Beam Line Layout – Cooling Section There seems to be two options for energy measurement: at the 180 dipole and/or in a diagnostic branch at the end of.

Slides:



Advertisements
Similar presentations
PEPPo Weekly Status Meeting February 16, 2011 & 6MSD Planning Meeting February 23, 2011 Part 1 – Technical summary of layout Part 2 – Month-by-Month Installation.
Advertisements

FAC, 10/12/06 D. Schultz 1 e-Beams Systems Update Linac Injector Undulator Production MMF commissioning ARR David Schultz.
Low Energy RHIC e - Cooling LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity 704 MHz SRF gun converted to booster cavity 5-cell 704 MHz.
1 Low-energy RHIC electron Cooler (LEReC) Update November 17, 2014.
Minutes from Sector 1 Relocation Meeting, May 22 nd 9:15 LCR D. Gassner K Mernick suggest moving the BBQ kicker and triple purpose pick-up assemblies to.
Crab Cavities in IR1 and IR5 Some considerations on tunnel integration What will be the situation in the tunnel after the LHC IR Phase-1 Upgrade. What.
Scientific Goals: V. Litvinenko’s RHIC retreat talk Commissioning Goals: I. Pinayev presentation last week Run 14 Goals: Complete assembly of 112 MHz SCRF.
1 Presented at ColUSM by D. Ramos on behalf of the Cold Collimator Feasibility Study Working Group Longitudinal.
Low Energy RHIC e - Cooling Meeting Notes 1 –LF Solenoids & HF (Matching) Solenoids: Out for bid??? –20 o Dipole  Magnet gap is 4 inches/transport lines.
1 BROOKHAVEN SCIENCE ASSOCIATES Vacuum Systems H.C. Hseuh, Vacuum Group Leader 8 th ASAC Meeting for NSLS-II Project May 10-11, 2011.
Discussion on the magnetic shielding: The magnetic shielding will not be installed until the 2016 shutdown. The magnetic shielding test fixture will be.
Sector 1 Instrument Relocation for LEReC Systems in the LEReC Region (39m - 64m) to be Relocated 7 separate assembliesNew LocationChampionsApproved ARTUS.
1 Low-energy RHIC electron Cooler (LEReC) cost estimate December 2, 2014.
1 LEReC Funded! From: Fedotov, Alexei Sent: Thursday, May 14, :04 PM Subject: LEReC project approved Dear All, FYI. The LEReC project is now formally.
Thomas Jefferson National Accelerator Facility Page 1 23 rd Annual HUGS Program June 2-20, 2008 CEBAF Overview HUGS08 June 3 CEBAF Overview HUGS08 June.
Low Energy RHIC e - Cooling Meeting Minutes – 1/14/15 1 –Magnet Design  During DOE Review there was concern for magnet field quality of LF Solenoids.
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
Low Energy RHIC e - Cooling LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity 704 MHz SRF gun converted to booster cavity 5-cell 704 MHz.
1 Booster Corrector BPM Status AD/ Instrumentation Jim Fitzgerald.
G5 Beam Instrumentation D. Gassner, E. Pozdeyev 4-09.
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
Low Energy RHIC e - Cooling Meeting Minutes – 11/19/14 1. Cooling Section Magnets and Power Supplies –Most of power supplies will be from ERL (R. Lambiase).
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
1. Beam Line Layout – Cooling Section (CS) Mu Metal shield design – G. Mahler is assembling a mock-up of beam line for field measurements to evaluate.
The Stripping Foil Test Stand in the Linac4 Transfer Line
Low Energy RHIC e - Cooling Meeting Minutes – 11/5/14 1.J. Tuozzolo will schedule a visit to NSLS next week to evaluate available magnets, power supplies,
Vacuum, H-C. Hseuh January 4, 2007 RHIC II Project Internal Cost Review Vacuum Systems H.-C. Hseuh January 4, 2007 Vacuum Systems.
Experience Fabricating the Storage Ring Vacuum Chambers for NSLSII
UK Neutrino Factory Meeting Front End Test Stand (F.E.T.S.) Engineering Status by P. Savage 22nd April 2009.
