Signalized Intersection Performance Measurement Vendor Perspectives Regarding INDOT/Purdue/Vendor Collaborative Project Eric Raamot Vice President, Engineering.

Slides:



Advertisements
Similar presentations
Whats New In Dream Report 4.5 Renee Sikes Applications Engineer Dream Report Brand Manager.
Advertisements

Space Missions Can Your Library Automation Software Do This? David Hook MDA
To Enhance Your Webinar Experience Teleconference info:Teleconference info: Call-in: (888) Call-in: (888) Passcode: #Passcode: #
T3 Webinar September 2012 Performance Measures Edward J. Smaglik September 18 th, 2012.
© 2012 Autodesk BIM Collaboration Siva Koppula Technical Consultant.
Identifying Split Failures Due to Over Saturation (Demand> Capacity) Ed Smaglik, Darcy Bullock, Jim Sturdevant & Tom Urbanik.
Case Study 2 New York State Route 146 Corridor. This case study is about a Traffic Impact Assessment for a proposed site development in Clifton Park,
Transit Signal Priority Applications New Technologies, New Opportunities Peter Koonce, PE APTA BRT Conference – Seattle, WA Wednesday, May 5, 2009 Technology.
ACS-Lite Offset Tuning Algorithm. Collect data from advance detectors on coordinated approaches Develop a Statistical Flow Profile correlated to the phase.
ACS-Lite Split Tuning Algorithm. Collect data Correlate data to signal phasing Perform analysis Implement phase split adjustments.
Peek – ACS Lite Deployment Quixote Traffic Corporation Peter Ragsdale August 17, 2006.
U.S. Department of Transportation Federal Highway Administration ACS-Lite FHWA Adaptive Signal Control Systems Raj S. Ghaman, P.E. Team Leader, Office.
Fedwire ® Securities Service Modernization Bank Depository User Group Annual Meeting September 24, 2013.
Scott Evans VP of Engineering Eberle Design Inc
Experience Implementing PORTAL: Portland Transportation Archive Listing Andrew M. Byrd Andy Delcambre Steve Hansen Portland State University TransNow 2.
Lec 24, Ch.19: Actuated signals and detectors (Objectives) Learn terminology related to actuated signals Understand why and where actuated signals are.
PASSER II SOFTWARE.
Customized Simulation Modeling Using PARAMICS Application Programming Interface Henry Liu, Lianyu Chu & Will Recker.
Alarms and Events - Processing and Logging Project Mentors Suneel Kumar Venugopal Vanga.
Signalized Intersections
Introducing Dream Report Win Worrall Applications and Development Engineer.
Peter Koonce TRB Annual Meeting January 9, 2005 Best Practices for Signal Operations Best Practices for Signal Operations – Lessons Learned from the Portland.
2015 Traffic Signals 101 Topic 7 Field Operations.
Signalized Intersection Delay Monitoring for Signal Retiming SafeTrip-21 Safe and Efficient Travel through Innovation and Partnership in the 21 st Century.
RT-TRACS A daptive Control Algorithms VFC-OPAC Farhad Pooran PB Farradyne Inc. TRB A3A18 Mid-Year Meeting and Adaptive Control Workshop July 12-14, 1998.
Applied Transportation Analysis ITS Application SCATS.
Congestion Management Innovations in Oregon Christopher Monsere Assistant Professor Portland State University Civil and Environmental Engineering Director,
Limited Distribution Release Open Information Interoperability Tool Suite Dr. Len Seligman, Dr. Ken Smith, Catherine Macheret, Chris Wolf
L/O/G/O Metadata Business Intelligence Erwin Moeyaert.
Oregon Microsimulation Roundtable March 2012
Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject.
Trade Software Developer Technical Seminar Document Imaging System March 7, 2012.
