1 Brian Finneran, Oregon DEQ WRAP IWG Meeting, Santa Fe December 2006 Update on Regional Haze 308 SIP Template.

Slides:



Advertisements
Similar presentations
Update on Regional Haze November 15, 2012 Michele Notarianni EPA Region 4 1.
Advertisements

Attribution of Haze Workgroup & Technical Support System Report Fire Emissions Joint Forum Meeting July
Attribution of Haze Phase 2 and Technical Support System Project Update AoH Meeting – San Francisco, CA September 14/15, 2005 Joe Adlhoch - Air Resource.
Technical Support System Review / / RPO Monitoring/Data Analysis Workgroup Conference.
Regional Haze Rule Guidance: Tracking Progress & Natural Levels Overview of the concepts currently envisioned by EPA working groups by Marc Pitchford;
Weight of Evidence Checklist Review AoH Work Group Call June 7, 2006 Joe Adlhoch - Air Resource Specialists, Inc.
Technical Support System Review Board Meeting March 8, 2007.
WRAP Regional Haze Analysis & Technical Support System IMPROVE Steering Committee Meeting September 27, 2006.
1 WRAP Fire Tracking Systems Draft Intent of WRAP FTS Policy – Assist states/tribes to address emissions inventory and tracking associated with fire in.
1 WRAP Policy Fire Tracking Systems Draft December 9, 2002 FEJF Meeting December 10-11, 2002 Jackson, WY.
Final Amendments to the Regional Haze Rule: BART Rule Making June 16, 2005.
Attribution of Haze Phase 2 and Technical Support System Project Update Dust Emissions Joint Forums – Tempe, AZ November 16, 2005.
An Update on the Colorado Regional Haze SIP Process and Outcomes Presented at: WRAP – Implementation Work Group San Francisco, CA March 2005.
WRAP Committee and Forum Updates WRAP Board Meeting Salt Lake City, UT October 15, 2003.
1 Update on the STIP-II Project & Draft Model SIP Brian Finneran Oregon Department of Environmental Quality WRAP Meeting Portland, OR April 3, 2003.
Causes of Haze Update Prepared by Marc Pitchford for the 5/24/05 AoH conference call.
Next Steps in Regional Haze Planning in the Western U.S. Prepared by the WESTAR Planning Committee for the Fall Business Meeting, Tempe, AZ October 31,
Reasonable Progress Demonstration Case Study (Dec 7, 2006) Analysis done for Dec 7, 2006 WRAP IWG meeting Starkey (STAR1) monitoring site in northeast.
BART Guideline Overview WESTAR August 31, 2005 EPA Office of Air Quality Planning and Standards Todd Hawes
Regional Haze SIP Development Overview AQCC Presentation July 2005.
An Integrated Systems Solution to Air Quality Data and Decision Support on the Web GEO Architecture Implementation Pilot – Phase 2 (AIP-2) Kickoff Workshop.
§309 Technical Support Document “Table of Contents” First Draft Tom Moore WESTAR Fall Technical Conference September 19, 2002.
Draft, 2 June NATURAL HAZE LEVELS SENSITIVITY ASSESSMENT 1. Project Overview Ivar Tombach Regional Haze Data Analysis Workshop 8 June 2005.
Update on the STIP-II Project: Draft Model SIP Brian Finneran Oregon Department of Environmental Quality WRAP Air Manager’s Committee Santa Fe, NM March.
AoH Phase 2 and TSS Project Update WRAP Technical Analysis Forum Las Vegas, NV February 6, 2007.
1 Conducting Reasonable Progress Determinations under the Regional Haze Rule Kathy Kaufman EPA Office of Air Quality Planning and Standards January 11,
Source Attribution Modeling to Identify Sources of Regional Haze in Western U.S. Class I Areas Gail Tonnesen, EPA Region 8 Pat Brewer, National Park Service.
Technical Projects Update WRAP Board Meeting Salt Lake City, UT November 10, 2004.
BART SIP Development: Example from Colorado Rocky Mountain National Park WRAP IWG Meeting, Denver, CO August 29, 2007 Presented by: Ray Mohr and Curt Taipale.
Air Quality Policy Division D P A Q 1 Regional Haze Update WESTAR September 17-19, 2007 EPA Office of Air Quality Planning & Standards.