SBS Magnet and Infrastructure Status Robin Wines July 2015.
Low Energy RHIC e - Cooling Meeting Minutes – 11/5/14 1.Funding is available to purchase magnets. 2.Comment during presentation of attached slides: 180.
Low Energy RHIC e - Cooling LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity 704 MHz SRF gun converted to booster cavity 5-cell 704 MHz.
Low Energy RHIC e - Cooling 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity.
Overall Layout 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity.
Low Energy RHIC e - Cooling LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity 704 MHz SRF gun converted to booster cavity 5-cell 704 MHz.
A Fedotov, K Hamdi, D Kayran, L Snydstrup, K Smith, J Tuozzolo, A Zaltsman Transport Beam Line Design development of beam line will be from the Booster.
Low Energy RHIC e - Cooling Meeting Minutes – 12/23/ Cooling Section: –LF Solenoids:  At PPM, G. Woods has assigned buyer, SOW will be revised,
July LEReC Review July 2014 Low Energy RHIC electron Cooling Jorg Kewisch, Dmitri Kayran Electron Beam Transport and System specifications.
LEReC. COOLING in Blue RHIC ring COOLING in Yellow RHIC ring 63.9 m to IP2 Beam Dump 20° Bending Magnets DC e - Gun 704 SRF Booster Cavity 2.1 GHz Cu.
Vacuum, H-C. Hseuh January 4, 2007 RHIC II Project Internal Cost Review H.-C. Hseuh Vacuum Systems January 4, 2007 Project Overview.
Overall Layout 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity Booster Cavity and Gun move (next slide)
Update: Puck and Gun Magnet March 1, Magnetized Gun 2 K 2 CsSb Preparation Chamber HV Chamber.
Design Update Puck and Gun Magnet February 16, 2016.
Magnetized Beam LDRD: Design Tasks February 19, 2016.
Beam Line Layout – Cooling Section (to be installed by 1 Dec ember 2015) J. Kewisch wants to move the 20 dipole, yellow (to the right) toward the triplet.
LHC Beampipes Ray Veness / AT-VAC FP XII 08Beam Vacuum- R.Veness.
Meeting Minutes: LEReC DC Gun, Transport Lines, and Dump Installation 2016, May 26, 2016 D. Kayran, A. Fedotov, T. Miller, D. Gassner, D. Weiss, G. Mahler,
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
LEReC. COOLING in Blue RHIC ring COOLING in Yellow RHIC ring 63.9 m to IP2 Beam Dump 20° Bending Magnets DC e - Gun 704 SRF Booster Cavity 2.1 GHz Cu.
LEReC Electron beam requirement for cooling Kinetic energy, MeV 1.6
LEReC System 1. Project Schedule 2015 shutdown COMPETE! Move beam line equipment from IP 01:00 Install cooling section beam line 2016 shutdown Install.
PAL-XFEL Commissioning Plan ver. 1.1, August 2015 PAL-XFEL Beam Dynamics Group.
Low Energy RHIC e - Cooling Meeting Minutes – 12/17/ For the matching energy of electron and ion beams methods for electron energy measurement were.
Minutes meeting Mapes, Miller, Kayran, Fedotov, Gassner, Hamdi, Bruno, Mahler, Weiss, Hammons, Arno, Nayak, Fite, Bellavia The layout shown in.
LEReC System 1. LEReC Injection section 2016 CeC Beam Dump 45°dipole (CeC) Profile Monitor (ERL HE) No SRF Cavity DC e - Gun ERL Solenoid ERL Halo Monitors.
Report Technical Director Storage-Ring-Installation Completed
Raja Ramanna Centre for Advanced Technology, Indore
Page Headline CBETA Splitter.
Arc magnet designs Attilio Milanese 13 Oct. 2016
EBTF Design Review Technical Meeting Group
SCU Next Phase Meeting July 8, 2014.
Electron Source Configuration
LARP Rotatable Collimators for LHC Phase II Collimation
Additional Upstream Coil Shielding
Advanced Research Electron Accelerator Laboratory
A. Freyberg Aug 2016 ECT’16 =>
CEPC Collider Magnets CHEN, Fusan November 13, 2018.
Electron Collider Ring Magnets Preliminary Summary
IR Beam Transport Status
Isotope Readiness Review Run Plans
Presentation transcript:

Beam Line Layout – Cooling Section There seems to be two options for energy measurement: at the 180 dipole and/or in a diagnostic branch at the end of the electron inlet line at first 20 dipole bend. The 20 dipole at electron ‘merge in’ location will be moved toward the triplet. HF Solenoid near the 20 dipole will also be moved in same direction. Bid for standard CS bellows (qty-26): Order placed. Bid for sliding bellows at 180 dipole: Order placed. Beam Line Layout – Merging Cooling Section Possible diagnostic line to be adde d, including 20 dipole, BPM and PM. Instrumentation The BPM’s mounted at the 180 dipole chamber flanges will be converted to ‘hybrid’ BPM’s, a combination of a BPM and a PM or Slit. The vertical buttons on the Blue BPM will be removed and replaced with PM. The vertical buttons on the Yellow BPM will be removed and replaced with Energy Slit. A PM chamber will be placed upstream of the hybrid BPM/Slit and the HF Solenoid will be moved further away from 180 magnet. Installing both PM and Slit in the BPM is not possible for a RF compatible design. Small BPM will also be added to Yellow beam line on the other side of the 180 dipole chamber (beyond Cooling Section) and 1.5m (60.85”) away, but before bellows. The 180 dipole chamber has to be extended to create 1.5 m distance. The 1.5m corresponds to the BPM to BPM distance around the U-turn. Magnets 180 Dipole Magnet: Drawings are to be modified to correct quadrupole multipole with shims on pole faces (W.Meng, G. Mahler). Note: Per A. Fedotov the multipole content required is 2e-4 quadrupole and 3e-3 hextapole. 180 Dipole Chamber: No bidders. K. Hamdi to design a chamber with mitered tube. (Possibility of aluminum chamber, copper plated). Chamber for 20 Dipole Magnet: Drawings are ready. RF Cavities Warm RF Cavity Design Review on 15 June. (Plan to place order for 2.1MHz by August.) Minutes of LEReC Cooling & Merging Sections Meeting 11 June

Overall Layout 2 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity Move BPM close to 180 magnet combine with PM. Add Quad and Skew Quad Correctors H & V Correctors Add Quad and Skew Quad Correctors

WINDOW FRAME H&V CORRECTORS ± 4.13” EMITTANCE SLIT PROFILE MONITOR LOW FIELD SOLENOIDS w/H&V Corrector HIGH FIELD SOLENOID K Hamdi WINDOW FRAME Quad and Skew Quad CORRECTOR Standard BPM’s 180 o Dipole Magnet Neighborhood II Small Aperture BPM’s Both with PM’s ?? New Horizontal PROFILE MONITOR Remove H&V PROFILE MONITOR?

4 180 o Dipole Magnet Neighborhood III Add Profile Monitor

20 o Dipole Neighborhood II 5

Large Dia. BPM Housings (4.8 ID), 28mm buttons Order Placed with MPF Vendor’s Project Schedule 1 st Article Button(s) 10/5/15 3 month housing fabrication Housing fabrication start 10/12/15 Increase number of button first articles Start housing fabrication now Special ID for 180 Magnet Same button size, Analysis OK Eliminate vertical button for PM Combined with Profile Monitor, Add single emittance slit, impedance??, ferrite location?? BPMs in Cooling Section(14 Locations)

Buckley magnets complete 8/20/ weeks shipping + customs. Alpha Magnetics update: We have started winding the trim coils and we are machining all the parts, the only materials I don’t have yet is the main coil wire yet… should be here next week. Ken Wadsworth Alpha Magnetics Design support stand assembly – provide space for mu metal shields, separate beam pipe stand support. Magnetic shielding analysis (Wuzheng) Design prototype mu metal shields and supports. Magnet measurement fixture plan for prototype and design test fixtures. Compensating and Matching Solenoids 7

Cooling Section Profile Monitors 8 Ferrite ring mounting design complete. CMD5005 material. Requisition for commercial vacuum linear stage, requisition complete YAG screen/mirror holder design complete. Fabrication drawings for YAG screen/mirror holder and vacuum chamber Revise RF impedance design Stage Assembly (Linear Feedthrough) Zero Length adapter flange Profile Monitor YAG Screen Assy.

