CMS ECAL DAQ Fiber data block format Magnus Hansen 20020226.

Slides:



Advertisements
Similar presentations
Special SC readout Dears Dave, Philippe and Irakli, I was told by Reyes that end of June there will be a meeting to finalize the trigger.
Advertisements

1 Calorimeter Trigger to L1-Board data transmission Umberto Marconi INFN Bologna.
12-18 September 2005Gueorgui ANTCHEV 1 A data readout module for the TOTEM experiment Anelli G. 1, Antchev G. 1, 2, Aspell P. 1, Chalmet P. 3, Da Silva.
DSP online algorithms for the ATLAS TileCal Read Out Drivers Cristobal Cuenca Almenar IFIC (University of Valencia-CSIC)
Ionization Profile Monitor Project Current Status of IPM Buffer Board Project 10 February 2006 Rick Kwarciany.
Phase 2 pixel electronics 21 May 2015 – CERN, Geneva First look at data compression Konstantin Androsov – INFN Pisa & University of Siena Massimo Minuti.
Synchronous - Asynchronous Data Transmission. Asynchronous ► The sender and receiver are not Synchronised. ► The sender sends only one character at a.
FF-LYNX R. Castaldi, G. Magazzù, P. G. Verdini INFN – Sezione di Pisa G. Bianchi, L. Fanucci, S. Saponara, C. Tongiani Dipartimento di Ingegneria della.
CS 640: Introduction to Computer Networks Aditya Akella Lecture 5 - Encoding and Data Link Basics.
Second generation Front-end chip for H-Cal SiPM readout : SPIROC DESY Hamburg – le 13 février 2007 M. Bouchel, F. Dulucq, J. Fleury, C. de La Taille, G.
Prototype Test of SPring-8 FADC Module Da-Shung Su Wen-Chen Chang 02/07/2002.
The offline raw data format (version 3) Header Data of one FADC Tail A data set of one FADC. i.e. data of one FADC 32 bits = 1 word 2 words 1536 words.
M. Lo Vetere 1,2, S. Minutoli 1, E. Robutti 1 1 I.N.F.N Genova, via Dodecaneso, GENOVA (Italy); 2 University of GENOVA (Italy) The TOTEM T1.
The GBT A single link for Timing, Trigger, Slow Control and DAQ in experiments A. Marchioro CERN/PH-MIC.
ATLAS Read Out Driver Aloisio, Capasso, Della Pietra, della Volpe, Izzo.
Frontend of PHENIX Si pixel K. Tanida (RIKEN) FEM/DAQ meeting for PHENIX upgrade (10/24/02) Outline Overview of PHENIX Si pixel detector ALICE1 chip readout.
September 8-14, th Workshop on Electronics for LHC1 Channel Control ASIC for the CMS Hadron Calorimeter Front End Readout Module Ray Yarema, Alan.
1 Online Calibration of Calorimeter Mrinmoy Bhattacharjee SUNY, Stony Brook Thanks to: D. Schamberger, L. Groer, U. Bassler, B. Olivier, M. Thioye Institutions:
The L0 Calorimeter Trigger U. Marconi On behalf of the Bologna Group CSN1, Catania 16/9/02.
Features of the new Alibava firmware: 1. Universal for laboratory use (readout of stand-alone detector via USB interface) and for the telescope readout.
FPGA firmware of DC5 FEE. Outline List of issue Data loss issue Command error issue (DCM to FEM) Command lost issue (PC with USB connection to GANDALF)
COMADC Board and Etc. Jinyuan Wu For CKM Collaboration.
T2K Data Acquisition System Matt Thorpe STFC Rutherford Appleton Laboratory 17 th IEEE Real-Time Conference 2010, Lisbon, Portugal.
LHCb front-end electronics and its interface to the DAQ.
Sept. 7, 2004Silicon VTX Workshop - Brookhaven National Laboratory, Long Island, New York Prototype Design of the Front End Module (FEM) for the Silicon.
1Ben ConstanceFONT Meeting 1st August 2008 ATF2 digital feedback board 9 channel board with replaceable daughter board (RS232 etc.) − Board will log data.
Using Banner Vision Products with OCS Controllers Ken Jannotta Jr. Horner APG August 2007.
Offline raw data format of SVD2.0 The offline raw data format of SVD2.0 is almost same as that of SVD1.0 which was developed by Krakow people. The big.
B. Hall 17 Aug 2000BTeV Front End Readout & LinksPage 1 BTeV Front End Readout & Links.
