Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Dept. Of Energy 1 An Overview.

Slides:



Advertisements
Similar presentations
Journées Instrumentation du GDR Nucléon 8-9 Avril 2008, CEA Saclay Polarized Positrons at the Jefferson Laboratory (i) Physics motivations (ii) Principe.
Advertisements

Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Dept. Of Energy 1 Spin Dance.
Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Dept. Of Energy 1 Spin Dance.
Measuring the Neutron and 3 He Spin Structure at Low Q 2 Vincent Sulkosky College of William and Mary, Williamsburg VA Experimental Overview The.
Measuring the Neutron and 3 He Spin Structure at Low Q 2 Vincent Sulkosky for the JLab Hall A Collaboration College of William and Mary, Williamsburg VA.
The Spin Structure of 3 He and the Neutron at Low Q 2 : A Measurement of the Extended GDH Integral Vincent Sulkosky (for the JLab Hall A Collaboration)
5 MeV Mott Measurement for CEBAF Operations group Joe Grames, Marcy Stutzman February 14 th, 2007 Sir Nevill F. Mott at the ceremony with his Nobel Prize.
Compton polarimetry for EIC Jefferson Lab Compton Polarimeters.
1 Electron Beam Polarimetry for EIC/eRHIC W. Lorenzon (Michigan) Introduction Polarimetry at HERA Lessons learned from HERA Polarimetry at EIC.
Electron Polarimetry at JLab Dave Gaskell Jefferson Lab Workshop on Precision Electron Beam Polarimetry for the Electron Ion Collider August University.
DESY PRC May 10, Beyond the One Photon Approximation in Lepton Scattering: A Definitive Experiment at DESY for J. Arrington (Argonne) D. Hasell,
K. Moffeit 6 Jan 2005 WORKSHOP Machine-Detector Interface at the International Linear Collider SLAC January 6-8, 2005 Polarimetry at the ILC Design issues.
Precision Test of Mott Polarimetry in the MeV Energy Range P.A. Adderley 1, T. Gay 2, J. Grames 1, J. Hansknecht 1, C. Horowitz 3, M.J. McHugh 4, A.K.
PN12 Workshop JLab, Nov 2004 R. Michaels Jefferson Lab Parity Violating Neutron Densities Z of Weak Interaction : Clean Probe Couples Mainly to Neutrons.
Proton polarization measurements in π° photo-production --On behalf of the Jefferson Lab Hall C GEp-III and GEp-2γ collaboration Wei Luo Lanzhou University.
AESOP: Accurate Electron Spin Optical Polarimeter Marcy L. Stutzman, Matt Poelker; Jefferson Lab Timothy J. Gay; University of Nebraska.
The PEPPo e - & e + polarization measurements E. Fanchini On behalf of the PEPPo collaboration POSIPOL 2012 Zeuthen 4-6 September E. Fanchini -Posipol.
Proton polarization measurements in π° photo- production --on behalf of the Jefferson Lab Hall C GEp-III and GEp-2 γ collaboration 2010 Annual Fall Meeting.
New Methods for Precision M ø ller Polarimetry Dave Mack Jefferson Lab ( for Dave Gaskell ) May 20, 2006 PAVI06 Precision M ø ller polarimetry Beam kicker.
Beijing, Feb 3 rd, 2007 LEPOL 1 Low Energy Positron Polarimetry for the ILC Sabine Riemann (DESY) On behalf of the LEPOL Collaboration.
Polarimetry of Proton Beams at RHIC A.Bazilevsky Summer Students Lectures June 17, 2010.
A study of systematic uncertainties of Compton e-detector at JLab, Hall C and its cross calibration against Moller polarimeter APS April Meeting 2014 Amrendra.
Polarimetry at the LC Source Which type of polarimetry, at which energies for LC ? Sabine Riemann (DESY), LEPOL Group International Workshop on Linear.
Hadron physics Hadron physics Challenges and Achievements Mikhail Bashkanov University of Edinburgh UK Nuclear Physics Summer School I.
Compton polarimetry for EIC Jefferson Lab Compton Polarimeters.
Precision Measurement of R L and R T of Quasi-Elastic Electron Scattering In the Momentum Transfer Range 0.55GeV/c≤|q|≤1.0GeV/c* Yan Xinhu Department of.
Measurement of double- polarized asymmetries in quasi- elastic processes 3 He(e,e’d) and 3 He(e,e’p) Miha Mihovilovič For the E Collaboration.
Summary of EIC Electron Polarimetry Workshop August 23-24, 2007 hosted by the University of Michigan (Ann Arbor) Wolfgang.
May 17, 2006Sebastian Baunack, PAVI06 The Parity Violation A4 Experiment at forward and backward angles Strange Form Factors The Mainz A4 Experiment Result.
1 Overview of Polarimetry Outline of Talk Polarized Physics Machine-Detector Interface Issues Upstream Polarimeter Downstream Polarimeter Ken Moffeit,
