Requirements concerning the interface linking the BPM to the quadrupole M. Wendt, S. Zorzetti.

Slides:



Advertisements
Similar presentations
Electrical wiring for piezo movers piezo power supply strain gauges readout temperature probes 1 Frédéric BOGARD – LAL/IN2P3/CNRS – Jan 25, 2013 Electrical.
Advertisements

EIA Line Sizes Coaxial Waveguide Custom Configurations Limited only by your imagination.
Linac4 BPM and Phase Pickup L. Søby08/ LINAC4 Beam Position, Phase and intensity Pick-ups.
Bob Lill FAC meeting Cavity October 30, 2007 LCLS Cavity BPM Status and Testing.
Bob Lill LCLS FAC June 16-18, 2008 RF BPM Status and Production Test Results.
CLIC-PACMAN: BPM-to-Quadrupole Alignment based on EM Field Measurements Manfred Wendt CERN BE-BI-QP.
Superconducting Large Bore Sextupole for ILC
CIEMAT CONTRIBUTION TO TBL PETS (January 2009) David Carrillo on behalf of the Accelerators Team.
SuperFRS Multiplett and Dipole Vacuum Interfaces Multiplett: Insulation vacuum: Insulation Vacuum Pumping flanges: Two CF flanges of the size DN160 must.
TDR Part 2: 3.3 Cavity Integration (10 pages) H. Hayano Baseline Design based on the meeting discussion.
Installation and checkout of QBPM system Hardware to be installed –Install hardware in racks –Install CPU /SIS digitizers/VMIC 3122 analog digitizers/Digital.
Internal Cryomodule Instrumentation ERL Main Linac Cryomodule 10/10/2015 Peter Quigley, MLC Design Review.
Signal port flange and beam pipe Norihito Ohuchi 2009/10/27122nd S1-G Webex meeting.
Franz Peters, Georg Gassner WPM/HLS Status and June 17 th, WPM & HLS Status and Schedule Franz Peters, Georg Gassner.
Design and Fabrication of a Q-BPM Calibration Tone Generator for the ATF2 Ian Bullock August 14, 2008.
Status of the Fermilab Cold BPM R&D Manfred Wendt Fermilab 10/1/20091LCWA09 Main Linac WG.
STATUS of the final PACMAN bench integration PACMAN meeting 11/06/2015 Hélène Mainaud Durand.
1 C. Simon CLIC Instrumentation workshop BPM C. Simon on behalf of the Saclay’s group CLIC Instrumentation workshop 2 nd - 3 rd June.
The Cavity Beam Position Monitor (BPM) Massimo Dal Forno Paolo Craievich, Raffaele De Monte, Thomas Borden, Andrea Borga, Mauro Predonzani, Mario Ferianis,
Midterm Review 28-29/05/2015 Silvia ZORZETTI ESR4.1, WP4 1.
Cavity Beam Position Monitor (BPM) for future linear colliders such as CLIC. N Joshi, S Boogert, A Lyapin, et al. Royal.
880.P20 Winter 2006 Richard Kass 1 The Large Hadron Collider LHC is located at CERN CERN is located near Geneva Part of CERN is in France The LHC collides.
Tomoyuki Sanuki, Daisuke Okamoto, Yosuke Honda, Toshiaki Tauchi TB&SGC meeting.
The beam-based alignment and feedback systems, essential operations of the future colliders, use high resolution Beam Position Monitors (BPM). In the framework.
G5 Beam Instrumentation D. Gassner, E. Pozdeyev 4-09.
Beam Line Layout – Cooling Section There seems to be two options for energy measurement: at the 180 dipole and/or in a diagnostic branch at the end of.
QBPM System Installation Systems –Rack mount chassis –LO and CAL RF cable plant ( need 714Mhz from eels bedroom) –Down mix boxes –DC power cable plant.
Low Energy RHIC e - Cooling Meeting Minutes – 11/19/14 1. Cooling Section Magnets and Power Supplies –Most of power supplies will be from ERL (R. Lambiase).
ESS LLRF and Beam Interaction. ESS RF system From the wall plug to the coupler Controlled over EPICS Connected to the global Machine Protection System.
Low Energy RHIC e - Cooling Meeting Minutes – 11/5/14 1.J. Tuozzolo will schedule a visit to NSLS next week to evaluate available magnets, power supplies,
Integration with LDC & Push-pull impact on LumiCal Wojciech Wierba Institute of Nuclear Physics PAN Cracow, Poland FCAL Workshop, LAL Orsay,
