector scenarios Constraints of the injectors taken into account for evaluation: Linac + PSB  Transverse brightness  Maximum longitudinal emittance (PSB-PS transfer) PS  Space charge at flat-bottom  Various longitudinal emittance limits (RF manipulations, transition crossing, final emittance)  Coupled-bunch instability limit (with new feedback) SPS  Space charge at flat-bottom  Maximum intensity per bunch, maximum line density