PS1 PORDIG Meeting, Nov 21 2008 ● Observatory, Telescope, and Instrument Software (OTIS) ● Remote Operations ● Survey Efficiency ● Scheduler and Simulated.

Slides:



Advertisements
Similar presentations
CMSC 2006 Orlando Active Alignment System for the LSST William J. Gressler LSST Project National Optical Astronomy Observatory (NOAO) Scott Sandwith New.
Advertisements

A new Network Concept for transporting and storing digital video…………
Aloha Observatory Design Cabled Observatory Presentation School of Ocean and Earth Science and Technology February 2006.
Multi-DNC Data Collection/Monitoring
Stoimen Stoimenov QA Engineer SitefinityLeads, SitefinityTeam6 Telerik QA Academy Telerik QA Academy.
Supervision of Production Computers in ALICE Peter Chochula for the ALICE DCS team.
Network Management Overview IACT 918 July 2004 Gene Awyzio SITACS University of Wollongong.
HAWCPol / SuperHAWC Software & Operations J. Dotson July 28, 2007.
Chapter 13 Embedded Systems
PALM-3000 PALM-3000 Software Requirements Review Thang Trinh PALM-3000 Requirements Review, Caltech Campus November 12, 2007.
Observing efficiency for NGAO 1.Definitions 2.Lessons learned a)Keck LGS AO “efficiency” b)Keck AO brute conclusion 3.Observing efficiency budget 4. Observing.
Performance Evaluation of a Multi-Threaded Distributed Telerobotic Framework Mayez Al-Mouhamed, Onur Toker, and Asif Iqbal College of Computer Science.
SONG – Stellar Observations Network Group - The robotic software for the SONG network S.Frandsen 1, Eric Weiss 1, J. Skottfelt 2, M.F. Andersen 1, F.Grundahl.
NGAO topical discussion: Observing Efficiency and Uptime Budgets Telecon Meeting 12/7 D. Le Mignant and E. Johansson 7 Dec Attendees; R. Campbell,
1 Chapter 13 Embedded Systems Embedded Systems Characteristics of Embedded Operating Systems.
Slide 3-1 Copyright © 2004 Pearson Education, Inc. Operating Systems: A Modern Perspective, Chapter 3 Operating System Organization.
System Integration Management (SIM)
 Network Management  Network Administrators Jobs  Reasons for using Network Management Systems  Analysing Network Data  Points that must be taken.
A Primer on Image Acquisition and Data Reduction Using TheSky6, CCDSoft V5 and Microsoft Excel Thomas C. Smith Dark Ridge Observatory (DRO)
Slide 1 of 9 Presenting 24x7 Scheduler The art of computer automation Press PageDown key or click to advance.
Network File System (NFS) in AIX System COSC513 Operation Systems Instructor: Prof. Anvari Yuan Ma SID:
0 Deterministic Replay for Real- time Software Systems Alice Lee Safety, Reliability & Quality Assurance Office JSC, NASA Yann-Hang.
These materials are prepared only for the students enrolled in the course Distributed Software Development (DSD) at the Department of Computer.
J. Large Binocular Telescope (LBT) Operational Readiness
LSST Scheduler status Francisco Delgado Sr. Software Engineer Telescope & Site.
Basic concepts of radio interferometric (VLBI) observations Hiroshi Imai Department of Physics and Astronomy Graduate School of Science and Engineering.
Data management in the field Ari Haukijärvi 2nd EHES training seminar.
ISG We build general capability Introduction to Olympus Shawn T. Brown, PhD ISG MISSION 2.0 Lead Director of Public Health Applications Pittsburgh Supercomputing.
Test and Operation of AST3 (Survey Control and Data System) Zhaohui Shang Tianjin Normal University National Astronomical Observatories, CAS On behalf.
50mm Telescope ACS Course Garching, 15 th to 19 th January 2007 January 2007Garching.
SuperSleuth Wise. Marketing and Sales Presentation/Training.  Complete video surveillance system in the palm of your hand.  Proven video motion Detection.
G Amaldi Meeting 2015, Gwangju, South Korea1 Status of LIGO June 22, 2015 Daniel Sigg LIGO Hanford Observatory (on behalf of the LIGO Scientific.