Date 2007/Oct./23 FNAL-GDE-Meeting Global Design Effort 1 Cryomodule Interface Definition (FNAL-GDE-Meeting) N. Ohuchi.
IP BPM’s for ATF2 Vladimir Vogel KEK May30, 2005 Third Mini-Workshop on Nano Project at ATF.
Beam Test status and Plans of the ILC Main LINAC BPM
1 Cold L-Band Cavity BPM: Design Status July 2006 Gennady Romanov Linda Valerio Manfred Wendt Fermilab July 21, 2006.
BPM for FF test (ATF2) Vladimir Vogel KEK 2nd Nano Workshop, KEK, December 12, 2004.
Low Energy RHIC e - Cooling Meeting Minutes – 12/23/ Cooling Section: –LF Solenoids:  At PPM, G. Woods has assigned buyer, SOW will be revised,
Cavity BPM Simulations A. Liapine. Analysis of the Existing BPMs BINP KEK.
Development of a High Resolution Cavity BPM for the CLIC Main Beam
Booster bpm’s Jim Crisp 3/29/06. Plate width and linearity with the response linearized along the axis 60 and 20 degree plates become nonlinear in the.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
Requirements concerning the interface linking the BPM to the quadrupole M. Wendt, S. Zorzetti.
Plug compatibility discussion TILC09 cavity integration session H. Hayano.
1 ATF2 Q-BPM Magnet Movers & 1 st Pulse Calibration Progress from May 7-11 J. May, D. McCormick, T.Smith (SLAC) S. Boogert (RH)
The Cockcroft Institute generic Xband stretched wire system.
INFN- Legnaro National Lab. Activity on ESS DTL Diagnostics: BPM & BCM
Progress report of the tilt monitor Daisuke OKAMOTO Tohoku University.
1CEA/ Saclay/ SACM CARE/SRF/WP11 Development of a new Beam Position Monitor for FLASH, XFEL and ILC Cryomodules Claire Simon, Michel Luong, Stéphane Chel,
WFM electronics Alexandra Andersson. F. Peauger – CTF3 committee – 11/02/10  Wakefield Monitors implemented in two accelerating structures TD24 (tank.
Embedded RF Applications/Systems
Sub-Task HOM-BPM HOM based Beam Position Monitors – Planned and Extant Measurements N. Baboi, DESY, Hamburg EuCARD WP 10: SRF, Annual Review Meeting.
LCLS-II Prototype Cryomodule Darryl Orris 21 January 2015 Final Design Review: Instrumentation.
DAE-Fermilab Collaboration on Instrumentation and Control Gopal Joshi Electronics Division, BARC Visits - Gopal Joshi to Fermilab Manfred Wendt, Peter.
Status of BPMs and Electronics System at KNU.
Re-entrant BPM R&D for ILC Main Linac
CAVITY BPM FOR CALIFES Claire Simon, Michel Luong, D. Bogard, P
Wakefield & Cavity based Monitors: Fermilab BPM Development Plans
SC Quadrupole Magnets in ILC Cryomodules
KNU IP-BPM and Reference cavity
STF Wire Position Monitor
WP1 Metrology & Alignment
12.4: SRF HOM Diagnostics: Experimental Results and Future Plans
    BEAM POSITION MONITORS USING A RE-ENTRANT CAVITY C. Simon1, S. Chel1, M. Luong1, P. Contrepois1, P. Girardot1, N. Baboi2 and N. Rouvière3.
Fabrication of KEK-ATF2 Q-BPM
SNS PPU Cryomodule Instrumentation
Undulator System Components Status Dean Walters
Beam Halo Considerations for Back Angle Running
Breakout Session SC3 – Undulator
SNS PPU Cryomodule Instrumentation
HL-LHC HEL BPM.
Presentation transcript:

Requirements concerning the interface linking the BPM to the quadrupole M. Wendt, S. Zorzetti

BPM Drawings CLIBPMMB0015 2

Monopole cavity and connectors (x2) Dipole cavity and connectors (x4) Flanges To be adapted for the integration Beam pipe Inner diameter =8mm 3

BPM Measurements Monopole Cavity -50Ω termination Dipole Cavity -SMA Adaptors -SMA connectors -SMA Connectors -SMA adaptors -50Ω termination -RF cables 4

BPM Electronics BPM 15 GHz Signal Generator Vector Analyzer ~200MHz Fermilab Downconverter Fermilab PLLs -Signal Generation -Signal Analyzer -Temperature Sensors -Stepper motors controller -Signal generator -LF – Magnet measurements -IF – BPM measurements -Multi purpose pins for oscillation wire analysis 5