Oct. 6, Summary of the Polarisation Session J. Clarke, G. Moortgat-Pick, S. Riemann 10 November 2006, ECFA Workshop, Valencia.
Latifa Elouadrhiri Jefferson Lab Hall B 12 GeV Upgrade Drift Chamber Review Jefferson Lab March 6- 8, 2007 CLAS12 Drift Chambers Simulation and Event Reconstruction.
CEBAF The Continuous Electron Beam Accelerating Facility (CEBAF) at JLab in Newport News, Virginia, is used to study the properties of quark matter. CEBAF.
Summary of Workshop on Precision Electron Beam Polarimetry Newport News June 9-10, 2003 workshop summary by Dave Gaskell, Jefferson Lab Richard Jones,
Lecture 9: Inelastic Scattering and Excited States 2/10/2003 Inelastic scattering refers to the process in which energy is transferred to the target,
Proton Charge Form Factor Measurement E. Cisbani INFN Rome – Sanità Group and Italian National Institute of Health 113/Oct/2011E. Cisbani / Proton FF.
SLAC, September 25, 2009 Searching for a U -boson with a positron beam Bogdan Wojtsekhowski Thomas Jefferson National Accelerator Facility  The light.
Fiducial Cuts for the CLAS E5 Data Set K. Greenholt (G.P. Gilfoyle) Department of Physics University of Richmond, Virginia Goal: To generate electron fiducial.
Measuring the Spin Structure of 3 He and the Neutron at Low Q 2 Timothy Holmstrom College of William and Mary For the Jefferson Lab Hall A Collaboration.
A. Zelenski a, G. Atoian a *, A. Bogdanov b, D.Raparia a, M.Runtso b, D. Steski a, V. Zajic a a Brookhaven National Laboratory, Upton, NY, 11973, USA b.
Polarized Positrons at the Jefferson Laboratory Idaho State University, Idaho Accelerator Center, Jefferson Lab, LPC Clermont-Ferrand, LPSC Grenoble, Old.
Polarized Positrons at the Jefferson Laboratory Idaho State University, Idaho Accelerator Center, Jefferson Lab, LPC Clermont-Ferrand, LPSC Grenoble, Old.
GEp-III in Hall C Andrew Puckett, MIT On behalf of the Jefferson Lab Hall C GEp-III Collaboration April 15, 2008.
Compton polarimetry for EIC. Outline Polarized electron beam Compton process Compton polarimeters at Jefferson Laboratory – Parity experiments at Jlab.
Nilanga Liyanage University of Virginia For Jefferson Lab Hall A, CLAS and RSS Collaborations.
Workshop on Precision Electron Beam Polarimetry for the Electron Ion Collider, University of Michigan, Aug 23-24, 2007 An EIC-like Polarized Electron Injector:
Moller Polarimeter Q-weak: First direct measurement of the weak charge of the proton Nuruzzaman (
Run Time, Mott-Schwinger, Systematics, Run plan David Bowman NPDGamma Collaboration Meeting 10/15/2010.
Analysis of d(e,e’p)n in BLAST Aaron Maschinot Massachusetts Institute of Technology Spin 2004 Conference Trieste, Italy.
Mott Electron Polarization Results Riad Suleiman July 10, 2013.
Operated by Jefferson Science Associates, LLC for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Polarized Electron Beams.
Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Depart. Of Energy The Department.
Thomas Jefferson National Accelerator Facility Precision Electron Beam Polarimetry Workshop - June , Jefferson Laboratory Accelerator Tools.
Overview of recent photon beam runs at CLAS CLAS12 European Workshop, Feb , Genoa, Italy Ken Livingston, University of Glasgow Tagged photons.
LCWS Paris – April 19-23, 2004 Polarimeter Issues K. Peter Schüler Polarimeter Issues 1 Polarimeter Studies for TESLA O General Considerations O.
Status of Polarimeters and Polarized Targets: what are the plans for development of polarized targets to meet the needs of the Day 1 and future experimental.
A compact pair polarimeter and spectrometer
Mott Polarimeter at CEBAF
Polarized Electrons for Polarized Positrons
A.P. Potylitsyn, I.S. Tropin Tomsk Polytechnic University,
A Precision Measurement of GEp/GMp with BLAST
Kellogg Radiation Lab, Caltech Pasadena, CA
Overview of Electron Polarimetry
CEBAF Injector Overview
University of Michigan
5 MeV Mott Measurement for CEBAF Operations group
Accelerator Issues Raised in Hall A Parity Collaboration Meeting, April B-Team Meeting April 29, 2009.
Polarized Positrons at Jefferson Lab
A Precision Measurement of GEp/GMp with BLAST
COMPTON SCATTERING IN FORWARD DIRECTION
Presentation transcript:

Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Dept. Of Energy 1 An Overview of Electron Polarimeters and Results of an Intercomparison Joe Grames PST2001 International Workshop on Polarized Sources and Targets Nashville, Indiana, USA September 30 - October 4, 2001

Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Dept. Of Energy 2 …and an Intercomparison Spin Dance 2000 experiment Comparison of 5 JLab electron polarimeter High precision spin-based energy measurements Electron polarimeters… Purpose and desirable parameters Meaning of analyzing power And how it can be difficult to measure Unique Jefferson Lab capability Overview Low & high energy Mott polarimeters Compton polarimeter Three Moller polarimeters

Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Dept. Of Energy 3 Jefferson Lab - E. Chudakov, H. Fenker, A. Freyberger, J. Grames, J. Hansknecht, J. Mitchell, M. Poelker, C. Sinclair, M. Steigerwald, M. Tiefenback CEA Saclay, DSM/DAPNIA/SPHN - C. Cavata, S. Escoffier, F. Marie, T. Pussieux, P. Vernin Florida International University - R. Nasseripour, B. Raue Karkov Institute - V. Gorbenko Massachusetts Institute of Technology - D. Higinbotham, R. Suleiman North Carolina Ag. and Tech. State University - S. Danagoulian Old Dominion University - V. Dharmawardane University of Virginia - R. Fatemi, K. Joo, M. Zeier Universitaet Bonn - T. Reichelt Vrije Universiteit - B. Zihlmann Jefferson Lab Polarimeter Collaboration

Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Dept. Of Energy 4 Electron Beam Polarimetry Electron polarimetry is the technique of separating scattered particles for detection using some physical interaction between the polarization of the beam under test (P b ) and the total analyzing power of the polarimeter’s target (A tot ). The target is itself polarized in many polarimeters and A tot is then proportional to the product of the target polarization and the analyzing power of the interaction (cross- section). The experimental asymmetry is defined as  = A tot · P b. This asymmetry can be measured by either reversing the polarity of the beam or target and while detecting the scattered particles from each state, e.g., measuring N + events with electron polarization +P b and then N - events with electron polarization -P b  = A tot · P b = N + + N - N + - N -

Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Dept. Of Energy 5 Consider the Jlab 5 MeV Mott polarimeter (electrons scattered from a 1  m gold foil). An Example P b ~ 70% A tot ~ -0.4

Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Dept. Of Energy 6 What purpose does electron beam polarimetry serve? keV - MeV region for sources and nuclear parity experiments GeV and greater for parity and nucleon spin structure experiments Future experiments are pushing toward ~1% absolute polarimetry Eager users! What are desirable (necessary) features? Large analyzing power Designs with reduced sensitivity to inherent systematics Non-invasive method does not disrupt experiment High luminosity to rapidly achieve small statistical uncertainty N =·P b 2 ·P t 2 ·A 2 PbPb PbPb 2

Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Dept. Of Energy 7 Polarimeter analyzing power: A tot Precise knowledge of the analyzing power is limited. A tot is not a directly measured quantity: measurement requires difficult double-scattering experiments the analyzing power is determined by theory and simulation Factors that effect knowledge of the total analyzing power inferred target polarization detector acceptance multiple scattering

Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Dept. Of Energy 8 Mott Scattering Spin-orbit coupling of the beam electron and the target nucleus. Operational Points Unpolarized, high-Z, solid targets (Au, Pb) Useful in the keV to MeV energy range 14 MeV on Pb (MAMI, 1994) 5 MeV on Au (JLAB, 1995) Sherman function is large (~ 30-50%) Invasive Multiple/plural scattering in thick targets  =    1+ S(  ) P b · k  k´ | k  k´| Sherman function Jlab 5 MeV Mott polarimeter Sherman Phys.Rev. 103(6) 1956, p1601-7

Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Dept. Of Energy 9 Target thickness effects Dilution by multiple/plural scattering Sherman function sets scale Target thickness extrapolation necessary ~MeV double scattering important Uncertainty of Sherman function coulomb screening at lower energy Ross et.al Phys.Rev A 38(12) 1988, p finite nuclear size at higher energy Ugincius et. al Nucl.Phys. A , p % effect at 5 MeV 20% effect at 14 MeV Uncertainties of Mott A tot (-) A tot

Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Dept. Of Energy 10 Moller Scattering QED spin-spin interaction of a polarized beam electron and a polarized target electron. Operational Points Nucleon probe energies (GeV range) Large asymmetry A zz = -7/9 P t ~ 8%  A tot ~6% Good luminosity (~ kHz /  A /  m) COM coincidence for >1000:1 S:B Invasive Limited to <5  A by target heating Jlab Hall C Moller

Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Dept. Of Energy 11 Uncertainties in A ij Particle identification Finite energy acceptance (A zz vs. E) Mott background (single vs. double arm) Moliere scattering Levchuk effect (~10%) atomic electron motion of core shells p t ~ 10 keV  2 = 2m e 1 p´ 1 E p t · n meme 1 Jlab Hall B Moller

Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Dept. Of Energy 12 Target Polarization Effects Conventional Moller iron-alloy (Fe, Co, V) in-plane magnetization (tilted, B ~ 100 G) absolute calibration in beam environment thickness inhomogeneity lead to uncertainty between magnetization and flux Novel Moller Design (I. Sick, et. al) spin-polarization versus magnetization known for pure iron ~ 0.25% out-of-plane (normal targets) insensitive to target thickness high field saturation (~4 Tesla) field direction and uniformity target heating split SC coils (4 Tesla) pure Fe Jlab Hall B Moller Jlab Hall C Moller

Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Dept. Of Energy 13 Compton Scattering Asymmetric cross-section between longitudinally polarized electron beam and circularly polarized photon beam. A C =   -     +   Operationally Must work for high luminosity Non-invasive! Easy reversal of target polarization A tot (Energy) Performance suffers at ~1GeV

Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Dept. Of Energy 14 JLab Compton Polarimeter Target (laser) polarization P  >99% excellent Fabry-Perot cavity Gain ~ 5  10 3  1-2 kW Chicane delivers backscattered photon and electron  c ~ 20 mrad Increased complexity

Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Dept. Of Energy 15 Calculation of A tot Compton edge energy calibration Low energy threshold resolution Model to describe   and   Background Bremsstrahlung (residual gas) Synchrotron radiation (magnets) Uncertainties of Compton A tot E b =3.2 GeV

Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Dept. Of Energy 16 Polarized Source & Beam The polarized electron beam is produced by photoemission from a strained GaAs crystal held at a potential of -100 kV. The degree of polarization depends upon the properties of the crystal and the wavelength and degree of polarization of the incident laser light. The magnitude of the electron polarization is determined by the average number of electrons with a spin along a defined direction. That defined direction is determined by the circular laser polarization (momentum). P == 80%   GaAs

Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Dept. Of Energy 17 The Role of Spin Precession in Testing Spin precession is dominantly contributed to by the dipole magnetic fields in proportion to the beam’s energy and bend angle. A Wien filter is a suitable spin rotator for a 100 keV electron beam; an electric field rotates the spin, while a crossed magnetic field balances the Lorentz force. The net rotation is called the Wien angle (  Wien ).  spin =  ··  bend 2 ( g-2 ) x z

Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Dept. Of Energy 18 Where does “spin dance” come from? The measured experimental asymmetry is proportional to the component of the total beam polarization along some analyzing component of a polarimeter. P meas sin(  Wien +  ) By varying the Wien angle the measurable component of the beam polarization will vary sinusoidally.

Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Dept. Of Energy 19 Source Strained GaAs photocathode (  = 850 nm, P b >75 %) Accelerator 5.7 GeV, 5 pass recirculation The Experiment

Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Dept. Of Energy 20 Spin Dance 2000 Results P meas sin(  Wien +  )

Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Dept. Of Energy 21 Uncertainties are based on statistics and do not include any systematics. Polarimeters of 3 types (Mott, Moller, Compton) indicate agreement. Uncertainty in Wien angle induces < 0.2% relative effect. Relative Analyzing Powers Compared P meas normalized to Mott for reference

Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Dept. Of Energy 22 Spin Based Energy Measurements Why measure the beam energy by spin precession? Precise (~10 -4 ) alternative methods exist and are quick (1-2 hours) magnetic spectrometer elastic electron-proton scattering Polarimetry + cursory measurements for a spin dance take 2-3 days The answer is: carefully done yields relative energy at ~10 -5, certainly independent calibration and the information is free

Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Dept. Of Energy 23 Method 1: precession between injector and end-stations large phase advance (  ~ 10,000 degrees)  to relative uncertainty requires knowledge of injector energy, linac gradients, and all bend angles Method 2: precession between end-stations at final beam energy small phase advance (  ~ 500 degrees)  ~10 -3 relative uncertainty requires knowledge of end-station bend angles Two methods with different precision E = 2mec22mec2 g e - 2 ·  

Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Dept. Of Energy 24 Energy Results Summarized +35 MeV -35 MeV

Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Dept. Of Energy 25 Hall B 35 MeV shift?  = -2.9° or  = -0.22°

Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Dept. Of Energy 26 State of electron beam polarimetry Mott recent progress for MeV polarimetery and target thickness model Moller inclusion of corrective effects, e.g., Levchuk effect saturated foil targets Compton high gain cavities providing compatibility at lower current Disagreement amongst polarimeters greater than quoted systematics. Agreement of independent polarimeters (Mott, Moller, Compton). Often, the polarimeter is simply viewed as the tool. To reach the 1% absolute mark the polarimeter must be the experiment, not the tool. Conclusions

Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Dept. Of Energy 27 Part of a letter by L.H. Thomas to Goudsmit (25 March 1926). Reproduced from a transparency shown by Goudsmit during his 1971 lecture. The original is presumably in the Goudsmit archive kept by the AIP Center for History of Physics. One last remark...