Fourteenth Lecture Hour 9:30 – 10:20 am, Sunday, September 16 Software Management Disciplines Project Control and Process Automation (from Part III, Chapter.
GTFS: Not just for trip planning The role of open data standards in transit planning and transit operations.
1 A Google-Map-Based Arterial Traffic Information (GATI) System Authors: Yao-Jan Wu Dr. Yinhai Wang Dr. Dalin Qian Date: 10/03/2007.
© 2008 Ocean Data Systems Ltd - Do not reproduce without permission - exakom.com creation Dream Report O CEAN D ATA S YSTEMS O CEAN D ATA S YSTEMS The.
Coordination Matt Wiesenfeld Darcy Bullock Purdue University.
TRAFFIC SIGNAL OPTIMIZATION: A Coordinated Effort Tom Dancey, P.E. Signal System Engineer City of Springfield CITY OF SPRINGFIELD & MISSOURI DEPARTMENT.
5 - 1 Copyright © 2006, The McGraw-Hill Companies, Inc. All rights reserved.
Building Data and Document-Driven Decision Support Systems How do managers access and use large databases of historical and external facts?
1 Adaptive Control Software – Lite (ACS-Lite) Eddie Curtis, P.E. FHWA Resource Center / HOTM NTOC Webcast March 27, 2008.
Software In The Loop Applications for VISSIM TRB Traffic Signal Systems Committee – Simulation Subcommittee Kiel Ova, P.E., PTOE.
© 2006, National Research Council Canada © 2006, IBM Corporation Solving performance issues in OTS-based systems Erik Putrycz Software Engineering Group.
SCATS 6.10 Release Review SMUG, March 2013 Sydney.
Communications Management
Smart Information for a Sustainable World True Adaptive Signal Control A Comparison of Alternatives Technical Paper # Presentation to the 18 th World.
Foundations of Information Systems in Business. System ® System  A system is an interrelated set of business procedures used within one business unit.
Integrated Corridor Management Initiative ITS JPO Lead: Mike Freitas Technical Lead: John Harding, Office of Transportation Management.
Leveraging Existing Traffic Signal Infrastructure to Produce Performance Measures for System Optimization and Construction Acceptance.
Library Online Resource Analysis (LORA) System Introduction Electronic information resources and databases have become an essential part of library collections.
Mission Street Project Update Voyage 2070 Advance Operation Systems Using ASTRO Proactive Plan Selection Average and Split Variant operations Prepared.
Implementation Review1 Archive Ingest Redesign March 14, 2003.
Presented by Gary Duncan Traffic Signal Performance Measures.
1 Signalized Intersection Performance Measures West Lafayette, Indiana for SR 43 (River Road)
Mission Street Voyage Advanced Features Test Facility Mission street is a major arterial corridor that was re-timed 10 years prior to our project. Our.
CONTROL EQUIPMENT AND FUNCTIONS Part 1 General Concepts.
Demographic Full Count Review Presentation to the FSCPE March 26, 2001 Washington D.C.
Mission Street Project Update Voyage 2070 Advance Operation Systems Using ASTRO Proactive Plan Selection Average and Split Variant operations Prepared.
EMPOWERMENT THROUGH EDUCATION Business Retention and Expansion Task Force Workshop Joe Lucente Assistant Professor and Extension Educator OSU Extension.
Mission Street Project Update Voyage 2070 Advance Operation Systems Using ASTRO Proactive Plan Selection Average and Split Variant operations Prepared.
Thinking Inside the Box
Improving Intersection Performance
ACE Presentation for Industry
The search engine of shipments
GREEN WAVE TRAFFIC OPTIMIZATION
Transportation Systems Management and Operations (TSM&O)
* Topic 7 Field Operations
School of Civil Engineering
ITAS Risk Reporting Integration to an ERP
Presentation transcript:

Signalized Intersection Performance Measurement Vendor Perspectives Regarding INDOT/Purdue/Vendor Collaborative Project Eric Raamot Vice President, Engineering Econolite Presented by: Gary Duncan Sr. Vice President and Chief Technology Officer Econolite

Discussion Points Brief summary of historic intersection performance measurement Overview of the successful Academic/DOT/Industry collaboration used to research enhancements on performance measurement Outline of Product enhancements derived from research

Historical Challenges Typical field data collection has been limited to: –Volume –Occupancy –Average speed –Data averaged over relatively large aggregation periods Typically minutes Controllers have provided some basic MOE logging: –Phase split duration –Reason for termination (Max/Gap/Force Off) –Pedestrian actuation –Transition begin/end –Preemption begin/end

Example of Current MOE’s

Historical Challenges Gap exists between collection of “data” and generation of “information” Translation from data into information has typically been left up to the traffic engineer. Limitations within controllers based upon size of controller memory and low-bandwidth communications infrastructure have limited data collection in the past. Current technology opens the door for more extensive logging as well a conversion of data points into useful traffic engineering information.

Agency Resources Many agencies do not have the resources to retime all intersections every 1-3 years. Little system-level information exists to identify intersections operating with outdated or problem timing. Challenge is to use capabilities of today’s controllers and systems to create tools that reveal opportunities for performance improvement.

INDOT /Purdue Instrumented Intersections (2003) Econolite ASC/3 Data Logger (2006) Research Chronology …

ASC/3 Data Logger 100msec time-stamping of all relevant controller events. Event data stored as binary-formatted files, hourly on controller. Controller storage allows for > 24 hours of raw data. Data uploaded via scheduled FTP and uncompressed into SQL database. Byte # N Byte # N+1Byte #’s N+2,N+3 Event Type AssignmentTimeStamp. 0 = Begin Phase Off(1-16) Phase #1-16Deciseconds past hour ( ) 1 = Begin Phase Green(1-16) Phase #1-16Deciseconds past hour ( ) 2 = Begin Phase Yellow(1-16) Phase #1-16Deciseconds past hour ( ) 3 = Begin Phase Red Clear(1-16) Phase #1-16Deciseconds past hour ( ) 4 = Begin Ped Off(1-16) Phase #1-16Deciseconds past hour ( ) 5 = Begin Ped Walk (1-16) Phase #1-16Deciseconds past hour ( ) 6 = Begin Ped Clear(1-16) Phase #1-16Deciseconds past hour ( ) 7 = Reserved (Ped State)(1-16) Phase #1-16Deciseconds past hour ( ) 8 = Detector Transition Off(1-64) Detector #1-64Deciseconds past hour ( ) 9 = Detector Transition On(1-64) Detector #1-64Deciseconds past hour ( ) 10 = Detector RFU(1-64) Detector #1-64Deciseconds past hour ( ) 11 = Detector RFU(1-64) Detector #1-64Deciseconds past hour ( ) 12 = Begin Overlap Off(1-16) Overlap #A-PDeciseconds past hour ( ) 13 = Begin Overlap Green(1-16) Overlap #A-PDeciseconds past hour ( ) 14 = Begin Ovl Grn Extension(1-16) Overlap #A-PDeciseconds past hour ( ) 15 = Begin Overlap Yellow(1-16) Overlap #A-PDeciseconds past hour ( ) 16 = Begin Overlap Red Clr(1-16) Overlap #A-PDeciseconds past hour ( ) 20 = Begin Preemptor(1-10) Preemption #1-10Deciseconds past hour ( ) 21 = End Preemptor(1-10) Preemption #1-10Deciseconds past hour ( ) 24 = Phase Hold Applied(1-16) Phase #1-16Deciseconds past hour ( ) 25 = Phase Hold Released(1-16) Phase #1-16Deciseconds past hour ( ) 26 = Ped Call on Phase(1-16) Phase #1-16Deciseconds past hour ( ) 27 = Ped Call Cleared(1-16) Phase #1-16Deciseconds past hour ( ) = Phase Control RFU(1-16) Phase #1-16Deciseconds past hour ( ) 32 = Phase Min Complete(1-16) Phase #1-16Deciseconds past hour ( ) 33 = Phase Term Gap Out(1-16) Phase #1-16Deciseconds past hour ( ) 34 = Phase Term Max Out(1-16) Phase #1-16Deciseconds past hour ( ) 35 = Phase Term Force Off(1-16) Phase #1-16Deciseconds past hour ( ) = Phase State RFU(1-16) Phase #1-16Deciseconds past hour ( ) 40 = Coord Pattern Change (0-253,Free,Flash) Deciseconds past hour ( ) 41 = Cycle Length Change (0-255,seconds) Deciseconds past hour ( ) 42 = Offset Length Change (0-255,seconds) Deciseconds past hour ( ) = Split (1-16) Change (0-255) Split Value Deciseconds past hour ( ) = Coord Data RFU (0-255) Deciseconds past hour ( )