EPA – Regional Haze Issues IWG Meeting April 17 th Keith Rose and Laurel Dygowski.
1 Brian Finneran, Oregon DEQ WRAP IWG Meeting, Portland August 2006 Suggested Changes to IWG Section 308 SIP Template.
Recommendations from Regional Haze Workgroup Core Issue 1: 5- Year Progress Reports The RHR requires Comprehensive SIP revision every 10 years (first in.
Air Quality Relative Values Data Summaries Graphical summaries of the current air quality status and trends in National Parks and other federal lands.
Weight of Evidence Discussion AoH Meeting – Tempe, AZ November 16/17, 2005.
Summary of June 15, 2005 Revisions to RH BART and BART Guidelines.
1 Incorporating Smoke Management Plans into SIPs: THE OREGON 309 SIP Brian Finneran Oregon Department of Environmental Quality Smoke Management Planning.
VISIBILITY SIPS The Regional Haze Rule Requirements for Fire The Role of the RPOs Opportunities for Participation US FISH AND WILDLIFE SERVICE Dennis Haddow.
Implementation Workgroup Meeting December 6, 2006 Attribution of Haze Workgroup’s Monitoring Metrics Document Status: 1)2018 Visibility Projections – Alternative.
TSS Project Update WRAP Technical Analysis Forum Boise, ID May 22, 2007.
Regional Haze Rule SIP Template Clean Air Corridors Section (d)(3) Brian Finneran - Oregon DEQ WESTAR 2002 Fall Technical Conference.
Attribution of Haze Report Update and Web Site Tutorial Implementation Work Group Meeting March 8, 2005 Joe Adlhoch Air Resource Specialists, Inc.
Ambient Monitoring & Reporting Forum Plans for 2005 Prepared by Marc Pitchford for the WRAP Planning Team Meeting (3/9 – 3/10/05)
Reasonable Progress Demonstration Case Study for Saguaro Wilderness Area Arizona Regional Haze Stakeholder Meeting January 22, 2007.
Regional Haze Rule Promulgated in 1999 Requires states to set RPGs based on 4 statutory factors and consideration of a URP URP = 20% reduction in manmade.
Summary of STIP Project Workplan Development of A Model SIP/TIP for Section Brian Finneran, Oregon DEQ WESTAR Fall Technical Conference September.
Work Items for §309 SIPs WESTAR Fall Technical Conference September 19, 2002 Tom Moore & Brian Finneran.
AoH Work Group Weight of Evidence Framework WRAP Meeting – Tucson, AZ January 10/11, 2006 Joe Adlhoch - Air Resource Specialists, Inc.
308 Outline (a) Purpose (b) When are 1st plans due (c) Options for regional planning (d) Core requirements (e) BART requirements (f) Comprehensive periodic.
Attribution of Haze Phase 2 and Technical Support System Project Update Combined Session – Emissions and Fire Emissions Joint Forums – Missoula, MT September.
Weight of Evidence Approach: Soil and Coarse Mass Case Studies WRAP Workshop on Fire, Carbon, and Dust May 24, 2006 Joe Adlhoch - Air Resource Specialists,
CALIFORNIA Regional Haze SIP Development Progress Report IWG Meeting Portland, Oregon August 29-31, 2006.
Shawn McClure, Rodger Ames and Doug Fox - CIRA
Attribution Of Haze Case Study for Nevada Jarbidge Wilderness Area
Species Specific Reasonable Progress Analysis
Attribution Of Haze Case Study for Nevada Jarbidge Wilderness Area
Reasonable Progress: Chiricahua NM & Wilderness Area
AoH Phase 2 Update AoH Meeting – San Diego, CA January 25, 2006
Tom Moore (WESTAR and WRAP) and Pat Brewer (NPS ARD)
Status of Regional Haze Rule
IMPROVE Data Processing
Air Update, Georgia EPD Karen Hays Chief, Air Protection Branch
WRAP Overview and Role of Dust Forum
TAF Regional Haze Plan Update
Regional Haze SIP Status Report
Workshop Technical and Policy Studies to Support the Annex
Summary of RH-LTS Requirements (d)(3)
RA BART Overview Deb Wolfe 8/9/2019.
Status of Preliminary Reasonable Progress Analysis
Joe Adlhoch - Air Resource Specialists, Inc.
Presentation transcript:

1 Brian Finneran, Oregon DEQ WRAP IWG Meeting, Santa Fe December 2006 Update on Regional Haze 308 SIP Template

2 Basic Format for 308 SIP TEMPLATE 1. Introduction 2. Regional Haze SIP Development Process 3. Introduction to each Class I Area 4. Regional Haze Monitoring 5. Basic Plan Elements 6. Current Visibility Conditions 7.Visibility Impairment Analysis 8.Emission Inventory 9. Long-Term Strategy 10. Best Available Retrofit Technology (BART) Evaluation 11. Reasonable Progress Goal Demonstration 12. Consultation with FLMs, States, Tribes 13. Misc. other SIP commitments

3 What’s changed since last update of the RH SIP Template?  A lot more work than I originally thought…  Gradually has turned into an “Oregon” SIP template, given the need to start work on our own SIP.  Have been adding charts and graphs using the WRAP TSS, (see examples), similar to the Colorado draft SIP.  Has been an evolving format (e.g., by monitor site rather than by Class I area) by figuring out what should go where.  No longer anticipate completing a “generic” template to replace the original IWG version – but Oregon draft SIP can serve as an example to follow.  Now posted on the Oregon DEQ RH website at:

4 Examples of charts & graphs recently added Figure 3.1.1: Map of Crater Lake NP

5 Examples of charts & graphs recently added Mt. Hood IMPROVE Site Mt. Hood Wilderness Area Uniform Rate of Progress for 20% Best & Worst Visibility Days New IMPROVE Equation Year 20% Best & Worst Visibility Days [deciview] Worst Days Baseline = dv 2018 Goal = (reduction needed 1.7 dv) Natural Conditions = 7.76 dv Best Days Baseline = 2.17 dv

6 Examples of charts & graphs recently added Figure 7.1-1: Mt. Hood IMPROVE Site Aerosol Composition 20% Worst Days Baseline ( ) Mt. Hood IMPROVE Site Aerosol Composition ammNO3f_bext5.54 Mm % ammSO4f_bext11.3 Mm % CMf_bext2.47 Mm-16.6 % ECf_bext2.87 Mm-17.6 % OMCf_bext14.55 Mm % SOILf_bext0.08 Mm-11.9 % SeaSalt_bext0.71 Mm-10.2 % Total: Mm-1

7 Examples of charts & graphs recently added Table 6-1Best and Worst Days Baseline Conditions for Oregon Mandatory Class I Federal Areas Figure 7.1-2: Mt. Hood IMPROVE Site Baseline Worst Day Aerosol Composition compared to Visibility Improvement needed by 2018 & Baseline Average ( ) 2018 Improvement Needed 2064 Total Improvement Needed Reconstructed Extinction on 20% worst days [Mm-1] SeaSalt CM Soil EC OC NO3 SO4 1.7 Deciview 7.1 Deciview 30.1% 14.8% 38.8% 0.2% 6.6% 1.9% 7.6%

8 Oregon 308 SIP TEMPLATE How it looks now 1.Introduction History and Background of RHR, purpose of SIP, definitions  Overview of Visibility and Regional Haze  Oregon Class I Areas (list)  Summary of Section 308 and 309 of the Regional Haze Rule  Background on the Regional Haze Rule  Phase I Visibility Rules – the Oregon Visibility Protection Plan  The 1990 Clean Air Act Amendments  Submittal of the 2003 Oregon 309 SIP  Purpose of this Document  Definitions and Acronyms contained in this plan 2.Oregon Regional Haze SIP Development Process General description of the consultation process and public involvement  Federal Land Manager Consultation  State and Tribal Consultation  Advisory Committee Involvement  Public and Stakeholder Outreach

