Click to edit Master title style TISD activities during LS1 Update from last report 22 Oct 2013 T. Stora.

Slides:



Advertisements
Similar presentations
Filippo Parodi /Paolo Capobianco (Ansaldo Fuel Cells S.p.A.)
Advertisements

1 Unité mixte de recherche CNRS-IN2P3 Université Paris-Sud C. Lau et al., ECOS-EURISOL joint Town Meeting, October 2014  The context.
ISOLDE contribution to task 11 8.Prediction of secondary beam intensities Pierre Delahaye for the ISOLDE collaboration EURISOL DS Task 11 kick-off meeting,
Mechanical and fluidic integration of scintillating microfluidic channels into detector system 1 Davy Brouzet 10 th September 2014.
Tests at HiRadMat of advanced SiC and Al 2 O 3 as model targets for radioisotope beam production Experiment proposal Collaboration: Michal Czapski*, Thierry.
Design on Target and Moderator of X- band Compact Electron Linac Neutron Source for Short Pulsed Neutrons Kazuhiro Tagi.
Radioactive Ion Beam (RIB) Production at ISOLDE by the Laser Ion Source and Trap (LIST) Sven Richter for the LIST-, RILIS- and ISOLDE IS456 Collaborations.
OVERVIEW Material Irradiation Damage Studies at BNL BLIP N. Simos and H. Kirk, BNL K. McDonald, Princeton U N. Mokhov, FNAL (Oct. 20, 2009) (BLIP = Brookhaven.
2 nd Oxford-Princeton High-Powered Target Workshop, Y. KadiNovember 6, EURISOL DS PROJECT Task#2: MULTI-MW TARGET DESIGN Y. Kadi On behalf of the.
EURISOL DS Target Meeting, CERN, CHY.KADIMarch 10-11, EURISOL DS PROJECT Task#2: MULTI-MW TARGET 1st year planning Y. Kadi (AB/ATB) European Organization.
High-Power Density Target Design and Analyses for Accelerator Production of Isotopes W. David Pointer Argonne National Laboratory Nuclear Engineering Division.
Welcome to the CHARMS See – Tea Sunday, October 11, 2015 Release of Light Alkalis (Li, Na, K) From ISOLDE Targets Strahinja Lukić,
8 B at ISOLDE Jochen Ballof | ISOLDE GUI Meeting Investigate the structure of 8B, which is expected to be proton halo in ground state, reaction.
Growth Control of Li 2+x TiO 3+y for an Advanced Tritium Breeding Material The University of Tokyo School of Engineering, Department of Nuclear Engineering.
Ion Beam Analysis of Gold Flecks in a Foam Lattice F E Gauntlett, A S Clough Physics Department, University of Surrey, Guildford, GU2 7XH, UK.
LIEBE project: WP3 – Construction and tests Project coordination meeting – 30/01/ /01/2015 LIEBE project meeting1 M. Delonca on behalf of the WP3.
Advanced semiconductor detectors of neutrons
Mechanical and fluidic integration of scintillating microfluidic channels into detector system 1 Davy Brouzet 10 th September 2014.
Simulations on “Energy plus Transmutation” setup, 1.5 GeV Mitja Majerle
Copyright © 2013 SCKCEN Pb-Bi target for Optimization toward higher yields SCKCEN Mentor : Dr. Lucia-Ana Popescu University Promoter : Prof.
24 January 2001J. Lettry1 ISOLDE Introduction –PSB-beam, Targets –Ion-sources Facility performance –Front-ends and robots –Target production –Safety.
The ISOLDE yield database Measured secondary beams intensities at ISOLDE Pierre Delahaye for the ISOLDE collaboration EURISOL DS Task 11 kick-off meeting,
Radioactive ion beam production at other facilities
04/03/ Stefano Corradetti ActiLab Closing Meeting ActiLab Activities at INFN Stefano Corradetti and Alberto Andrighetto SPES Target Group.
ISOLDE Workshop and Users meeting 2011 Nanostructured Calcium Oxide Targets for the Production of Argon Beams João Pedro Ramos 7 th of December 2011 Dr.
XFEL-INJ1/2 DUMPS Remarks / Requirements, Injector Beam Dynamic Review Meeting, DESY, Mon. 23. October 2006 ‹#› XFEL - INJ 1/2.
16th International Conference on composite Materials July 8-13,2007 Kyoto International Conference Center, Kyoto, Japan Synthesis of 0.95MgTiO CaTiO.
Surface Characterization of 14 N Implanted Targets Abhijit Bisoi Saha Institute of Nuclear Physics 1/AF Bidhannagar, Kolkata-64.
Beam developments during the LS1
Experimental Studies of Spatial Distributions of Neutrons Produced by Set-ups with Thick Lead Target Irradiated by Relativistic Protons Vladimír Wagner.
3rd NoRDHia 1 TITLE INVESTIGATION OF DIAMOND SAMPLES UNDER HIGH DOSES OF ELECTROMAGNETIC IRRADIATION (at S-DALINAC) Wolfgang Lange, DESY Zeuthen.
