Plan. 12/05/2015 2 Who are we? PM (Project Management and Resource Planning) – APT – IMPACT – PPTEU2 – Plan LS1 – 2012 –…–… Plan V2 – From LS1 to LS2.

Slides:



Advertisements
Similar presentations
CERN Draft 0.2 July 26th, 2011IMWG - Workflow sub working group - draft Proposal.
Advertisements

ORGANIZATION. 2 Problem scenario  Develop an organizational chart for your laboratory showing lines of authority from the head of the organization to.
 Every stage from phase DESIGN in Software Development Process will have “design document” especially in analysis and design phases.  “Design document”
Avra Software CMPUT Process Quality and Software Assessment Case Study - slide#1©P. Sorenson and Amr Kamel Assessment Plan for Assessment Plan for.
Dr. José Miguel JIMENEZ LS2 Coordinator LHC Performance Workshop (Chamonix 2014) Session 8 - Long Shutdown 2 Strategy and Preparation Chair: José Miguel.
Session 8 - Long Shutdown 2 Strategy and Preparation LIU Planned Activities Reference : RLIUP Oct.2013 (indico) “Work Effort in the LHC Injector Complex,
Consolidation and Upgrade of the LHC Experimental Vacuum Sectors
Accelerator Complex Controls Renovation, LHC Excluded Purpose and Scope M.Vanden Eynden on behalf of the AB/CO Group.
11 T Dipole informal coil and assembly readiness review Long coil and fabrication tooling development status and plans September 22 nd, 2013 – F. Savary.
Chapter 2: Overview of Essentials ISE 443 / ETM 543 Fall 2013.
© Blackboard, Inc. All rights reserved. Back to the Feature: An Agile, User-centric Software Development Lifecycle Cindy Barry Senior Product Manager Martha.
S L H C – P P Management Tools Kick-off Meeting April 8 th, 2008 Mar CAPEANS CERN This project has received funding from the European.
LHC machine Schedule, coordination & WAT K. Foraz March 22 nd, 2011 IMWG - LHC machine1.
PLANNING AND SCHEDULING
CERN Draft 0.3 – after meeting July 29th, 2011IMWG - Workflow sub working group - draft after meeting.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
LIU-IONS Linac3 meeting LIU Project – Planning and Installation Julie Coupard EN/MEF-OSS.
TS, Length of YETS EYETS LIU & CONS Project
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
SLHC – PP Management Plan April 3 rd, 2008 M. Capeans, M. Ropka CERN April 3, 20081M.C.
HC Review, May 2005 Hardware Commissioning Review Hardware Commissioning Review Quality Assurance and Documentation of Results Félix Rodríguez Mateos,
Access zones and Training Steve Hutchins BE-ASR IEFC workshop 7/3/2012.
CERN Draft 0.2 July 26th, 2011IMWG - Workflow sub working group - draft Proposal.
1 1. Some recent views ( ) 2 Linac tunnel
Consolidation and Upgrade of the SPS Electrical Networks Current Status JP. Sferruzza, on behalf of EN/EL.
Status of QUACO project
Planned Document Management Improvements Rob McKercher, Iain Goodenow, George Angeli.
STATUS OF THE LHC INJECTORS UPGRADE (“LIU”) PROJECT R. Garoby for the LIU Project Team March 6, 2012CERN.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
LIU-ABT systems: SPS B.Balhan, J.Borburgh, H.Day 20 th November 2015.
Response to TAC8 and Annual Review Recommendations John Haines Head of Target Division April 2, 2014.
LS2 Safety Thomas Otto, LS2 Safety Coordinator.
Workshop Objectives & Highlights from Daresbury Meeting Erk Jensen, CERN.
