GRID 11-12-00Zhen Xie, INFN-Pisa, on DataGrid WP6 meeting1 Globus Installation Toolkit Zhen Xie On behalf of grid-release team INFN-Pisa.

Slides:



Advertisements
Similar presentations
INFN & Globus activities Massimo Sgaravatto INFN Padova.
Advertisements

WP 1 (Globus) Status Report Massimo Sgaravatto INFN Padova for the INFN Globus group
4 th DataGRID Project Conference, Paris, 5 March 2002 Testbed Software Test Plan I. Mandjavidze on behalf of L. Bobelin – CS SI; F.Etienne, E. Fede – CPPM;
05/11/2001 CPT week Natalia Ratnikova, FNAL 1 Software Distribution in CMS Distribution unitFormContent Version of SCRAM managed project.
CERN LCG Overview & Scaling challenges David Smith For LCG Deployment Group CERN HEPiX 2003, Vancouver.
Andrew McNab - EDG Access Control - 14 Jan 2003 EU DataGrid security with GSI and Globus Andrew McNab University of Manchester
CMS HLT production using Grid tools Flavia Donno (INFN Pisa) Claudio Grandi (INFN Bologna) Ivano Lippi (INFN Padova) Francesco Prelz (INFN Milano) Andrea.
1 Software & Grid Middleware for Tier 2 Centers Rob Gardner Indiana University DOE/NSF Review of U.S. ATLAS and CMS Computing Projects Brookhaven National.
GRID workload management system and CMS fall production Massimo Sgaravatto INFN Padova.
Status of Globus activities within INFN Massimo Sgaravatto INFN Padova for the INFN Globus group
Workload Management Workpackage Massimo Sgaravatto INFN Padova.
Globus activities within INFN Massimo Sgaravatto INFN Padova for the INFN Globus group
INFN-GRID Globus evaluation Massimo Sgaravatto INFN Padova for the INFN Globus group
27-29 September 2002CrossGrid Workshop LINZ1 USE CASES (Task 3.5 Test and Integration) Santiago González de la Hoz CrossGrid Workshop at Linz,
Report on the INFN-GRID Globus evaluation Massimo Sgaravatto INFN Padova for the INFN Globus group
GRID Workload Management System Massimo Sgaravatto INFN Padova.
Globus activities within INFN Massimo Sgaravatto INFN Padova for the INFN Globus group
Workload Management Massimo Sgaravatto INFN Padova.
Status of Globus activities within INFN (update) Massimo Sgaravatto INFN Padova for the INFN Globus group
Evaluation of the Globus GRAM Service Massimo Sgaravatto INFN Padova.
Integration of DataGrid Software for Testbed 1 Goal: combine the DataGrid middleware and the Globus core services. Phases: Preparation for Integration.
DATAGRID Testbed release 0 Organization and working model F.Etienne, A.Ghiselli CNRS/IN2P3 – Marseille, INFN-CNAF Bologna DATAGRID Conference, 7-9 March.
Andrew McNab - Manchester HEP - 26 June 2001 WG-H / Support status Packaging / RPM’s UK + EU DG CA’s central grid-users file grid “ping”
INFN-GRID Globus evaluation (WP 1) Massimo Sgaravatto INFN Padova for the INFN Globus group
5 November 2001F Harris GridPP Edinburgh 1 WP8 status for validating Testbed1 and middleware F Harris(LHCb/Oxford)
Workload Management WP Status and next steps Massimo Sgaravatto INFN Padova.
C. Loomis – Testbed Status – 28/01/2002 – n° 1 Future WP6 Tasks Charles Loomis January 28, 2002
Andrew McNab - Manchester HEP - 5 July 2001 WP6/Testbed Status Status by partner –CNRS, Czech R., INFN, NIKHEF, NorduGrid, LIP, Russia, UK Security Integration.
October, Scientific Linux INFN/Trieste B.Gobbo – Compass R.Gomezel - T.Macorini - L.Strizzolo INFN - Trieste.
 To explain the importance of software configuration management (CM)  To describe key CM activities namely CM planning, change management, version management.
GRID The GRID distribution toolkit at INFN Flavia Donno (INFN Pisa) Andrea Sciaba` (INFN Pisa) Zhen Xie (INFN Pisa) presented by Massimo Sgaravatto (INFN.
DATAGRID ConferenceTestbed0 - resources in Italy Luciano Gaido 1 DATAGRID WP6 Testbed0 resources in Italy Amsterdam March,
EGEE is a project funded by the European Union under contract IST Testing processes Leanne Guy Testing activity manager JRA1 All hands meeting,
Grid Workload Management & Condor Massimo Sgaravatto INFN Padova.