Measurement of 7 Be(n,  ) and 7 Be(n,p) cross sections for the Cosmological Li problem in Addendum to CERN-INTC /INTC-P-417 Spokepersons:
Target and Ion Source Development
Plasma Processes, Inc. February 5-6, Engineered Tungsten for IFE Dry Chamber Walls HAPL Program Meeting Georgia Institute of Technology Scott O’Dell,
Surface Effects and Retention of Steady State 3 He + Implantation in Single and Polycrystalline Tungsten S.J. Zenobia, G.L. Kulcinski, E. Alderson, G.
Status of Target and Ion Source Group Developments 2013 Christoph Seiffert on behalf of TISD 1.
Prototype target tests with the ISOLDE Tape Station Tania M. Mendonca.
11 IPNO, ActILab kick-off meeting – Contribution CERN ActILab kick-off meeting CERN Contribution Alexander Gottberg.
1 SPIRE Project coordinated by CEA – Contractors : CEA, CIEMAT, CNRS, NRG, ENEA, PSI, KTH, SCK/CEN, FZK « IRRADIATION EFFECTS IN MARTENSITIC STEELS UNDER.
João Pedro RAMOS ISOLDE Workshop 2015 Radioactive beams at ISOLDE: Status and Developments João Pedro RAMOS (CERN/EPFL) On behalf of the ISOLDE Target.
LIEBE: Design of a molten metal target based on a Pb-Bi loop at CERN-ISOLDE 6/25/2014 LIEBE project meeting1 T. De Melo Mendonca, M. Delonca, D. Houngbo,
Antihydrogen Workshop, June , CERN S.N.Gninenko Production of cold positronium S.N. Gninenko INR, Moscow.
Production of radioactive molecular beams Christoph Seiffert CERN-ISOLDE \TU Darmstadt Supported by the Wolfgang Gentner programme.
BENE/EURISOL-DS Joint Meeting, CERN, SwitzerlandFebruary 22, Progress in the Liquid Mercury Multi-MW Target Design Studies Y. Kadi On behalf of.
1 Activation by Medium Energy Beams V. Chetvertkova, E. Mustafin, I. Strasik (GSI, B eschleunigerphysik), L. Latysheva, N. Sobolevskiy (INR RAS), U. Ratzinger.
NPA5, Eilat 7/4/20117/4/2011 Apparatus for intense 8 Li RIB production experiment at SARAF Phase I Tsviki Y. Hirsh 1.
Negative ion sources and Be ionisation studies Tania de Melo Mendonca on behalf of the TISD team EN-STI-RBS.
T. Stora ISCC – Nov 2014 (TISD) Beam developments ‏ Thierry Stora.
3 February 2005, J. Lettry 1 Task #3 100 kW direct targets “Development of targets and ion sources for radionuclide production that can accommodate up.
Development of Cryogenic Moderators Using a Small Proton Accelerator Yoshiaki Kiyanagi*, Fujio Hiraga, Takashi Kamiyama, Akira Homma, Fumiyuki Fujita and.
High Power Target Studies at CERN-ISOLDE Tania M. Mendonca, Melanie Delonca, Veronique Ghetta, Etam Noah, Thierry Stora.
Munib Amin Institute for Laser and Plasma Physics Heinrich Heine University Düsseldorf Laser ion acceleration and applications A bouquet of flowers.
Students'coffee - 16th meeting Nanostructured target materials for intense secondary beam production at CERN-ISOLDE João Pedro Ramos 11 th of March 2013.
High Energy Dump of the Super Proton Synchrotron at CERN – Present and Future designs A. Perillo-Marcone (EN-STI) Contributions from several colleagues.
Three years of cross-section measurements of (n,xn) threshold reactions at TSL Uppsala and NPI Řež O. Svoboda, A. Krása, A. Kugler, M. Majerle, J. Vrzalová,
Comprehensive investigation of the decay losses in the ISOL extraction method KP2 Seminar, Strahinja Lukić.
P1 – GANIL P2 – CNRS/IN2P3 P3 – INFN P4 – CERN P6 – CEA Saclay P7 – NIPNE Bucarest P18 – PSI Switzerland P19 – IPUL Latvia C2 – BINP Novosibirsk C3 – VNIITF.
Lecture at the MEDICIS-PROMED Summer School
Coatings for neutron conversion for n_TOF
Introduction Methods Results Conclusions
Beam developments in 2011 Target and Ion Source Development (TISD) Thierry Stora, EN-STI-RBS With input from many different colleagues.
DITANET Conference, Seville, Spain
Dorothea Schumann, Jörg Neuhausen, Tânia Melo Mendonça, Thierry Stora
A “standard” ISOLDE target: ThO2-184, n-rich Cu
Light Radioactive Beam Production via Two Stage Irradiation Setup
Accelerator R&D for Future Neutrino Projects
FEBIAD ion source development efficiency improvement
1. Introduction Secondary Heavy charged particle (fragment) production
O. Svoboda, A. Krása, A. Kugler, M. Majerle, J. Vrzalová, V. Wagner
Silicon Carbide- Boron Carbide Composites
Presentation transcript:

Click to edit Master title style TISD activities during LS1 Update from last report 22 Oct 2013 T. Stora

Reminder 8B 9C 37K LIEBE (LBE loop) ActILab ENSAR (nanoUCx) Ba beams Neutron converter (RILIS in VADIS) molecular beams

ISOLDE  Diffusion studies of boron in possible target materials  Implantation of 10 B as 10 BF 2 into pressed pills of Al 2 O 3, CNT, MgF 2[1] ;  HV=70kV-80kV SARAF  Characterisation of neutron beam  Implantation of 10 B as 10 BF 2 into Al (200ug/cm2) foil, r coll =1.5mm,  HV=32kV  n BF2 + =4*10^16 B F + F B F + F [1] J. Vacik et al, On Boron diffusion in MgF2, CP1099, Application of Accelerators in Research and Industry: 20 th international Conferene

4 α detector Principle  Irradiation of sample with thermal neutrons:  For diffusion measurements: Pu-Be Source 1.1*10 8 (before moderation )  Neutron capture cross section of 10 B: σ th =3840 barn  Detection of produced 7 Li and α from 10 B(n,α) 7 Li 6%: 7Li (1.015MeV + α (1.777MeV) 94%: 7Li (0.840MeV + α (1.470MeV) +γ(0.478MeV) 10 B+n

Measurement with calibration sample, done with Pu-Be source

 Located near Yavne, Israel  Proton beam (E=1.91MeV) from Soreq Applied Research Accelerator Facility (SARAF) hits liquid lithium target (LiLiT),T ∼ 200◦C  Production of keV neutrons: 7 Li(p,n) 7 Be  Irradiation of 10 B sample with fast neutrons  Coincidence detection of produced 7 Li and α from 10 B(n,α) 7 Li

Click to edit Master title style LIEBE: Liquid Lead Bismuth Eutectic Loop target for Eurisol Validation of the conceptual design of EURISOL direct target by prototyping at Cern-ISOLDE Diffusion: model from Fujioka et al. (NIM 186 (1981) 409) Data: Lettry et al. (NIM B 126 (1997) 170) Motivation: Improvement of yields of short-lived Hg isotopes Diffusion of isotope when the LBE is on droplets shape which require the use of a grid, a diffusion chamber and a pump to recirculate the liquid. Total time till the post acceleration: < 300 ms.