LIU-PSB Configuration Management EDMS Documentation, Layout and ECRs Thomas Birtwistle EN-MEF-DC.
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
M. Arnaud, C. Bedel, J. Etheridge, E. Paulat CERN SAFETY AND COORDINATION TEAM.
Resources, Schedule and Risk Management Pierre Bonnal CERN DG-DI Projects Support Office 1 st HiLumi LHC Collaboration Meeting 16 th to 18 th November.
TE-CRG-CE OMP Meeting 06 / 11 / 2014TE-CRG-CE OMP Meeting.
LHC Injectors Upgrade Project 1/12/2010 R. Garoby.
Quality assurance - documentation and diagnostics during interventions Corrective maintenance seen from the Technical Infrastructure operation Peter Sollander,
25/04/2014R. Guida, A. Wasem PH-DT-DI Gas1 Outline ALICE gas systems meeting Outline Introduction Review usage of ALICE gas M&O 2013 Review achievements.
25/03/2014P. Carrie, R. Guida, S. Pavis PH-DT-DI Gas1 Outline LHCb gas systems meeting Outline Introduction Review usage of LHCb gas M&O 2013 Review achievements.
Project Breakdown Structure Tracing changes to our different baselines I. Bejar Alonso and Project Office TCC – 14 th January 2016.
28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. Long.
TE-CRG Activities D. Delikaris, TE-CRG.
Nature of workgroup(s) involvedconsequences if not done consolidate beam dumpEN/STIcontinue running with obsolete dump, and without spare upgrade beam.
Linac4 Project Meeting 1/2011 3/3/2011 M. Vretenar Update on schedule and structure 1.
Dr. José Miguel JIMENEZ LS2 Project Leader, CERN 1 LS2 Days 30 th September2015.
SPS 200 MHz RF Upgrade Eric Montesinos LIU-SPS coordination meeting 15 th August 2012.
1 st of April st LS2C LS2 Committee Mandate and Organization 2 Chairman:Jose Miguel JIMENEZ Deputy:Jean-Philippe.
CERN GS Department CH-1211 Genève 23 Switzerland cern.ch/gs-dep Internet Services GS AIS General Services Department GS Advanced Information Services EVM.
ESS | title of presentation | 2012-xx-xx | name of presenter Roles and Responsibilities sub title.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Managing the survey activities during the Long Shut-down 1 Dominique Missiaen D. Missiaen, Iwaa14, October 2014, IHEP, Beijing, China1.
Transport and Handling Manpower Planning S. Prodon – LEAF
Use of PLAN in EN Department 1 st of April 2016 Michele Battistin.
LIU Configuration Management EDMS Documentation, Layout and ECRs This presentation follows the LIU-PSB specific presentation done on 9 th October 2014.
LIU Critical Key activities in Long Shutdown 1 (2013) LIU-PSB: assuming LINAC4 connection in LS2 –Beam dump consolidation If not done: operation will be.
LS2 Safety Preparation Thomas Otto, LS2 Safety Support Officer for LHC
LIU and TE/VSC activities Status September 2016 LIU-SPS aC coating & flange impedance reduction Paul Cruikshank on behalf of TE-VSC LIU & TE-VSC, 19/9/2016.
CERN Construction Planning and Scheduling (LHC installation)
Plan for LS2 – Version 2 08/02/2017.
Framework Schedule from EYETS 2016 to LS2
June 22, 2017 Burkhard Schmidt for the DT coordination team
CMS gas systems meeting
Overview & baseline of LS2 and roadmap for CRG
EP Experiments safety validation process Safety Permits
East Hall under construction
Benoît DAUDIN (GS-AIS-PM – CERN) 22-March-2012
IMPACT YETS 2017–2018 & LS2 preparation
Presentation transcript:

Plan

12/05/ Who are we? PM (Project Management and Resource Planning) – APT – IMPACT – PPTEU2 – Plan LS1 – 2012 –…–… Plan V2 – From LS1 to LS2 Benoît Daudin Manuel Alvarez Alvarez Eloy Reguero Fuentes

12/05/

12/05/ Agenda Actors and Roles Plan Basics: – Activity – Version and Stages Planning Exercise Activity Approval Process

12/05/ Actors & Roles

12/05/ Actors and Roles Actors Plan LeaderJ. Miguel Jimenez Plan CoordinatorKaty Foraz Quality Assurance ManagerRachel Decreuse-Michaud Group CoordinatorGroup Leaders Group Plan OfficerNominated by Group Coordinators Project LeaderLS2 Project Leaders AuditorOrg Unit, Plan, Project, Facility, … -Department Heads -Section Leaders -Facility Coordinators

12/05/ Plan Basics

12/05/ Activity Technical Responsible Responsible Group Contribution Group 1 Contribution Group 2 Contribution Group N

12/05/ Iterative Planning Granularity varies along time Evolution of the plan  Versioning Version Version Version ‘n’ X Y 

12/05/ Stages Work in a Plan Version is organized in sequential Stages: Initialization 01-Sep Oct-2015 Prioritization 01-Nov Nov-2015 Resource Alloc. 16-Nov Dec-2015 Final Approval 16-Dec Jan-2016 Version 1 Active Released

12/05/ Let’s Plan…

12/05/ Declare Activities Initialization Prioritization Resource Allocation Final Approval Responsible Group

12/05/ General Title* Responsible Group* Technical Responsible* Type* – Inspection, Preventive, Corrective, Consolidation, Upgrade WBS Node* (to be defined) Facilities* – LHC machine, ATLAS, Alice, SPS, PS… Location Information Goal* Impact if not done* Impact if postponed* Initialization Prioritization Resource Allocation Final Approval * : Mandatory Fields  LIU  HL-LHC  LINAC4  LHC Consolidation  …

12/05/ Propose Scheduling For each activity phase – Proposed Period* – Duration (weeks) * When will be the equipment ready for installation? Comments on equipment Initialization Prioritization Resource Allocation Final Approval  2016  2016-S1  2016-S2  2017  2017-S1  LS2  LS2-S1  LS2-S2  LS2-S3 Preparation Activity phases: Commissioning… Installation Version Stage != Activity Phase

12/05/ Request Group Contributions Group Contribution: – Activity Phase* – Group* – Description* – Comments Initialization Prioritization Resource Allocation Final Approval Activity Technical Responsible Responsible Group Contribution Group 1 Contribution Group 2 Contribution Group N

12/05/ Allocate Resources for Coordination Responsible group must define resources to coordinate the activity. Initialization Prioritization Resource Allocation Final Approval Resource allocation will be explained more in detail shortly…

12/05/ Activity Prioritization && Scheduling Initialization Prioritization Resource Allocation Final Approval Plan Coordinator

12/05/ Prioritization Priority* - Priority list to be defined Initialization Prioritization Resource Allocation Final Approval  P0 – Safety  P1 – Beam to 6.5-7TeV, nominal performance  P2 – Reliable performance improvement  P3 – CERN approved projects  P4 – no CERN approved projects LS1 priority list:

12/05/ Scheduling For each activity phase: – Accepted Period* Initialization Prioritization Resource Allocation Final Approval

12/05/ Activity Resource Allocation InitializationPrioritization Resource Allocation Final Approval Contribution Group

12/05/ Allocate Resources for Contribution N resources of type: – Personnel Resources Staff or Fellows – Associated Personnel Resources Collaboration Agreements, Contractors, PJAS, COAS… – Material Resources InitializationPrioritization Resource Allocation Final Approval

12/05/ Personnel Resources Resource Description* (Engineers, Technicians, …) FTE Needed* Number or Duration (weeks / months) * How many parallel teams can perform this activity? * Do you have the resources needed to perform the activity? * (Yes / No) InitializationPrioritization Resource Allocation Final Approval  0-1  1-2  2-5  5-10        > 1000

12/05/ Associated Personnel Resources Same as for Personnel Resources +: – Collaboration Agreement – Contractor InitializationPrioritization Resource Allocation Final Approval

12/05/ Material Resources Resource Description* Budget (kCHF) * Do you have the budget needed to perform the activity? * (Yes / No) – In case that the answer is Yes then indicate the budget code or the budget owner (Group or Project) InitializationPrioritization Resource Allocation Final Approval

12/05/ Activity Final decision InitializationPrioritization Resource Allocation Final Approval Plan Coordinator

12/05/ Final decision by Plan Coordinators – Approve – Postpone InitializationPrioritization Resource Allocation Final Approval Before an activity goes to Waiting Final Approval every contributor group needs to validate their resource allocation.

12/05/ Activity Approval Process

12/05/ Approval Process

12/05/ Workflow Transitions TransitionFromToMain Actors Create-CreatedCoordination Group SubmitCreatedWaiting for PrioritizationCoordination Group Start Resource AllocationWaiting for PrioritizationWaiting Resource AllocationPlan Coordinator Request Final ApprovalWaiting Resource AllocationWaiting Final ApprovalCoordination Group ApproveWaiting Final ApprovalApprovedPlan Coordinator PostponeWaiting Final ApprovalPostponedPlan Coordinator CancelAnyCancelledPlan Coordinator FinishCreatedFinishedCoordination Group Status Created Waiting Prioritization Waiting Resource Allocation Waiting Final Approval Approved Postponed Cancelled Finished

Thank you