26/11/02CROP meeting-Nicolas Dumont Dayot 1 CROP (Crate Read Out Processor)  Specifications.  Topology.  Error detection-correction.  Treatment (ECAL/HCAL.
A Super-TFC for a Super-LHCb (II) 1. S-TFC on xTCA – Mapping TFC on Marseille hardware 2. ECS+TFC relay in FE Interface 3. Protocol and commands for FE/BE.
Ervin DÉNES Collab Meeting, 23 – Emulating TOTEM Front-End Driver for trackerDAQ sw.
ARCHITECTURE. PRR November x 32 PADs Up to 26 or 3 x 17 MANU BOARD. PATCH BUS Translator Board. FEE DETECTOR Up to 100 PATCH BUS per detector. MANU.
30/09/2003Nigel Smale University of Oxford1 Development of an Optical Front-end Readout System for the LHCb RICH HPD Detectors. N.Smale, M.Adinolfi, J.Bibby,
Current Knowledge on CKM Front-end Electronics M. Bowden, K. Bowie, M. Campbell, P. Cooper, S. Hansen, B. Haynes, A.Inyakin, M. Kozlovsky, K. Nelson,
FELIX Design FELIX Design Upgrades of detector readout meeting 9 June 2014 Lorne Levinson, for the FELIX group Upgrades of detector readout meeting, 9.
Figure 2-6: Internal Organization of Protocol Entity (Sending End) Figure 4-14: Internal Organization of Protocol Entity (Sending End) MAP Packet Service.
Packet Service Packet Extraction VC Access Service VC_FSH Service VC Frame Service MC_Insert Service MC Frame Service MC_OCF Service Virtual Channel Reception.
M. Adinolfi – University of Oxford – MAPMT Workshop – Imperial College 27 June Status of the PINT chip M. Adinolfi University of Oxford.
SKIROC status CERN – CALICE/EUDET electronic & DAQ meeting – 22/03/2007 Presented by Julien Fleury.
Readout controller Block Diagram S. Hansen - CD-1 Lehman Review1 VXO Ø Det Links to 24 SiPM Front End Boards Clock Event Data USB ARM uC A D Rd Wrt 100Mbit.
June 2004 Craig Ogilvie 1 Strip Pilot  Communication link between ladder and counting house  Three optical fibers –Send serialized data –Receive control.
Within ATLAS both TILECal and LAr are planning upgrades to the readout systems - current systems will reach limits on radiation exposure aging of components.
Samuel Silverstein, SYSF ATLAS calorimeter trigger upgrade work Overview Upgrade to PreProcessor MCM Topological trigger.
Super BigBite DAQ & Trigger Jens-Ole Hansen Hall A Collaboration Meeting 16 December 2009.
1 L0Calo ECS. 2 Introduction L0Calo consists in several boards: –In the cavern: Front-End Boards, Trigger Validation Boards and SPD Multiplicity Boards.
SVD FADC Status Markus Friedl (HEPHY Vienna) Wetzlar SVD-PXD Meeting, 5 February 2013.
SKIROC status Calice meeting – Kobe – 10/05/2007.
Samuel Silverstein, Stockholm University For the ATLAS TDAQ collaboration The Digital Algorithm Processors for the ATLAS Level-1 Calorimeter Trigger.
CALICE ECAL meeting VFE ASIC Next & next to next version 17 Janvier 2006, LAL Orsay.
Configuration and local monitoring
ATLAS calorimeter and topological trigger upgrades for Phase 1
Mapping area of the 36 PMT 9 PMT 9 PMT 9 PMT 9 PMT.
PRAD DAQ System Overview
Figure 2-6: Internal Organization of Protocol Entity (Sending End)
Readout System of the CMS Pixel Detector
Bonn Test Station data analysis with PandaRoot
CRU Weekly Meeting Discussion on Trigger
Implementation of the Jet Algorithm ATLAS Level-1 Calorimeter Trigger
LHCb calorimeter main features
NA61 - Single Computer DAQ !
User Datagram Protocol (UDP)
The Data Link Layer Chapter
SKIROC status CERN – CALICE/EUDET electronic & DAQ meeting – 22/03/2007 Presented by Julien Fleury.
New DCM, FEMDCM DCM jobs DCM upgrade path
Overview of the new CMS ECAL electronics
BUCKEYE has internal shift register which controls calibration
Idle Setup Run Startup Process Wait Event Event Wait Answer Send
Data Concentrator Card and Test System for the CMS ECAL Readout
Presentation transcript:

CMS ECAL DAQ Fiber data block format Magnus Hansen

Magnus Hansen, CERN-EP/CME Protocol Considerations l CMS ECAL FrontEnd is sending one Trigger Tower on one 800Mb optical link to the counting room l CIMT protocol is proposed s as opposed to 8/10 è 8/10 more “standard” s CIMT considered to be more robust s GOL used as serialiser s Agilent Technologies G-Link 1034 used as de-serialiser l Some link data format needed

Magnus Hansen, CERN-EP/CME Features l CIMT protocol s Proprietary protocol è Agilent è IEEE standard... s Data word è 16 data bits è Flag bit s Control word è 14 data bits s Idle word è Fill frames l 8-10 protocol s Standard protocol s Data word è 8 data bits è 16 bits sent as two consecutive words s Idle word è Fill frames è Commas etc.

Magnus Hansen, CERN-EP/CME CIMT Data link format word definition l Local BCID s Control word “01” è 12 bits l Local EVID s Control word “10” è 12 bits øGlobal triggers øLaser triggers øMonitoring triggers l Channel ID s Control word “00” è 3 bit channel (1-5) è 3 bit strip (1-5) è 7 bits tower (1-68) è parity? l Sample s Data word è 12 bit ADC data è 2 bit FPPA gain è 1 bit monitoring flag è 1 bit forced gain flag è Parity (flag bit) l Checksum s Control word “11” è Vertical XOR è Other l Idle word s Fill frame

Magnus Hansen, CERN-EP/CME CIMT DAQ link data block format l CIMT protocol l One tower event s BCID s EVID s 1 tower sum s 25 channels è 1 channel header è 10 samples / channel s Checksum l N.o. clock cycles s 4 + (10 + 1) * 25 = 279 cp è us

Magnus Hansen, CERN-EP/CME 8-10 Data link format word definition l Idle word s Fill frame l Local BCID s Control word “01” è 12 bits BCID è 2 bits “01” è Forced gain flag l Local EVID s Control word “10” è 12 bits EVID øGlobal triggers øLaser triggers øMonitoring triggers è 2 bits “10” è Forced gain bit l Channel ID s Control word “00” è 3 bit channel (1-5) è 3 bit strip (1-5) è 7 bits tower (1-68) è parity? l Sample s Data word è 12 bit ADC data è 2 bit FPPA gain è 1 bit monitoring flag l Checksum s Control word “11” è Vertical XOR è Other

Magnus Hansen, CERN-EP/CME DAQ link data block format l 8-10 protocol l One tower event s BCID s EVID s 1 tower sum s 25 channels è 1 channel header è 10 samples / channel s Checksum l N.o. clock cycles s 4 + (10 + 1) * 25 = 279 cp è us l No Parity