Isolde Front end Development: integration of a liquid loop target, working at high temperature (from 200 deg C up to 600 deg C) in the Cern-Isolde environment. Part 1: main part of the target in his confinement Part 2: pump and engine to recirculate the liquid Ion Source Main LBE loop Heat Exchanger Feeder tank Beam Main part without confinement Proposed layout: Main challenges: High power deposited on target to be evacuated (HEX to dimension at various T) Recirculation of liquid through a compatible LBE pump High temperature of use (up to 600 deg C) Integration in already existing (relatively small) environment Monitoring and control Proposed design

Offline tests: Shower formation, pore size and spacing Model: Shower inside diffusion chamber Grid: 200μ m pore diameter, 300 μ m spacing Grid: 200μ m pore diameter, 1 m m spacing Test stand to investigate shower formation in vacuum Tests ongoing LBE shower in 2014

nanoTiC - motivation nanoTiC after 5 min Fractional activity rise at 1450 o C is attributed to a an oxide layer in the samples at higher sintering temperatures. High Melting point – 3160 o C Sintering studies done, shows that TiC can maintain a submicron structure at least until 1500 o C Operation temperature has to be at least 1500 o C (Ca, K, Sc beams) Release studies Avoid oxidation of TiC Improve nanostructure stability => Essencial for good release TRIUMF shows release of Ca and K from TiC JPR| 1/3

nanoTiC – ongoing studies JPR| 2/3 Powder Suspension Isopropanol Polymeric dispersant Wet mixing Attrition mill Zirconia milling elements Pellet Preparation Drying Deagglomerate Pressing Sintering 1500 o C for 2 and 10h Vacuum Characterizati on Morphology Density Porosity Specific sufrace area TiC Graphite Carbon Nanotubes Carbon Black Study the effect of the different carbon polymorphs Study the volume ratio of carbon How to hinder sintering of TiC? Doping Add (a higher melting point) second phase Lower temperature and time

nanoTiC – results and future studies TiC + Carbon Black TiC + Graphite TiC + Carbon Nanotubes TiC Future work: Release studies Target prototype Modeling JPR| 3/3

UC X prototype target tests for ActILab-ENSAR Characterization of conventional UC X using synchrotron-based micro-beam analysis: Microscopic morphology – buried porosity & chemistryKinetic stabilization by sub-microscopic UC – UC 2 phase competition Grain size of material is smaller than previously estimated; global phase transition observed at 2100 ◦ C Phase competition between UC and α- UC 2 as yet missing explanation of performance and durability of this material A. Gottberg, et al., submitted

UC X prototype target tests for ActILab-ENSAR Release fractions from RaBIT irradiations, ALTO 2013 ISOLDE online tests: Despites major technical difficulties (RFQ, tape station, separator): record yield of 11 Be: 6.0x10 7 /µC, database: 7x10 6 /µC (confirmed) Structure appears to be widely conserved over time and temperature Repeat tests at ISOLDE and at ALTO within ActILab in 2014 Online tests and synthesis of de-novo designed uranium carbide matrixes: Different microstructures, densities, grain sizes, crystal structures tested → tailor-made matrix: Suspension grinding of UO 2 powder to 160 nm average particle size Ultrasound-assisted mixing with multi-walled carbon nanotubes Pressing to 1.6 g/cm 3 pellets Optimized reactive sintering to mixed uranium carbide inside carbon nanotube matrix 30 Na beam intensity evolution Ch. Lau, et al., in preparation A. Gottberg et al. submitted

