Architecture Implementation Pilot-5 Disasters Management WG Encourage mature systems to interoperate with the GEOSS Common Infrastructure Leader Hervé.

Slides:



Advertisements
Similar presentations
GEOSS AIP-2 Development Interim Design Review Disaster WG Stu Frye Didier Giacobbo Alexandre Robin (as alternate) Valencia 2 December 2008.
Advertisements

Integrated Risk Management Components in the GEO Architecture Implementation Pilot Phase 2 (AIP-2) ICT for Earth Observation Anwar Vahed.
GEOSS Architecture Implementation Pilot Water Information Services with GEOSS Interoperability Arrangements George Percivall Open Geospatial Consortium.
GEOSS Task IN-05 Architecture Implementation Pilot AIP-5 Point of Contact: George Percivall Open Geospatial Consortium (OGC) March 2012.
GEO Task IN-05 GEOSS Design and Interoperability Steve Browdy, IN-05 C1 Component Lead George Percivall, IN-05 Task Facilitator GEO IIB Prep Meeting January.
Successful Implementations for SBAs using GEOSS Interoperability Arrangements George Percivall The Open Geospatial Consortium Jay Pearlman, IEEE Nadine.
Summary Kick-off meeting AIP-6 (March 28-29, NOAA, Washington DC) Slides provided by Bart De Lathouwer Open Geospatial Consortium AIP Lead
GEOSS Task AR-09-01b Architecture Implementation Pilot Phase 4 (AIP-4) Nadine Alameh, George Percivall, Ingo Simonis Open Geospatial Consortium (OGC) GEOSS.
Future Directions and Initiatives in the Use of Remote Sensing for Water Quality.
GEONETCast Initiative of GEO presented at the EC GEONETCast workshop 5 March 2006 GEO Secretariat.
GEOSS AIP-5 Architecture Implementation Pilot, Phase 5 - Energy Session KO Summary Lionel Ménard - Session Lead - MINES ParisTech Kick-off Meeting May.
Initial Operating Capability Discussion chaired by Jay Pearlman, IEEE including contributions from D. Nebert ADC Co-Chair Meeting February 5, 2008.
GEOSS Architecture Implementation Pilot (AIP-5) Kickoff Workshop Sneha RaoRobert S. ChenSri Vinay SOCIO-ECONOMIC DATA AND APPLICATIONS CENTER (SEDAC),
AIP-5 Agriculture SBA Demo Prof. Liping Di Center for Spatial Information Science and Systems George Mason University
AIP- Chilean Web Services and Capacity Building related to different Societal Benefit Areas GEOSS Architecture Implementation Pilot – Phase 8 – GEOSS Stakeholder.
GEOSS AIP-5 for World Water Online Registry An attempt to Integrate WaterML2 services in GEOSS.
A Global Agriculture Drought Monitoring and Forecasting System (GADMFS) Meixia Deng and Liping Di.
Global Earth Observation System of Systems (GEOSS) Architecture Implementation Pilot (AIP) Air Quality and Health Working Group Stefan Falke, Rudy Husar,
GEOSS Task AR-09-01b Architecture Implementation Pilot Nadine Alameh, Ph.D. Open Geospatial Consortium (OGC) GEOSS Interoperability.
Capacity Building – GEOSS- AIP5 STATUS & PLANS Prepared by Lucia Lovison-Golob Contribution by Luciano Parodi, Pablo Duenas, Stuart Frye.
© GEO Secretariat GEO WP & 2013 GEO priorities for CEOS Support GEO Secretariat CEOS SIT-28 NASA - Langley March 2013.
GEOSS AIP-5 Architecture Implementation Pilot, Phase 5 Disasters Preparedness & Mitigation Session Hervé Caumont - Session Lead - OGC IP Team AIP-5 Kick-off.
Delivering Innovative Solutions to the World © Compusult – All rights reserved Compusult’s Participation in GEOSS Contributions and Operations Robert Thomas.
GEO Task IN-05 Architecture Implementation Pilot, Phase 5 Kick-Off Agriculture SBA Session Summary UNEP Geneva 3-4 May 2012.
Vision and architecture of GEOSS Information System GEOSS Design and Evolution George Percivall The Open Geospatial Consortium (OGC) GEO Task IN-05 coordinator.
GEOSS Task AR-09-01b Architecture Implementation Pilot Phase 6 (AIP-6) Bart De Lathouwer Open Geospatial Consortium (OGC) GEO-X Plenary, Geneva, Switzerland.
Historical Disaster Data Grid for Natural Disaster Events Prof. Guoqing Li CEODE/CAS March 30, 2009, Newport Beach, USA Presented to 4th China-US Roundtable.
Task IN-05 GEO Work Plan Symposium 2014 IIB AIP-7 (May 1 st ) Reporting: Bart De Lathouwer (OGC)
GEOSS Architecture Implementation Pilot AIP February 2011 GeoViQua First Workshop George Percivall Open Geospatial Consortium Task Lead AR-09-01B - AIP.
AIP-5 Disaster Management WG. Disaster Response ETA4Satellite (Estimated Time for Arrival 4 Satellite) Satellite Sensor Tasking Changing Detection Analysis.