Chapter 1 Introduction to Databases. 1-2 Chapter Outline   Common uses of database systems   Meaning of basic terms   Database Applications  
DISTRIBUTED COMPUTING. Computing? Computing is usually defined as the activity of using and improving computer technology, computer hardware and software.
LSST Scheduler construction plan Francisco Delgado Sr. Software Engineer Telescope & Site.
02/09/2010 Industrial Project Course (234313) Virtualization-aware database engine Final Presentation Industrial Project Course (234313) Virtualization-aware.
Teleworking in research networks and remote laboratories Kaunas University of Technology Lithuania Rimantas Šeinauskas.
1 The slides in this collection are all related and should be useful in preparing a presentation on SIM PlanetQuest. Note, however, that there is some.
SDD/DFS H. Lorch & M. Kiekebusch VLT 2 nd Generation Instrumentation Pipelines, 18 Apr Henning Lorch & Mario Kiekebusch et. al. The CLIP.
Process Architecture Process Architecture - A portion of a program that can run independently of and concurrently with other portions of the program. Some.
Pan-STARRS PS1 Published Science Products Subsystem Presentation to the PS1 Science Council August 1, 2007.
ADASS the Planning and Scheduling Perspective Roadmap: - How planning and scheduling fits in at ADASS - ADASS planning and scheduling posters and presentations.
Final Version Kequan Luu May 13-17, 2002 Micro-Arcsecond Imaging Mission, Pathfinder (MAXIM-PF) Flight Software.
EPICS Release 3.15 Bob Dalesio May 19, Features for 3.15 Support for large arrays Channel access priorities Portable server replacement of rsrv.
ISG We build general capability Introduction to Olympus Shawn T. Brown, PhD ISG MISSION 2.0 Lead Director of Public Health Applications Pittsburgh Supercomputing.
1. 2 Purpose of This Presentation ◆ To explain how spacecraft can be virtualized by using a standard modeling method; ◆ To introduce the basic concept.
Mountaintop Software for the Dark Energy Camera Jon Thaler 1, T. Abbott 2, I. Karliner 1, T. Qian 1, K. Honscheid 3, W. Merritt 4, L. Buckley-Geer 4 1.
By Nitin Bahadur Gokul Nadathur Department of Computer Sciences University of Wisconsin-Madison Spring 2000.
T EST T OOLS U NIT VI This unit contains the overview of the test tools. Also prerequisites for applying these tools, tools selection and implementation.
Systems and User Interface Software. Types of Operating System  Single User  Multi User  Multi-tasking  Batch Processing  Interactive  Real Time.
INTRODUCTION TO XSEDE. INTRODUCTION  Extreme Science and Engineering Discovery Environment (XSEDE)  “most advanced, powerful, and robust collection.
T. Axelrod, NASA Asteroid Grand Challenge, Houston, Oct 1, 2013 Improving NEO Discovery Efficiency With Citizen Science Tim Axelrod LSST EPO Scientist.
Artificial Intelligence In Power System Author Doshi Pratik H.Darakh Bharat P.
Robo-AO: Demo Period Nicholas Law.
From LSE-30: Observatory System Spec.
LSST Commissioning Overview and Data Plan Charles (Chuck) Claver Beth Willman LSST System Scientist LSST Deputy Director SAC Meeting.
Requirements Basis Requirements of an Image Visualization System (IVS), to support the verification of the correct functioning of some components under.
OpSim4 vs OpSim3 Francisco Delgado
SOCS/Scheduler Development Plan Michael Reuter, Fransicso Delgado
ATTRACT TWD Symposium, Barcelona, Spain, 1st July 2016
NASA Ames Research Center
OCS Scheduler Status Francisco Delgado T&S Software Manager
Real-time Software Design
Chapter 16: Distributed System Structures
Supporting Fault-Tolerance in Streaming Grid Applications
OCS Scheduler Status Francisco Delgado T&S Software Manager
MONSOON Software Design & Status
MONSOON Software Design & Status
NGAO topical discussion: Observing Efficiency and Uptime Budgets
Presentation transcript:

PS1 PORDIG Meeting, Nov ● Observatory, Telescope, and Instrument Software (OTIS) ● Remote Operations ● Survey Efficiency ● Scheduler and Simulated Design Reference Mission

PS1 PORDIG Meeting, Nov Observatory, Telescope, & Instrument Software - OTIS The PS1 System Gigapixel Camera PS1 Telescope Image Processing Pipeline - IPP Published Science Producs System - PSPS Moving Object Processing System - MOPS PS1 Science Consortium Members Science Analysis Servers Solar System Community raw images photons commands and feedback metadata detectionsstatic sky images detections detections, metadata orbits identifications static sky images reduced data products detections, metadata

PS1 PORDIG Meeting, Nov Observatory, Telescope, and Instrument Software (OTIS) ● Collection of software tools for – GUI point & click remote control of PS1 observations – Configurable speech synthesis for audible alerts – Maintaining a configurable collimation model – Maintaining a configurable focus model – Fitting a mount model – Monitoring external and internal environment – Logging commands and sensor data in database – Tool for querying and plotting metadata in database – Queue execution of observations – Tools for scheduling the Design Reference Mission – Tools for simulating the Design Reference Mission ● Approximately a quarter of a million lines of Java code, plus ancillary items.

PS1 PORDIG Meeting, Nov OTIS Status ● Extensive use of OTIS at the summit for control of the Observatory, Telescope, GPC Camera, and other instrumentation. ● Regular remote use of OTIS from a variety of remote sites. Only difference between remote and summit operations is network connectivity. ● Modest testing of network connectivity from ATRC to summit. ● Lots of minor issues and irritations to be resolved ● Functionality is currently sufficient for trained Observers to carry out the remote observations necessary for the PS1 Design Reference Mission (as distinguished from remote operations including catastrophic failure modes)

PS1 PORDIG Meeting, Nov Outstanding issues for Remote Operations: ● Remote start-of-night/end-of-night capability – Dome Azimuth drive (warming procedure or mitigated) – Dome leaks sealed, so no water on ring wall – Dome vent 3 fixed ● Faults that require trip to the summit – Camera shutter reset (extremely rare) – Dome Azimuth Master Drive fault (rare) – Dome Azimuth Limit switch (Az drives not warm, mitigate mechanically or thermally) ● GPC Camera – demonstrated self protection software – Not protected against all possible network failures – Warm up – 24 hours, pump and cool – Helium Compressor – not on UPS, most on MK are not. Power failure means Camera pump-down, loss of observing time.

PS1 PORDIG Meeting, Nov Outstanding Issues for Remote Operations, Con’t ● Functionality/procedures for “catastrophic” failures – Summit Power failure: ● Have dome shutter and vents on UPS. ● Need RPS for TCC Computer (RPS to power down and boot) – Network failure (link to summit) ● Phone line modem to otis computers needs work and procedures – Major Mechanical Failure (e.g. Main Dome Shutter) ● Need tarps to cover telescope/camera and procedure for doing so.

PS1 PORDIG Meeting, Nov Outstanding Issues for Remote Operations, Con’t ●Multiple catastrophic failures: –Mechanical Failure & Power Failure ●Need altitude break switch on UPS so telescope can be moved by hand for Mechanical Failure Procedure –Power Failure and Network Failure ●Same as Power and Network Failure independently –Communication and Mechanical Failure ●Same as Mechanical Failure alone

PS1 PORDIG Meeting, Nov Outstanding Issues for Remote Operations, Con’t ● Spares for single point failure – Air Compressor – Spare Telescope Computer and cards – Spare Dome Computer and cards

