INTEGRATED SUSTAINABLE DEVELOPMENT THROUGH COLLABORATION Infrastructure Summit Polokwane 5 October 2010 Presented by Pierre Lourens Contact number: MINING
Content 1.Introduction to the Producers Forums 2.Implementation of sustainable integrated infrastructure projects at scale 3.Methodology 4.The Future 5.Way Forward
Introduction to the Producers Forums Steelpoort Valley Producers Forum Mogalakwena Economic Sector Forum Olifants River Joint Water Forum
Members of Limpopo Producers Forums Anglo Operations LimitedPan Palladium South Africa (Pty) Ltd Akanani Mining (Pty) LimitedPlateau Resources (Pty) Limited ASA Metals (Pty) LimitedPlatreef Resources (Pty) Limited Assmang Limited (Dwarsrivier Mine) Rustenburg Platinum Mines (Pty) Limited (Eastern Limb Development) Barplats Mines Limited (Rhodium Reefs)Samancor Chrome Limited Boynton Investments (Pty) LimitedTwo Rivers Platinum (Pty) Limited Bokoni Platinum MineTwickenham Platinum Mine Chromex Mining (Pty) LimitedVeremo Holdings Limited Corridor Mining Resources (Pty) Limited Western Platinum Limited (On behalf of Messina Platinum Mines Limited) Eastern Platinum LimitedXstrata South Africa (Pty) Limited Impala Platinum Limited (Marula)Umnotho weSizwe Investment Holdings (Pty) Modikwa Platinum Mine Joint VentureSishen Iron Ore Company (Pty) Ltd MTC MineralsSmokey Hills Platinum Northam Platinum Limited
Integrated Approach Integrated Project Development
Methodology Methodology Technical Training JTTT Local Level
Impact: MIG Achievements
The future The Future
What Now Way Forward