AIP-2 Kickoff Workshop End-to-end use case: Discovery, access, and use with variations Doug Nebert GEOSS AIP-2 Kickoff September 2008.
GEOSS Architecture Implementation Pilot, Phase 3 - AIP-3 Initial Concepts - Hervé Caumont George Percivall Open Geospatial Consortium GEO Task AR-09-01b.
GEOSS AIP-5 Architecture Implementation Pilot, Phase 5 - Disasters Management Session- Hervé Caumont - Session Lead - OGC IP Team AIP-5 Kick-off Meeting,
Architecture Implementation Pilot-5 Disasters Management WG Encourage mature systems to interoperate with the GEOSS Common Infrastructure Hervé Caumont,
AIP-7 Results to the IIB Feb. Architecture Implementation Pilot What is the Architecture Implementation Pilot (AIP) –Pilots future components.
GEO Architecture and Data Committee Task AR Architecture Implementation Pilot George Percivall September 2008.
WGISS Technology Subgroup Report WGISS-29 Bonn, 2010 Nataliia Kussul WGISS.
NSAU Flood Model Use in Sensor Web: Lessons Learned Sergii Skakun Space Research Institute NASU-NSAU, Ukraine CEOS WGISS-27 May 11-15, 2009 Toulouse, France.
Architecture Implementation Pilot-5 Disasters Management WG Encourage mature systems to interoperate with the GEOSS Common Infrastructure Hervé Caumont,
® GEOSS AIP 5 Water SBA Update HDWG June 2012 Matt Austin NOAA Stefan Fuest KISTERS Jochen Schmidt NIWA.
J. Eric Madsen International Relations Specialist National Oceanic and Atmospheric Administration (NOAA) July, 2006 Global Earth Observation System of.
Architecture Implementation Pilot – Capacity Building GEO XII, November 10, 2015 Date and time: Nov 9 at 09:00AM Lucia Lovison-Golob, PhD GEOSS-AIP CB.
Report of the Architecture and Data Committee (ADC) R.Shibasaki (ADC, Japan)
© 2005, Open Geospatial Consortium, Inc. CrisisGrid: Critical Infrastructure and Informatics for Emergency Response 4 May 2005 Mark Reichardt President.
Architecture Implementation Pilot Phase 7 Bart de Lathouwer, AIP lead November 2014.
Implementing GEOSS architecture with-and-for Users George Percivall Open Geospatial Consortium Task lead AR-09-01B.
GEOSS Common Infrastructure Access to Priority Earth Observations Data “ Sprint to Plenary” Group on Earth Observations Eighth Plenary Session - GEO-VIII.
AIP-5 Kickoff Workshop Session Introductions 3 May 2012.
Strengthening Disaster Management using Earth Observations – GEOSS and CEOS Activities – George Percivall, Nadine Alameh; OGC John Evans, GST Karen Moe,
GEOSS Task AR-09-01b Architecture Implementation Pilot AIP Phase 4, (AIP-4) Ingo Simonis Open Geospatial Consortium (OGC) ADC 17, Salzburg September 2011.
Observation Integration across Disciplines in the GEOSS Architecture Implementation Pilot George Percivall and Bart de Lathouwer The Open Geospatial Consortium.
GEOSS Architecture Implementation Pilot AIP-3 Engineering Use Cases Nadine Alameh & Josh Lieberman AIP-3 kickoff Frascati, Italy March
Breakout session 11.7 Sustainable Urban Development Outputs Wenbo Chu GEO Secretariat.
OGC’s role in GEO: Results from the Architectural Implementation Pilot (AIP) George Percivall Open Geospatial Consortium GEO Task IN-05 Coordinator
AIP-3 Kickoff Workshop Summary Health SBA: Air Quality and Infectious Diseases Kick-off Session Leads: Stefan Falke, François MARQUES GEOSS AIP-3 Kickoff.
ESA-FAO GEOPortal STATUS & PLANS
Global Science & Technology, Inc. (GST) Greenbelt, Maryland
AIP-5 Kick-off Workshop Summary 3-4 May 2012, UNEP, Geneva
George Percivall, Open Geospatial Consortium
George Percivall Open Geospatial Consortium
GEO Task IN-05 Architecture Implementation Pilot, Phase 5 AIP-5 Kickoff Workshop UNEP Geneva 3-4 May 2012.
GEO Architecture Implementation Pilot
GEOSS Future Products Workshop Session 5 Introduction & Agenda
GEOSS Architecture Implementation Pilot, Phase 2 (AIP-2)
George Percivall September 2008
Session 7: Wrap-up and Planning
AIP-5 Kick-off Workshop Summary 3-4 May 2012, UNEP, Geneva
GEOSS Architecture Implementation Pilot, Phase 3 AIP-3 Initial Plans – Drought Scenario - presentation to ESIP - George Percivall, Open Geospatial Consortium.
GEOSS Future Products Workshop March 26-28, 2013 NOAA
4/5 May 2009 The Palazzo dei Congressi di Stresa Stresa, Italy
Presentation transcript:

Architecture Implementation Pilot-5 Disasters Management WG Encourage mature systems to interoperate with the GEOSS Common Infrastructure Leader Hervé Caumont, OGC Presenter 衷嵐焜 Lan-Kun(Peter) Chung, GIS.FCU, Taiwan

Responses to AIP-5 Call for Participation Aquatic Informatics CAAS and Tsinghua CIESIN Compusult CSISS – GMU CUAHSI EO2HEAVEN GeoViQua GEOWOW Hydrology GEOWOW Architecture GIS-FCU IEEE INCOSE MINES ParisTech/ ENDORSE NASA NASRDA NIWA NOAA PML PYXIS TUD-GLUES UNEP Live Univ of Tokyo Responses to AIP-5 CFP are posted CFP remains openposted

Architecture Implementation Pilot and DM AIP-1:GEOSS Common Infrastructure (GCI) prototype –Applied to DM: oil spill, volcano, hurricane AIP-2:Disaster Management Scenario –Scenario and Use Case driven development –Applied to flooding; Recast to other disasters AIP-3:Near- real-time dispatching during response –Component architecture confirmed AIP-4:DM based on EC BRISEIDE project AIP-5:Coordination with CEOS on DM “Fostering interoperability arrangements and common practices for GEOSS”

AIP-5 DM scenario Participants support Global- and regional-scale data related to disasters and vulnerabilities –Urbanization and human settlements parameters –Contributions to the GEOSS Data-CORE Services structured to encourage full participation of end-users –Countries / regions that need to be involved in the generation of their own disaster management resources Services for near real-time processing of satellite acquisitions, like near real-time satellite tasking –Deliver more dynamic disaster related product generation workflows and more responsive collaboration. –Select events for Demo capture and acquire imagery (thru AIP-5: EO-1, Radarsat, Formosat, GeoEye…)

ETA4Satellite Client (Estimated Time for Arrival 4 Satellite)

Adopting OGC standard to task Satellites OGC Sensor Planning Service for Earth Observations Extension Taiwan Thailand Formosat II THEOS

Disaster Response ETA4Satellite (Estimated Time for Arrival 4 Satellite) Satellite Sensor Tasking Changing Detection Analysis Satellite Image Acquisition (Image Publisher) User Reference res req res req res req res req res On-site User ( Mobile Apps) req res Near real time Image(GeoSMS) Evaluate availabele Satellite Satellite tasking One Stop(OGC EO SPS)

AIP-5 kick-off, Geneva 3-4 May Disaster Response_ Support Volunteer/Rescue Team Near real time post disaster images 8 1 Satellite Image Acquisition(Image Publisher) OGC OpenGeoSMS 2

Disaster response_ Changing Detection Analysis Port-au-Prince, Haiti 06/19/2009 ( FORMOSAT-2 image ) Port-au-Prince, Haiti 01/15/2010 ( FORMOSAT-2 image ) Acknowledge National Space Organization Before After Haiti earthquake (magnitude 7.0 Mw ) Port au Prince Haiti, 01/12/2010

Disaster response_ Changing Detection Analysis Acknowledge National Space Organization Sendai, Japan 03/11/2011 ( FORMOSAT-2 image ) Before Japan Earthquake/Tsunami 03/11/2011 Sendai, Fukushima Sendai, Japan 03/12/2011 ( FORMOSAT-2 image ) After Sendai, Japan 02/28/2012 ( FORMOSAT-2 image ) Sendai, Japan 03/15/2012 ( FORMOSAT-2 image ) Sendai, Japan 03/16/2012 ( FORMOSAT-2 image ) Sendai, Japan 10/16/2012 ( FORMOSAT-2 image )

Monitoring environmental recovery of damaged area in Tohoku, Japan from space &ground Kohei Cho / Tokai University, Japan

AIP-5 kick-off, Geneva 3-4 May Wakabayashi, Sendai, Japan observed by FORMOSAT-2 March, 11, 2011March, 19, 2011

March, 11, 2011 March 19, 2011 October 16, 2012 Yuriage Area, Natori, Miyagi, Japan observed by FORMOSAT-2 October 15, 2012 View direction Still no houses

Fujitsuka, Sendai, Miyagi, Japan observed by FORMOSAT-2 March, 11, 2011March 19, 2011 October 16, 2012 October 15, 2012 Vegetations are coming back

Disaster response_ Changing Detection Analysis San Marcos, Guatemala (from Google earth) San Marcos, Guatemala 11/09/2012 ( FORMOSAT-2 image ) Acknowledge National Space Organization Before After Guatemala earthquake 11/08/2012 (M: M7.3)

AIP-5 kick-off, Geneva 3-4 May Conclusions To cross the nations boundaries for satellites tasking can enhance the efficiency for disaster management –Ex :Taiwan and Thailand has created an alliance Cooperate with other societies(like Project Matsu 媽祖, OSDC)

Contacts Hervé Caumont, AIP-5 DM WG lead (OGC) 衷嵐焜 Lan-Kun(Peter) Chung(GIS.FCU,Taiwan ) George Percival, IN-05-C1 task lead (OGC)