DataGrid WP6 CA meeting, CERN, 12 December 2002 IISAS Certification Authority Jan Astalos Department of Parallel and Distributed Computing Institute of.
Grid Status - PPDG / Magda / pacman Torre Wenaus BNL U.S. ATLAS Physics and Computing Advisory Panel Review Argonne National Laboratory Oct 30, 2001.
11 December 2000 Paolo Capiluppi - DataGrid Testbed Workshop CMS Applications Requirements DataGrid Testbed Workshop Milano, 11 December 2000 Paolo Capiluppi,
Grid Workload Management Massimo Sgaravatto INFN Padova.
C. Loomis – Integration Status- October 31, n° 1 Integration Status October 31, 2001
LHCb planning for DataGRID testbed0 Eric van Herwijnen Thursday, 10 may 2001.
05/29/2002Flavia Donno, INFN-Pisa1 Packaging and distribution issues Flavia Donno, INFN-Pisa EDG/WP8 EDT/WP4 joint meeting, 29 May 2002.
First attempt for validating/testing Testbed 1 Globus and middleware services WP6 Meeting, December 2001 Flavia Donno, Marco Serra for IT and WPs.
Software repository replication using the ASIS Local Copy Manager IT/DIS/OSE, CERN ASIS Team Presented by: German Cancio
DataGRID WPMM, Geneve, 17th June 2002 Testbed Software Test Group work status for 1.2 release Andrea Formica on behalf of Test Group.
Preparation for Integration Organized access to the code WP6 infrastructure (MDS-2, RC, …) Input from WPs on requirements,... Acquire experience with Globus.
DATAGRID Testbed Work Package (report) F.Etienne, A.Ghiselli CNRS/IN2P3 – Marseille, INFN-CNAF Bologna DATAGRID Conference, 7-9 March 2001 Amsterdam.
10 May 2001DataGrid WP6 Meeting, CERN1 GRID The GRID Installation Toolkit A brief report F. Donno INFN - Pisa.
DataGRID PTB, Geneve, 10 April 2002 Testbed Software Test Plan Status Laurent Bobelin on behalf of Test Group.
Andrew McNab - Manchester HEP - 17 September 2002 UK Testbed Deployment Aim of this talk is to the answer the questions: –“How much of the Testbed has.
CERN IT Department t LHCb Software Distribution Roberto Santinelli CERN IT/GS.
Enabling Grids for E-sciencE Software installation and setup Viet Tran Institute of Informatics Slovakia.
Report on the INFN-GRID Globus evaluation Massimo Sgaravatto INFN Padova for the INFN Globus group
GRID The GRID distribution toolkit at INFN Flavia Donno (INFN Pisa) Andrea Sciaba` (INFN Pisa) Zhen Xie (INFN Pisa) presented by Massimo Sgaravatto (INFN.
Andrew McNab - Globus Distribution for Testbed 1 Globus Distribution for Testbed 1 Andrew McNab, University of Manchester
15-Feb-02Steve Traylen, RAL WP6 Test Bed Report1 RAL/UK WP6 Test Bed Report Steve Traylen, WP6 PPGRID/RAL, UK
Status of Globus activities Massimo Sgaravatto INFN Padova for the INFN Globus group
Grid Workload Management (WP 1) Massimo Sgaravatto INFN Padova.
1 Comments to SPI. 2 General remarks Impressed by progress since last review Widespread adoption by experiments and projects Savannah, ExtSoft Build system.
Grid Status - PPDG / Magda / pacman Torre Wenaus BNL DOE/NSF Review of US LHC Software and Computing Fermilab Nov 29, 2001.
Feedback from CMS Andrew Lahiff STFC Rutherford Appleton Laboratory Contributions from Christoph Wissing, Bockjoo Kim, Alessandro Degano CernVM Users Workshop.
Tests at Saclay D. Calvet, A. Formica, Z. Georgette, I. Mandjavidze, P. Micout DAPNIA/SEDI, CEA Saclay Gif-sur-Yvette Cedex.
Andrew McNab - Globus Distribution for Testbed 1 Status of the Globus Distribution for Testbed 1 Andrew McNab, University of Manchester
JRA1 Meeting – 09/02/ Software Configuration Management and Integration EGEE is proposed as a project funded by the European Union under contract.
CERN 1 DataGrid Architecture Group Bob Jones CERN.
Maite Barroso – WP4 Workshop – 10/12/ n° 1 -WP4 Workshop- Developers’ Guide Maite Barroso 10/12/2002
Workload Management Workpackage
Testbed Software Test Plan Status
Leanne Guy EGEE JRA1 Test Team Manager
Installation toolkit and deployment of Globus in Pisa
Module 01 ETICS Overview ETICS Online Tutorials
Presentation transcript:

GRID Zhen Xie, INFN-Pisa, on DataGrid WP6 meeting1 Globus Installation Toolkit Zhen Xie On behalf of grid-release team INFN-Pisa

GRID Zhen Xie, INFN-Pisa, on DataGrid WP6 meeting2 Overview Goal Design and implementation Features and evaluation of the current release Features forseen for the next release Documentations Report from U.S. by F.Donno currently working with Globus repackaging taskforce Open questions for the community

GRID Zhen Xie, INFN-Pisa, on DataGrid WP6 meeting3 Goal Reduce time and manpower for installation and configuration of Globus Automize and Standardize the installation of the Globus Toolkit and related packages Automize the Globus setup procedure Collect and apply bug fixes that are not included in the current version of Globus

GRID Zhen Xie, INFN-Pisa, on DataGrid WP6 meeting4 Design and implementation We distribute the precompiled Globus and related packages together with tools for automatic installation and configuration. The toolkit includes two major scripts written in bash: one for installation and the other for the system configuration. Modularized design makes standard and specific installation and configuration separate.

GRID Zhen Xie, INFN-Pisa, on DataGrid WP6 meeting5 Features of the Current Release INFNGRID1.2 Automatic installation and configuration of precompiled Globus and related grid packages New Bug fixes provided by INFN&Globus team are included Support setup both with INFN CA and Globus CA Support INFN GIS architecture Support CONDOR,LSF and PBS as job scheduler Include installation instructions for special enviroments (configuration of client machines, shared install-directory)

GRID Zhen Xie, INFN-Pisa, on DataGrid WP6 meeting6 ============================= (1) modify system files and reactivate the inetd daemon (2) change owner to root of certain files for tighter security (3) modify system wide login files (4) start/restart Globus now (5) configure gsi-wuftpd and restart the inetd daemon (6) configure gdmp and start the gdmp_server ============================= (q) Quit (h) Help ============================= ================================= (1) Copy INFNGRID tar files from /afs/infn.it/project/infngrid/1.2/Linux to download dir (2) Decompress and untar INFNGRID distribution files in install dir (3) Configure INFNGRID software (4) Globus Setup (5) Configure GRAM services (6) Globus local deploy (7) GIIS Configuration (8) GDMP Installation ================================= (q) Quit (h) Help ================================= Installation script menu System setup script menu CMS specific INFN specific

GRID Zhen Xie, INFN-Pisa, on DataGrid WP6 meeting7 Evaluation of the Current Release Tested at several INFN sites, CERN and FNAL, ITEP Tested on RH Linux 6.1, Sun Solaris 2.6 Tested for the INFN setup (at INFN sites) and the standard setup (at other sites) Reduce complexity and manpower for installation and configuration (5min vs.~1h) Problem with machine with alias (we plan to solve it soon)

GRID Zhen Xie, INFN-Pisa, on DataGrid WP6 meeting8 Documentations Contact address: On-line manual: Download site: /afs/infn.it/project/infngrid (please read manual before downloading) URL: should be open to all users very soon Registration required for downloading.

GRID Zhen Xie, INFN-Pisa, on DataGrid WP6 meeting9 Features forseen for the next release INFNGRID1.3 Fixes for Globus jobmanager memory leaks Fix to support the -publish-user option in the globus_services.conf Support for Solaris 7 Full support for GDMP v1.1 with the latest patches Distribution of various Globus flavored compilations (Kerberos,AFS,MPICH) Distribution of the INFN CA Certificate Revocation List and grid-mapfile management tools

GRID Zhen Xie, INFN-Pisa, on DataGrid WP6 meeting10 Report by F.Donno from U.S.(1) Globus is forseen to be divided into small packages each of which rebuildable by standard code management tools. (Project to be approved) A tool for automatic installation and service configuration is NOT forseen by Globus. The INFN Globus installation toolkit is important for providing configuration and service definition to the Globus repackaging project.

GRID Zhen Xie, INFN-Pisa, on DataGrid WP6 meeting11 Report by F.Donno from U.S.(2) The INFN toolkit remains independent from the Globus project but could be accepted by Globus as an official tool of installation and autoconfiguration of Globus. If the Globus repackaging project will be approved, future release of INFNGRID will be built on the new structure of Globus. Well organised testbeds for the test of Globus and compilation of software on different platforms are welcome.

GRID Zhen Xie, INFN-Pisa, on DataGrid WP6 meeting12 Open questions for the community Should a working frame be defined for the code development? Define common rules for build, for using compilers and libraries…. Should we have a limitation of platforms for the EU testbeds? Token passing problems with jobmanager installed on AFS… Exchange patches with other institutes…