Revisiting the Adjustor Curves Anchor rates based on literature review – The “anchor rates” were the rates of percent Total Phosphorus removal based on.

Slides:



Advertisements
Similar presentations
creating a sustainable world The Chesapeake Bay TMDL A Policy Model for Nutrient Pollution Reductions James Noonan October.
Advertisements

West Virginia Conservation Agency. Section 319 Non Point Source Program WVCA is the primary entity responsible for the implementation of the: Agriculture.
Pennsylvania Nonpoint Source BMP Effectiveness, Cost-Effectiveness and Potential for Reducing Loads Jeff Sweeney University of Maryland PA Chesapeake Bay.
Frank J. Coale Mark P. Dubin Chesapeake Bay Program Partnerships Agriculture Workgroup BMP Verification Review Panel Meeting Annapolis, Maryland December.
The strength of our commitment to the health of the land and to each other is written in the quality of water we send downstream. Luna Leopold.
To response to litigation, thirty Minnesota Cities were directed to perform antidegradation reviews or Loading Assessments for two time periods: (1) (1)
To response to litigation, thirty Minnesota Cities were directed to perform antidegradation reviews or Loading Assessments for two time periods: (1) (1)
Stormwater Retrofitting Demystified! A training for local governments to cost effectively implement retrofits to meet MS-4 permit and Chesapeake Bay TMDL.
Assessment of Utah’s Nonpoint Source control program Nancy Mesner, Doug Jackson-Smith, Phaedra Budy, David Stevens Lorien Belton, Nira Salant, William.
Project Ranking Results Presented at the 8 th Stakeholder Meeting Hal Bryson, EEP Western Watershed Planner January 12th, 2010.
Christopher Brosch University of Maryland Modeling Subcommittee Meeting January 11, 2012.
Current Planning for 2017 Mid-Point Assessment Gary Shenk COG 10/4/2012 presentation credit to Katherine Antos and the WQGIT ad hoc planning team.
Low Impact Development Overview  Alternative to end of pipe approach to SWM  Maintain hydrologic function of local ecosystem  Treat stormwater close.
Introduction to TMDLs for Nutrients Presented by: Dr. Scott Emery January 15, 2009.
Federal Realty Investment Trust (FRIT) Eastgate Shopping Center Chapel Hill, NC September 9, 2008.
Shingle Creek and West Mississippi Watershed Management Commissions Third Generation Watershed Management Plan CAC Meeting 2 - Implementation.
Mark Dubin Agricultural Technical Coordinator University of Maryland Extension-College Park Modeling Quarterly Review Meeting April 17, 2012.
Point Source POLLUTION: CAUSES AND CONSEQUENCES
Bill Carter Nonpoint Source Program Texas Commission on Environmental Quality Trade Fair and Conference, May 2015.
Jim Edward, Deputy Director Chesapeake Bay Program (EPA) 1 CBP Program Update Citizens Advisory Committee February 27, 2014.
CBP Partnership’s BMP Verification Review Panel’s Findings and Recommendations to Date CBP Scientific and Technical Advisory Committee December 3, 2013.
Forest harvesting practices are a suite of BMPs that minimize the environmental impacts of road building, log removal, site preparation and forest management.
Forestry BMP Review Process Mark Sievers, Tetra Tech Forestry Workgroup (FWG) Conference Call—February 1, 2012.
Loudoun Watershed Watch “ Restoring Loudoun Streams” LCSA Water Forum Presented by: Darrell Schwalm Loudoun Watershed Watch Loudoun Wildlife Conservancy.
Chesapeake Bay Program Partnership’s Basinwide BMP Verification Framework Briefing CBP Partnership’s Communications Workgroup July 10, 2014.
Steve Harrison, Environmental Manager Bureau of Entomology and Pest Control -Mosquito Control Section.
Background and Overview Stormwater NPDES Compliance For New Developments.
New Stormwater Regulations “C.3” Provisions in effect Feb. 15, 2005.
1 “ Understanding the Local Role of Improving Water Quality” Virginia Association of Counties November 14, 2011 Virginia Association of Counties November.
Best Management Practices and the Chesapeake Bay Program Watershed Model Jeff Sweeney University of Maryland Chesapeake Bay Program Office
DC Draft Phase II Watershed Implementation Plan Stakeholder Meeting March 1, 2012 Metropolitan Washington Council Of Governments Hamid Karimi Deputy Director.
Virginia Assessment Scenario Tool VAST Developed by: Interstate Commission on the Potomac River Basin.
The Watershed Treatment Model Chesapeake Bay Science and Technical Advisory Committee (STAC) Annapolis, MD June 7, 2011 Deb Caraco Center for Watershed.
Introduction to MS4 Stormwater Requirements (2009)
1 Chesapeake Bay Program Management Board Meeting March 6, 2012 Discussion for the Final Evaluation of Milestones.
Developing Final Phase II WIPs and Milestones Jim Edward EPA Deputy Director Chesapeake Bay Program Office DDOE Meeting with Federal Partners February.
1 Questions Addressed What are the options for reducing pollutant inputs to Lake Tahoe? Pollutant Reduction Opportunities.
Updating Background Conditions and BMP Efficiencies Jeff Sweeney Environmental Protection Agency Chesapeake Bay Program Office
Created by The North Carolina School of Science and Math.The North Carolina School of Science and Math Copyright North Carolina Department of Public.
Costs and Benefits of Livestock Exclusion Fencing Spencer Duran.
MDOT Storm Water Management Plan Module 2: Best Management Practices
Stormwater Treatment and Flow-Control Requirements in Phase I and Phase II Municipal NPDES Permits Dan Cloak, Principal Dan Cloak Environmental Consulting.
State of Connecticut Department of Transportation Stormwater Management Plan CONNECTICUT DEPARTMENT OF TRANSPORTATION Bureau of Policy and Planning Cynthia.
Florida’s Unified Stormwater Rule Status Lake Okeechobee WRAC November 2007 FDEP, Chad Kennedy Presenting for Eric Livingston and Michael Bateman.
Suzanne Trevena EPA Water Protection Division Chair Milestone Workgroup December 4,
Technologies and Management Options for Reducing Greenhouse Gas Emissions from Landfills CIWMB Board Meeting April 22, 2008 Sacramento, CA.
Stormwater and C.3 Overview Tom Dalziel, Assistant Manager Contra Costa Clean Water Program.
Robert M. Summers, Ph.D. September 16, 2015 How can we make sure the Chesapeake Bay Restoration really works?
Phase II National Storm Water Regulations What’s in it for you?
2004 Tributary Strategies: Assessment of Implementation Options Steve Bieber Water Resources Program Presented at: COG Chesapeake Bay Policy Committee.
Chesapeake Bay Program Partnership’s Basinwide BMP Verification Framework: Building Confidence in Delivering on Pollution Reductions to Local Waters Maryland.
Clifton Bell, P.E., P.G. Chesapeake Bay Modeling Perspectives for the Regulated Community.
Sizing Stormwater Control Facilities to Address Stream-Bank Erosion Control Anthony M. Dubin, PE Brown and Caldwell Anthony M. Dubin,
Non-agricultural regional fertilizer application Tampa Bay Region Model Ordinance Non-agricultural regional fertilizer application Tampa Bay Region Model.
Watershed and water quality assessment of the Allen’s Creek watershed David A. Tomasko, Ph.D. Cheryl Propst, M.S. May 16, 2012.
West Metro Water Alliance A Path to Clean Water – Understanding TMDLs and Watershed Planning September 21, 2011 Diane Spector Wenck Associates, Inc.
Stream Health Outcome Biennial Workplan Neely L. Law, PhD Center for Watershed Protection Chesapeake Bay Program Sediment & Stream Coordinator Habitat.
Adding Wellness to Diet-based Chesapeake Bay Best Management Practices Using Biology to Build Self-replicating Bay Restoration Michael Collins Center for.
JULIE MAWHORTER MID-ATLANTIC URBAN & COMMUNITY FORESTRY COORDINATOR CHESAPEAKE TREE CANOPY STRATEGY & WORKPLAN UPDATE CITIZEN’S ADVISORY.
Program Overview Town of Wrightsville Beach Public Works Department Stormwater Services.
Prevention not Intervention Developing a Sound Response to Erosion and Sediment Control Problems through the Planning Process.
Williamsburg’s Local Strategies to meet the ChesBay TMDL March 2012 Chesapeake Bay Watershed Virginia Maryland Pennsylvania New York Delaware West Virginia.
The road ahead... Maximizing the benefits of maintenance efforts from a regulatory and fiscal perspective.
NPDES Stormwater Rules Phase 1 implemented in 1990 –Large cities (
Improving Local Water Quality in Pennsylvania and Restoring the Chesapeake Bay.
The state belongs to all of us - "Kansas Don't Spoil It"
Test Drive Results and Revisions of the New Stream Restoration Crediting Protocols Bill Stack & Lisa Fraley-McNeal December 2, 2013.
MACo Winter Conference
Chesapeake Bay Program Partnership’s Citizens Advisory Committee
2018 BMP Verification Assessment
Presentation transcript:

Revisiting the Adjustor Curves Anchor rates based on literature review – The “anchor rates” were the rates of percent Total Phosphorus removal based on the runoff treated in inches as was derived from the expert panel literature review. Panel originally opted to use logarithmic trendline to fit the anchor rates Discovered that a 5 th order polynomial was actually a better fit to the anchor rates – Especially for larger amounts of runoff depth captured

So?? Expert Panel report still reflects the log curve Trendline equations in the FAQ document reflect the polynomial curve Several state guidance documents use the curves from the panel report which reflects the “old” curves (log)

Next Steps Recommend USWG makes a decision on which curves to use going forward – Need for consistency in the guidance being distributed Implications: – Logarithmic: changes to the trendline equations in the FAQ document (and some associated training materials) – Polynomial: the expert panel report should be revised to reflect Model currently uses polynomial curves; if changed to log could not be reflected until 2015

Urban BMP Factsheets

Fact Sheet Topics 1.Basics of Ches Bay Pollutant Reduction Plans 2.Stormwater Retrofits 3.Stormwater Practices for New and Redevelopment Projects 4.Stream Restoration 5.Urban Nutrient Management 6.Erosion and Sediment Control 7.Residential BMPs (i.e. homeowner) 8.Septic Systems 9.Urban Filter Strips

Fact Sheet Contents Practice Description Best Places to Implement Them in Your Community How to Find & Rank Candidate Sites General Cost Estimation What Technical Support is Needed Brief Summary of How to Compute Credits Add’l Community Benefits Provided What to Report to State/Local Records to Keep How to Verify Practice in Future State Specific Info and contacts