Elkhart County (local agency) West Lafayette (Pedestrians) McCordsville (Railroad pmt) Noblesville (Corridor Performance Measures) Research Opportunities

Research Direction Research intent is to define a set of signalized intersection operating parameters that may reveal inefficiencies in cycle, offset and/or split timing. Identification of inefficiencies will help agencies focus retiming efforts on those intersections with the most observed need. INDOT and Industry intent to is to generalize these parameters such that commercialized systems can provide traffic engineers with a common toolset. Project focus upon measurement and reporting of performance data. Control level changes at intersection not addressed within the scope of project.

4 Int. Indianapolis Arterial Indianapolis RR Preempt West Lafayette Ped Int. 2 Int. in Elkhart County ~ 160 mil. Events in SQL DB

24 Flow Rates by phase/by cycle P1P2P3P4 P6P5P7P :0024:0012:00 0:0024:0012:000:0024:0012:000:0024:0012: Time of Day Equivalent Hourly Flow Rate (veh/h)

P1P2P3P4 P6P5P7P :0024:0012:00 0:0024:0012:000:0024:0012:000:0024:0012: Time of Day Volume-to-Capacity Ratio V/C Ratios by Phase, 24 Hours

Interim Accomplishments Expansion and consistency of traffic controller raw data logging format. –Presented as CSV format at system level, controller encoding remains proprietary. –PEEK and Econolite have currently provided this CSV interface. –Interim format used by partner vendors for research interoperability. Development of recommendations for performance based data aggregation and metric logging within controller. –NTCIP 1202 object definitions are an anticipated output from this effort. –Reuse of ACS-Lite status objects as log file being considered.

Research Toolset Econolite has supported research through integration of research tools into Centracs system:

INDOT /Purdue Instrumented Intersections (2003) Evolution of Research to Product ~2009 Automated SQL Ingestion and Purdue Parameterized Excel Sheets

Product Enhancements Difference between what has been developed as research tools for the various corridor studies to date with a generally applicable toolset that can be used daily by the practicing traffic engineer. Econolite has started software development in both Centracs and the ASC/3 controller to generalize the results of the research to date into core product enhancements.

“Productization” Requirements: Aggregation of raw controller events into a cycle-cycle logging of arrival distributions using ACS Lite data objects. –Aggregation reduces data storage/bandwidth requirements to allow broad deployment. Periodic upload of arrival distribution log into Centracs SQL database. –Supports query of current datasets and historic trends across filterable displays and reports. Centracs generation of graphical tools that present this data as information in a manner usable by traffic engineers to make retiming decisions. –Enhanced PCD, Split analysis (V/C), Plan Performance graphs.

Concluding Observations This research has been a successful collaboration of academia, agency, and vendors to standardize conceptual performance measures that assess the need for COS timing adjustments. Vendors are taking results and enhancing controller and system software to support the performance measurements and informational displays developed. Collaborative project efforts expected to continue for at least an additional year with definition of further performance measures. Vendors carry forward the goal for systems to automatically determine the degradation of performance and suggest remedial action to traffic engineers.

Contact Information: Gary Duncan Eric Raamot Reference: Smaglik E.J., A. Sharma, D.M. Bullock, J.R. Sturdevant, and G. Duncan, “Event-Based Data Collection for Generating Actuated Controller Performance Measures," Transportation Research Record, #2035, TRB, National Research Council, Washington, DC, pp , Brennan, T.M., C.M. Day, J.R. Sturdevant, E. Raamot, and D.M. Bullock, “Railroad Preempted Intersection Track Clearance Performance Measures,” Transportation Research Board Paper ID: , in press.

Elkhart County (local agency) West Lafayette (Pedestrians) McCordsville (Railroad pmt) Noblesville (Corridor Performance Measures) Research Opportunities