PS1 PORDIG Meeting, Nov Surveying Efficiency Sept 14 to Nov 19, 2008 ● Science Time (science time)/(clear time) 22.6% ● Engineering Time (engineering time)/(clear time) 45.3 % ● Downtime (downtime)/(clear time) – Telescope 0.6 % – OTIS 2.6 % – Camera 1.2 % – Unaccounted (Idle or head scratching) 27.7 % % ● System Reliability 95.6% ● Weather (percent closed due to bad weather) 17.7 % ● Note: during fall used a lot of time with cirrus ● 3 yr average bad weather time ~25% ● Observing Efficiency (Science Observations) – (exposure time)/(science clear time) 59.7%

PS1 PORDIG Meeting, Nov Current and future observing overheads ● Time spent focusing in Nov ~ 5%. Hope to reduce this to near zero using science image psf ellipticity ● Camera overhead as per Sidik and Erik: Now Soon OTIS-cam network comm? Guide star lists? ??? Camserv processes guide list Clean Setting up video threads (ssh, launching commands) integration time shutter blade moving. (now at t=42.1) video overrun and shutter comms. delay (*) video script overhead (waiting to collect thread status) expose script or shutter driver overhead before readsave starts readsave startup script overhead detector limited 2.0 usec/pix readout with overscan additional overscan for row-by-row bias correction controller memory clearing, etc network transfer and some readsave script overhead clean moved to end (and started during 0.9 sec of network overhead) additional readsave script overhead ==== ==== total overhead (any length exposure time.) (*) Assuming we change the way we talk to the shutter overhead on a 30s exposure = 47% camera efficiency 13.2 overhead on a 30s exposure = 69% camera efficiency Note: We are currently slewing as soon as shutter closes (during read) so these gains would only be realized for slews less than 13.2 sec.

PS1 PORDIG Meeting, Nov Scheduler ● A simulation of 3.5 year PS1 Mission was done for the Design Reference Mission with the “python” scheduler, a modified version of the LSST cadence simulator. ● The Otis Scheduler is based on a direct implementation of the PS1 Survey Strategy, together with a high fidelity predictive model of the PS1 telescope and camera, and relies on the Survey Strategy plus visibility constraints to present choices interactively to the Observer. ● When run non-interactively it serves as a simulator of the PS1 Mission. It can access either the real Otis database or a simulated database. ● The Otis scheduler is much better at achieving survey completeness, the TTI cadence, and reducing idle time than the “python” scheduler. However at present when run robotically the pairwise and triplet cadencing is unsatisfactory. ● Outstanding robotic scheduler issues include moon avoidance at opposition near full moon in the 3pi i-band survey, completeness in g- band, and achieving TTI pairs and triplets with high completeness.

PS1 PORDIG Meeting, Nov pi Survey y band – 1 yr completeness (sim7)

PS1 PORDIG Meeting, Nov pi Survey z band 1 yr completeness – (sim7)

PS1 PORDIG Meeting, Nov pi Survey i band 1 yr completeness – Sim7

PS1 PORDIG Meeting, Nov pi Survey r band 1 yr completeness (sim7)

PS1 PORDIG Meeting, Nov pi Survey g band 1 yr completeness (sim7)

PS1 PORDIG Meeting, Nov OTIS Scheduler – Robotic Simulation of 1yr of DRM PS1 Surveys Percent Percent of survey of survey completed completed (otis, sim7) (DRM_v3) – 3pi Steradian 96% 89% – Medium Deep Fields 89% * 32% – Solar System “Sweet Spot” 92% 110% – Deep Survey of M31 49% 32% – Stellar Transit Survey 97% 32% – Total Completeness 94.3% 74.9% – Percent of clear time idle 5.7% 25.1%

PS1 PORDIG Meeting, Nov OTIS Scheduler – Simulation of 1yr of DRM otis python PS1 Surveys Percent sim7 DRM_v3 allocated distribution distribution – 3pi Steradian 58% 60.4% 62.3% – Medium Deep Fields 25% 29.1% 12.5% – Solar System “Sweet Spot” 5% 5.4% 9.6% – Deep Survey of M31 2% 1.0% 0.6% – Stellar Transit Survey 4% 3.9% 2.0% – Discretionary 6% 0.2% 0.0%

PS1 PORDIG Meeting, Nov