Cooling Section Profile Monitors 9 Revise RF impedance redesign: remove ferrite install RF fingers.

Cooling Section Emittance Slits 10 Motor drives and position indication specs. approved by vendor. Requisition for commercial vacuum linear stage? Tungsten plate vendor, design adapter tungsten plate to drive shaft flange.

Requisition Status Range of motion for magnet core +/- 10cm. Magnet Vertical Gap = 10.0 cm (3.94 in.) Vacuum Chamber Aperture = 9.5 cm (3.75 in.) 180 o Dipole Magnet 11

Beam line bellows & 180 accordion bellows requisition status. “Standard Chamber Length” 180 chamber 316L vacuum annealed to 900C after welding. Test chamber welded and measured. Annealing Shielded valves on order, need DC Gun shielded valves. Vacuum Hardware 12

20 o Dipole Magnet 13 Requisition approved SOW – 2 magnets by 10/1/2015. Order Placed 5/6/2015 Everson Tesla Estimated Delivery 1 st two magnets 10/1/2015 Distance Between Pole Faces = 10.4 cm (4.1 in.) Magnet Vertical Gap = 10 cm Vacuum Chamber V Aperture = 9.5 cm (3.74 in.)

20 o Dipole Magnet Vacuum Chamber Here attached the wake field analyses of the 180 degree and 20 degree chambers for LEReC. The 180 degree chamber shows a wake loss factor at V/pc, and for the 20 degree chamber, it is Best,Binping Fabrication Drawing

Design 180 o dipole chamber for impedance review (KH) LF & HF solenoid and 20 o dipole fabrication drawings (KH) BPM chamber and buttons (VDM) Beam Line 5” bellows with shields fabrication drawings (GW) 20 o dipole vacuum chamber for impedence review (KH) 180 o dipole fabrication drawings (KH) 180 o vacuum chamber + large sliding bellows fabrication drawing (KH) Beam Instrumentation ES W slit & chamber fabrication drawings (VDM) Beam Instrumentation PM YAG, mirror, mount, & chamber fab. drawings (GW) Beam Instrumentation PM ferrite insert (GW) 20 o dipole vacuum chamber (KH) 20 o and 180 o stand drawings (KH) Beam line solenoids, BPM’s, and long pipe independent stands. Magnetic Shielding drawing and solenoid magnetic measurement test station Cable tray and penetration drawings LEReC Cooling Section Design Room 15

Phase 2: 5 cell cavity positioning (RM) DC Gun Vacuum Chamber Fabrication Drawings (JH) DC Gun SF6 Pressure chamber specification control drawings (JH) DC Gun to Booster SRF booster cavity beam line (JH) DC Gun & SF6 Chamber stands (JH) RHIC 1:00 move real estate drawings (VDM) Phase 2: 5 cell cavity positioning (RM) – Revised Position Phase 1 and 2 cryogenic system layout (RM) 2.1 GHz warm cavity fabrication drawings (MG) 704 MHz warm cavity fabrication drawings DC Gun cathode insertion drive DC Gun cathode coating system upgrade – coating system vacuum chamber Transport line layout drawing (RM/VDM) LEReC Design Room 16

Reference Slides 17

Freeze Cooling Section?? 18

20 o Dipole Magnet Neighborhood 19

o Dipole Magnet Neighborhood II Aperture Transitions

5 cell cavity location 21 New updates? 5 cell

Window-frame Skew Quad: 100 A-turn per corner = s-quad gradient 3.19 G/cm or, 3.19E-2 T/m Current polarities: Opposite corners have the same polarity Adjacent corners have the opposite polarities. LEReC Dipole Skew Quad Corrector

Sector 1 Relocation Meeting 5/22/2015

Sector 2 Modifications LEReC: Move cable tray/Modify cable tray Move Access Controls Gate Remove stairway and part of cross-over platform Tunnel Penetrations