REPORT to RPF May 2007 TMH1 Revision Dave Wright.

Slides:



Advertisements
Similar presentations
Preparation of the Self-Study and Documentation
Advertisements

TEN-T Info Day for AP and MAP Calls 2012 EVALUATION PROCESS AND AWARD CRITERIA Anna Livieratou-Toll TEN-T Executive Agency Senior Policy & Programme Coordinator.
Participation Requirements for a Guideline Panel Member.
MOSS 2007 Document Management Adam McCarthy 1 st April 2009.
Step by Step Guide for Regulations S HELLY B EZANSON K ELLY O FFICE OF G ENERAL C OUNSEL S EPTEMBER 5, 2012.
Binder Distributor Certification 21 November 2007 RPF Pretoria.
CC sponsors and PMs John Harvie, Steve Hulm MRPO 25 April 2007.
Binder Distributors Task Team Feedback. Progress since May Resolution #7 –To review the process of binder distributor certification as fit for purpose.
Effective Feedback for Improved Performance Presented by Christina Campbell and Belinda Musick.
RPF Binder Distributor Task Team Feedback 21 May 2003 Pietermaritzburg.
Road Pavement Forum May 2001 Road Materials Committee.
TIA Engineering Manual 6 th Edition Preview and Overview.
SUBSEA PRODUCTION SYSTEMS (SC17) Liaison Report
Bituminous Stabilized Materials Guideline RPF Feedback : K Jenkins May 2006.
Interim Guidelines: The Design and Use of Foamed Bitumen Treated Bases Fenella Long Road Pavements Forum November 2001.
How to write a Report On Assessment Source: AUN Secretariat.
Quality Control Testing
Slide: 1 27 th CEOS Plenary |Montréal | November 2013 Agenda Item: 15 Chu ISHIDA(JAXA) on behalf of Rick Lawford, GEO Water CoP leader GEO Water.
FEEDBACK ON SANRAL / SAACE /SAFCEC WORKSHOP ON LABORATORY ACCREDITATION & MANAGEMENT Held on 28 MARCH 2003.
Integrated Online Research Compliance System (iORC)
How an idea becomes an IEC standard Gary Johnson Chairman IEC SC45A
Status Report on Standard Specifications and Codes of Practice Department of Transport RPF November 2004.
COTO Road Materials Committee (RMC) Towards National Specifications Road Pavement Forum 07 November 2006 Elzbieta Sadzik.
United Nations Counter-Terrorism Committee Executive Directorate (CTED) Revised documents and procedures for assessing Member States’ implementation efforts.
Report back on binder distributors Trevor Distin.
Click to add title SABS STANDARDS DIVISION Standards Development Natural Science.
Slide: 1 Osamu Ochiai Water SBA Coordinator The GEO Water Strategy Report – The CEOS Contribution Presentation to the 26 th CEOS Plenary at Bengaluru,
Interim Guidelines: The Design and Use of Foamed Bitumen Treated Materials Kim Jenkins, Dave Collings Hechter Theyse, Fenella Long Road Pavements Forum.
Why Proposed TC Procedures? Define how TC reaches “completion” of what OASIS calls “Committee Specifications” TC procedures lead up to the OASIS process:
RPF Task Group Feedback Lab Accreditation TG Skills Development TG 11/12 May 2005.
Review of TMH1 Tests on asphalt. Role of Sabita Motivation Standards.
PROGRESS OVERVIEW: COLTO STANDARD SPECIFICATIONS TMH AND TRH DOCUMENTS OTHER DOCUMENTS.
RPF Laboratory Accreditation/Verification Task Group Feedback from meetings of 12 April 2002.
Binder Distributor Accreditation 22 November 2005 RPF Pretoria.
RPF Task Group Feedback Skills Development TG 10 & 11 May 2006.
15 th ROAD PAVEMENTS FORUM Mpekweni Beach Resort 6-7 May 2008 Final Session: Resolutions.
Tripartite Meeting September 2006 Seoul, Korea Item B12. CSR Maintenance Procedures - feedback and commentary mechanisms on Q&As, CIs and Rule Change Proposals.
Pavement Research Advisory Committee (PRAC) 13 th Meeting of the RPF 8 May 2007.
NCHRP National Cooperative Highway Research Program Project 20-07: Research for AASHTO Standing Committee on Highways.
REPORT to RPF November 2007 TMH1 Revision & Proficiency Testing Mervyn Henderson TMH1 report prepared by Dave Wright.
Dual Logo Procedures Alex Zamfirescu IEC USNC TA TC93 Convener IEC TC93 WG2 November 2004.
STATUS OF INDUSTRY DOCUMENTS SANRAL PERSPECTIVE. SPECIFICATIONS & STANDARDS  OWN  INDUSTRY SANRAL USE :
15 th RPF 6 – 7 May 2008 Standard test methods for hot mix asphalt.
Black Top Committee a joint initiative in the Western Cape.
Necessary Information Required compressive strength at 28days: 30 Mpa Type of structure: mass concrete, beam, column. Maximum size of aggregate: 20 mm.
The Role of the Internal and External Evaluators in Student Assessment Arthur Brown Advisor to the Quality Assurance and Accreditation Project Republic.
Guidelines Revisions Next Steps April 23, Process to Date Staff and others identified a number of “issues” since guidelines were last approved April.
Department for Nuclear and Radiation Safety of the Ministry for Emergency Situations (Gosatomnadzor) Leading specialist Diana Rusakevich Belarus Department.
Doc.: IEEE Submission March, 2014 Pat Kinney, Kinney ConsultingSlide 1 Project: IEEE P Working Group for Wireless Personal Area.
QUALITY CONTROL TESTS FOR VARIOUS LAYERS OF FLEXIBLE PAVEMENTS
Communities of Practice & L ESSONS L EARNED Budget, Finance, and Award Management Large Facilities Office May 2016 Large Facilities Workshop 2016 S. Dillon.
process and procedures for assessments
WP1. DEVELOPMENT OF TRAINING MATERIALS
New Comprehensive Zoning By-law December 12, 2016.
Licensed Educator Professional Growth and Evaluation Process
WP1. DEVELOPMENT OF TRAINING MATERIALS
NATA Foundation General Grants Program Process
Pts feedback - what are the trends telling us… & methods in question
Standards Development: An Overview
Raising the Bar: technician certification
September 2014 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4s Closing Report for September 2014]
GRADING & RELATED ISSUES WORKSHOP : AGGREGATES
Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [A Brief Overview of Draft Approval.
2012 Annual Call Steps of the evaluation of proposals, role of the experts TEN-T Experts Briefing, March 2013.
Second Independent Evaluation of UNAIDS
Ag.No. 2 & 3 Action points from PY meeting
NATA Foundation General Grants Program Process
January 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c Project Plan] Date Submitted: [17.
Submission Title: [ e BRC Motions for the April 2016 teleconference]
Calendar Overview – Phase I – REVISED April 2019
Presentation transcript:

REPORT to RPF May 2007 TMH1 Revision Dave Wright

TMH1 Revision - OVERVIEW  Under auspices of MTC  Funded by SANRAL, PAWC, Freetrans and SABITA  Priorities set by funders PURPOSE  Publish as SANS managed by SABS  Legal standing, credibility in Africa and long-term ownership  During rewriting into SANS format, improve and amend where necessary  Stand-alone methods – reviewed after first year in use

TMH1 Revision - OVERVIEW PROCEDURE First Draft circulated as widely as possible throughout industry (also SADIC) Contentious issues reviewed by small working groups Final Draft approved by MTC and submitted to SABS SABS: Tech review, Edit review, TC 61, Public Comment & Objections, Final Approval and Publication

PILOT STAGE 11 Methods – In Final Draft  Wet grading, Atterberg Limits and Linear Shrinkage (3 LL procedures), moisture content, dry grading, ALD (Meas & Comp), Calcs of GM, FM etc, Mod and CBR All except Mod & CBR submitted to SABS in September 2006  Major delay > 6 months in starting SABS review SABS have appointed extra staff to assist

SECOND STAGE 11 First Drafts sent out in April for industry comment  Aggregates: grading, FI, ACV, 10% FACT, ARD / BRD  Concrete: Lab mix specimens, Slump, Dimensions of specimens & compr. strength  Mod MDD of lab mix stab samples  Checking, handling and maintenance of sieves Very poor industry response

SECOND STAGE SABITA have put in R for work on Asphalt and Bitumen methods 5 Asphalt Methods - First Draft Sent to SABITA – Feb 2007 They will  Submit to members  P Myburgh to deal with feedback  Submit to MTC for consideration

SECOND STAGE 6 Binder Distributor Tests from SABITA DRAFT MANUAL  Being ‘SANSified’ by Project team  Will go to SABITA for comment 3 Stabilization methods in preparation  Stab field sampling, UCS & ITS

Summary - TMH1 Revisions Major delays in SABS  Hopefully sorted with extra staff Normative references  3 month delay for Project team Publish first set – whole of Pilot Stage (?) by the end of 2007  SABS norm = 2 years from inception!! Once going keep momentum …..

NUCLEAR DENSITY TESTING RPF Resolution May 2006 “to be handled as it arises in TMH1 Review” However, recent Problems with Nuclear Gauge Density measurements Issues raised in meeting at SANRAL WC in March 2007 – Dave Wright asked to work on as priority in conjunction with Barry Dumas Work attached to TMH1 brief and funded through PAWC contribution Major misconception – not a density meter!

NUCLEAR DENSITY TESTING Issues requiring attention  Operator certification including handling procedures  Verification – standard blocks  Testing procedure – initialization, bedding, orientation, count time, block checks  Interpretation of results  Problem materials Many opinions of performance Reviewing data and running some basic observations

TMH1 PROJECT TEAM Tony Lewis Wim Westra Basie Nothnagel Dave Wright CONTACT cell phone Thanks for your attention