9 Oregon 308 SIP TEMPLATE How it looks now 3. Introduction to Oregon Class I Areas General introduction and description of each Class I area 4. Regional Haze Monitoring Description of monitoring strategy and summary of IMPROVE network  Overview of Oregon Regional Haze Monitoring Strategy  IMPROVE site locations in Oregon 5. Basic Plan Elements Overview of basic elements of the SIP, review of key terminology.  Anthropogenic Sources of Visibility Impairment  Baseline Conditions  Natural Sources of Visibility Impairment  Natural Conditions  Uniform Rate of Progress  Reasonable Progress Goal

10 Oregon 308 SIP TEMPLATE How it looks now 6. Oregon Current Visibility Conditions Summary of monitoring data that shows current conditions 7. Oregon Visibility Impairment Analysis Summary of monitoring data that shows impairment – aerosol composition, species trends, presumptive GP, URP 8. Emission Inventory – Current (2002) and Projected (2018) Summary of all emissions data  Oregon Emissions by Source Category  Local (Nearby) Emissions for Each Class I Area by Source Category  Regional Emission Maps  Back Trajectory Maps  TSSA emissions modeling

11 Oregon 308 SIP TEMPLATE How it looks now 9. Long-Term Strategy  Overview of the LTS  Summary of Interstate Transport and Contribution  Other State Class I Areas affected by Oregon emissions  Oregon Class I Areas affected by Other States  Estimated International Contribution to Oregon Class I Areas  Estimated Non-Anthropogenic Sources and their contribution to Oregon Class I Areas  Summary of all Anthropogenic Sources of Visibility Impairment considered in developing the LTS Emission Reductions Due to Ongoing Air Pollution Programs Measures to Mitigate the Impacts of Construction Activities Emission Limitations and Schedules of Compliance Source Retirement and Replacement Schedules Agricultural and Forestry smoke management techniques  Net Effect on Visibility from the LTS Emission Reductions from point, area, and mobile sources Projection of 2018 Visibility Conditions from 2002 Base Case

12 Oregon 308 SIP TEMPLATE How it looks now 10. Best Available Retrofit Technology (BART) Evaluation Summary of BART process, modeling, and control evaluation results  Oregon BART-eligible sources  Summary of BART Modeling Results  Summary of BART Control Analysis  Visibility Improvement Resulting from BART Evaluation in Oregon and Other States 11. Reasonable Progress Goal Demonstration Comparison of all haze strategies (chapters 9 & 10) to glide path, analysis if add’l controls are needed & affirmative RFG demonstration  Projected 2018 Visibility Conditions - Base Case vs. Control Case Scenarios  Review of Visibility Improvement from combination of BART modeling and regional modeling results.  Weight of Evidence summary for each Class I area  Comparison of RPG to the URP for each Class I area  Assessment if Additional Controls Measures are needed  Affirmative Demonstration of Reasonable Progress

13 Oregon 308 SIP TEMPLATE How it looks now 12. Consultation Similar to Chapter 2, but provides more info and details  Federal Land Manager Consultation  Other State Consultation Consistency with Neighboring State SIPs Oregon & Neighboring State Emission Reduction Obligations  Tribal Consultation  Public and Stakeholder Outreach 13. OTHER SIP REQUIREMENTS AND COMMITMENTS  Enforceability of Emission Limitations and Control Measures  Commitment to Future SIP Revisions  Commitment to Periodic Progress Reports  Determination of Plan Adequacy  Public Participation and Review Process List of Appendices and Technical Support Documentation

14 Work to do – Remaining Issues  Chapters 1-7 fairly complete – mostly just add more text description, and technical data from the TSS (current Class I visibility conditions and impairment analysis).  Chapter 8 Emissions, Chapter 9 Long Term Strategy and Chapter 10 BART results still need a lot of work. Summarizing Emissions data and BART results fairly straightforward. Describing the LTS is going to be a major undertaking…  The biggest challenge is Chapter 11 Reasonable Progress Goal Demonstration. Major concerns are: What methodology or approach should be used to show RP? Similar to Lee’s RP Demonstration Case Study for Starkey Oregon? How rigorous a demonstration will be needed here? What yet unfinished WRAP TSS related work is going to be needed to complete the RP demonstration? Will TSS final work be too late in terms of meeting the Dec 2007 deadline?

15 Questions?