CAMELOT Coordination Analysis Motivation Execution Logistics Tracking.

Slides:



Advertisements
Similar presentations
CH 4: Finding Your Unique Selling Point 14 January 2014 Lectured by: OR Vitou.
Advertisements

Standard Costs – Overview
1.1Definition of Construction:. Is the process by which material, equipment, machinery are assembled into a permanent facility. Is the process by which.
Project Procurement Management
Fixed price contract: A contract that provides a price for each procurement item obtained under the contract.
Procurement Management
Roadmap for Sourcing Decision Review Board (DRB)
Total Utility Management Services, LLC is committed to helping your organization make the best informed energy decisions with decades of cost-proven results.
1 Bid And Proposal Evaluation Bill Shelton Scott Norton
ANSI/EIA A EIA STANDARD Earned Value Management Systems Overview May 2, 2006 NDIA Program Management Systems Committee Walt Berkey, Lockheed.
©2006 OLC 1 Process Management: The Foundation for Achieving Organizational Excellence Process Management Implementation Worldwide.
Marcy Mealy Procurement Specialist CDBG Program
22 Nov 05 OSD TLCSM Memo Containing PBL Performance Metrics Operational Availability Mission Reliability Logistics Response Time Total Life Cycle Cost.
Copyright Course Technology Chapter 11: Project Procurement Management.
1 Achieving Total Systems Management (ATSM) Acquisition Strategies to Increase Reliability and Reduce Logistics Footprint PEO/SYSCOM Workshop November.
NASA Johnson Space Center Contracting Officer and Contracting Officer’s Technical Representative.
BP Centro Case Top management job descriptions Team 4 Jussi Tiilikainen Jiri Sorvari.
Top management jobs BP-Centro Finland Erno Karpoff
FAR Part 48 Value Engineering. What is Value Engineering It is a technique where contractors submit methods for improved performance or cost reduction.
Jeff Sestokas November 10, 2009 ARA Project Manager Course Introduction Project Management for ARA Engineers and Scientists.
Implementing and Managing a Maintenance Plan The Maintenance Plan Ken Henman.
GWAC Ordering Procedures Overview
LIFE CYCLE COST (LCC) REDUCTION FROM RAM AND SUPPORTABILITY ANALYSES IN ACQUISITIONS Bernard Price Certified Professional Logistician.
Click on Next to continue Introductio n Inputs Tools and Techniques Outputs Next 12.2 Conduct Procurements: Introduction The process of obtaining seller.
Contract Types PAO Approved SPR Contract Types
DoN ESPC PROGRAM M&V Briefing Russell Dominy, CEM.
NAESB MEASUREMENT AND VERIFICATION MODEL BUSINESS PRACTICE RETAIL ELECTRIC DEMAND RESPONSE NARUC update 9/14/09.
1 Procurement. 2 Overview Every municipality should keep procurement records that allow an auditor or other interested party to track the specific nature.
Georgia Institute of Technology CS 4320 Fall 2003.
YOUR PROPOSAL CAN LEAD TO CONTRACT AWARDS
What is Transportation Cost Management? A Proven and Measured Approach Reduces Transportation Costs (between 8-15% or more) Optimizes choice for low cost.
Copyright 2009  Understand the importance of project procurement management and the increasing use of outsourcing for information technology projects.
Proposal Pricing Training February 2004 Lance I. Stadler Pricing Manager, Corporate Headquarters Stanley Headquarters 300 North Washington Street, Suite.
1 | 2010 Lecture 3: Project processes. Covered in this lecture Project processes Project Planning (PP) Project Assessment & Control (PAC) Risk Management.
1 Improving the Risk Management Capability of the Reliability and Maintainability Program An introduction to the philosophy behind the AIAA S-102 Performance-Based.
Chapter 11: Project Procurement Management
BERNARD PRICE Certified Professional Logistician Supportability Optimization to Achieve Availability Goals in Acquisitions.
Slide number 1 Better Regulation Executive What can and should be measured? Improving measures of policy burdens through better Impact Assessment Making.
Alpha Contracting Sole Source Negotiations between Government and Industry (13 CFR (c)(2))
Weighted Guidelines Cost Efficiency Factor. Cost Efficiency Provides additional profit $ for reduction in costs on the “pending” contract Range is 0 –
Unit – I Presentation. Unit – 1 (Introduction to Software Project management) Definition:-  Software project management is the art and science of planning.
Parts Management Re-engineering and Warfighter Support International Society of Logistics May 17, 2005 Gregory E. Saunders Director, Defense Standardization.
Life Cycle Cost Savings by Improving Reliability Dr. Charles E. McQueary Director, Operational Test and Evaluation January 15, 2009.
PROPRIETARY  2003 Data Research Analysis & Consultancy Solutions All Rights Reserved. This is achieved by: Improving availability / reducing stock outs.
IT PROJECT MANAGEMENT B U D I L U H U R U N I V E R S I T Y POST GRADUATE PROGRAM OF INFORMATION TECHNOLOGY.
Info-Tech Research Group1 Manage IT Budgets & Cost World Class Operations - Impact Workshop.
2016 NSF Large Facilities Workshop New Initiatives Business Roundtable II-III May 25-26, 2016 Jeff Lupis, Division Director, Division of Acquisition and.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force As of:1 Mrs. Marty Evans SE Forum October 15, 2004 Institutionalizing.
Block 7 Project Procurement Management. ► The processes required to acquire goods and services from outside the organization ► Purchasing  Procurement.
Agenda  Purpose  Processes  Deliverables  Executing Activities 4.3.
Cost Efficiency Factor
Life Cycle of Federal Acquisition
Post Award Peer Review Briefing Slides
12.2 Conduct Procurements The process of obtaining seller responses, selecting a seller and awarding the contract The team applies selection criteria.
(Additional materials)
Certified Professional Logistician
Contracting by Negotiation Process Map – Part 15 (1 of 3)
Request for Proposal & Proposal
Advice to Industry Panel – Contract Management Perspective
Performance Playbook for GPO Value
Design-Build Acquisition and Contract Incentives July 19, 2018
CAMELOT Coordination Analysis Motivation Execution Logistics Tracking
Increased Competition = Lower Cost to Taxpayers
Linac Coherent Light Source (LCLS)
PRE-QUALIFIED AND PREFERRED SUPPLIER PROGRAM
Design-Build Acquisition and Contract Incentives May 9, 2019
Managing Project Work, Scope, Schedules, and Cost
Certified Cost or Pricing Data vs
Post Award Peer Review Briefing Slides
Presentation transcript:

CAMELOT Coordination Analysis Motivation Execution Logistics Tracking

Why CAMELOT?  Most of the System TOC is not Considered During a Source Selection  TOC is Driven by Early-on Design & Logistics Decisions  Necessary Information to Make Best Value TOC Decisions is not Normally Obtained  TOC must be Managed to be Reduced

C oordination  Transition the Requirements & Key Performance Parameters from the Customer/User Representatives  Discuss TOC or Ao Modeling with Industry  Internally Discuss Contract Requirements & Government Controlled Inputs to Properly Evaluate TOC or Ao

COORDINATION TOOLS BUSINESS OPPORTUNITY PAGES APBI COMMERCE BUSINESS DAILY SOO DRAFT RFP ASOAR ICT/IPT

A nalysis  Utilization of the Right Analytical Tools Throughout the Acquisition Process  Contractors & Government will be Utilizing the Same Tools to Optimize to Availability or Determine the TOC Impact of Proposed Actions PROPOSE MEASURE IMPROVE

CAMELOT Analysis Process TOC Modeling Portion Proposed Evaluated Baseline Revised Baseline Realized Proposed Expected Negotiated Expected Improved Expected Actual Contractor Inputs Government Inputs  Realized Savings/Costs  Proposed Savings

ANALYTICAL TOOLS COMPASS QUANTITY DISCOUNT EOQ SESAME SW COST MODELS ACE-IT TAILORED EXCEL SPREADSHEETS LCET CWARM

 Contractor’s TOC Evaluated in Source Selection to Stimulate TOC Competition  TOC Management Techniques Proposed & Evaluated in Source Selection  Establishing a Shared Data Environment  Managing TOC Reduction  Contractors Share in the Benefits Associated with their TOC Reduction Efforts by Incentives M otivation

MOTIVATION TOOLS PERFORMANCE INCENTIVES COMPETITION SHARED SAVINGS VALUE ENGINEERING PROGRAM AWARD FEES TOC IN SOURCE SELECTION

 TOC Baseline Factors are Determined Through Negotiations Prior to Award  Verification Procedures are Developed with Industry  Remedies to the Government are Clear & Corrective in Nature  Contractor Performance Fed into Performance History Database for Future PRAG E xecution

EXECUTION TOOLS CONTRACT BASELINES PRAG INPUT LONG TERM WARRANTIES TOC REDUCTION MANAGEMENT PROGRAM FIXED PRICE CONTRACTS

LO gistics T racking  Contractor Maintains Data in Their Own Format Covering All TOC Factors Within Their Control & Responsibility  Update of TOC Estimates Based on Field Returns or Proposed Improvements  Shared Data Environment Between Government & Contractor

LOGISTICS TRACKING TOOLS GOVERNMENT DATABASES CONTRACTOR MGMT INFO PRACTICES SYSTEM LOGS SHARED DATA ENVIRONMENT VIRTUAL TRACKING FRACAS

CAMELOT Changes to Current Acquisition Practices  Analyze System Reliability and Availability Requirements within Government  Use Govt Ao Driven LCC Models for Best Value Decisions & Encourage Industry to Use Them  Use TOC or Ao as an Evaluation Factor in Source Selection  Provide Incentives to Industry for TOC Reduction  Hold Industry Accountable for Delivering What It Promises  Establish a Shared Data Environment