UC X Post-Irradiation Studies for ActILab-ENSAR Post-irradiation analysis: First analysis of an irradiated UC X target in the history of ISOLDE (important to understand ageing processes and for upcoming waste campaign) Opening target unit #466 (8.8∙10 18 protons in 2011) in inert-gas hot-cell at PSI, 19 mSv/h on contact with Ta beam window 2µm before irradiationafter irradiation Pellets appear macroscopically unchanged Microscopic evolution of pore distribution and grain size under irradiation observable 500 µSv/h on contact with single pellet Results of synchrotron investigations under analysis Ceramography and electron micro- probe analysis scheduled for April Perform full suite of investigations on nano UC

Proton-to-Neutron Converter Prototype current design proton fluence (p/cm 2 /µC) neutron fluence (n/cm 2 /µC) Operated in October 2012 R. Luis et al., European Physics Journal A, 48 (2012) 90 A. Gottberg et al. submitted to Nucl. Instr. Meth. B (2014) ISOLDE compatible geometry optimization max high-energy neutrons min proton in UC x

Proton-to-Neutron Converter Prototype Online Tests Strong suppression of contaminations compared to conventional converter confirmed (10 4 for 80 Rb) Experimental ratio of n-rich species to contamination improved (200 for 80 Zn/ 80 Rb) Poor extraction efficiencies due to low operational temperatures (caused by structural failure) A. Gottberg et al. submitted to Nucl. Instr. Meth. B (2014)

Click to edit Master title style 18  Beam Energy: 500 MeV;  Beam Intensity: 100μA;  FWHM: 3mm;  Particles per second: E14;  UCx density: 3.63g/cm3

Click to edit Master title style 19

Click to edit Master title style 20

Click to edit Master title style 21

22 Work in IPNO: Use LaCx as chemical homologue to UCx La 2 O 3 is very hygroscopic and quicly turns into in La(OH) 3 Choice to start with graphite and La(OH) 3 : lanthanum hydroxide stable in the air strong degassing during sintering = porosity  Synthesis of lanthanum carbide pellets Smaller beads produce: Finer powder Larger pores Smaller beads produce: Finer powder Larger pores Precursor powder Grinding Pressing Characterisations He pycnometry SEM XRD Hg porosimetry Sintering

23 o Reactions during sintering: (I) (II) La 2 O C → 2 LaC C + 3 CO  La(OH) 3 → La 2 O 3 + 3H 2 O  (I) (II) Choice of new outgassing program reduces the dwell time at high temperature limit sintering responsible for the decrease of the porosity limit the change in the microstructure (grain growth...) Choice of new outgassing program reduces the dwell time at high temperature limit sintering responsible for the decrease of the porosity limit the change in the microstructure (grain growth...) AIMS: Reducing grain size Improving homogeneity in shape and grain size AIMS: Reducing grain size Improving homogeneity in shape and grain size o Grinding with planetary mill : ISOLDE experience with nanoUCx shall be translated to LaCx. Milled powders would allow to produce smaller grains by two orders of magnitude. Smaller grains together with carbon nanotubes can be engineered for better preservation of microstrure at high temperature. Having small grains of the target increases the efficiency of diffusion of the isotope out of the target material. This program can be used to manufacture LaC 2 targets.

FLUKA simulations of the production of Ba isotopes from LaC 2 targets at ISOLDE LaC 2 is a better candidate than UC 2 o Choice of LaC2 for the production of i.e. neutron-deficient Barium beams o Purchase of material: Start with La(OH)3 : lanthanum hydroxide stable in the air grinding in isopropanol strong degassing during sintering = porosity  Start with carbon nanotubes : Size Thermostability Diffusion Grinding equipment (Jar+Beads) in Tungten Cabide: high density high hardness and high abrasion resistance high melting point (2900°C> work temperature ~ 2000°C) 24 neutron-deficient isotopes of Ba (Cs, Xe, etc.) isotopes LaC 2 shows higher production cross-sections thanUCx For Ba with A<120 the production decreases rapidly and good extraction efficiencies are necessary for decent isotope beams

25 Thank you !! Hungry ?