NLC - The Next Linear Collider Project James T Volk May 2002 Report to MAC on Magnets James T Volk Fermilab May 10, 2002.

Slides:



Advertisements
Similar presentations
Ramesh Gupta, BNL D1 Dipole Design / IR Magnet Study LARP Collaboration Meeting, Oct 5-6, D1 Dipole Design Task (terminated in 2005) IR Magnet Study.
Advertisements

The best collimator configuration (material, number of collimators, collimator shape) is determined by minimizing the ratio R, where N ae is the number.
Magnets for the ESRF upgrade phase II
NLC - The Next Linear Collider Project Keith Jobe May 1999 Damping Ring Kicker Development.
Yurii Levashov Undula t or fiducialization test Oct. 14, 2004 Undulator Fiducialization Test Results Fiducialization Tolerances.
NLC - The Next Linear Collider Project Andy Ringwall 1/9/00 ME 217 NLC Magnet Project Andy Ringwall, SLAC, Liaison Jeff Rifkin, SLAC, Liaison Shun Takai,
NLC - The Next Linear Collider Project Andy Ringwall 11/11/99 NLC Magnets Permanent Magnet Options Bill Fowler, FNAL Andy Ringwall, SLAC.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
EM vs. PM Quads Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center Undulator.
Resistive & Permanent Magnets for Accelerators J. G. Weisend II National Superconducting Cyclotron Lab Michigan State University.
Hybrid QD0 Studies M. Modena CERN Acknowledgments: CERN TE-MSC CLIC Magnets Study Team: A.Aloev, E. Solodko, P.Thonet, A.Vorozhtsov “CLIC/ILC QD0” Meeting.
BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnetic Specifications and Tolerances Weiming Guo, NSLS-II Project In this presentation I briefly introduced the.
BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnet Design Workshop: Magnet Design and Analysis Charles Spataro, NSLS-II Project NSLS-II is a new 3Gev synchrotron.
19 Nov 08,ILC08Cherrill Spencer Rotating Coil System Description 1 Short description of the SLAC rotating coil system used to measure the CIEMAT-made prototype.
INTRODUCTION to the DESIGN and FABRICATION of IRON- DOMINATED ACCELERATOR MAGNETS Cherrill Spencer, Magnet Engineer HOMEWORK PROBLEM for Lecture # 2 of.
ATF2 Magnets Summary of the Session on Magnets, Movers and Magnet Installation. ATF2 5 th Project Meeting, at KEK Cherrill Spencer, Magnet Designer and.
RFQ Thermal Analysis Scott Lawrie. Vacuum Pump Flange Vacuum Flange Coolant Manifold Cooling Pockets Milled Into Vanes Potentially Bolted Together Tuner.
Yichao Jing 11/11/2010. Outline Introduction Linear lattice design and basic parameters Combined function magnets study and feasibility Nonlinear dynamics.
Gek 16/6/041 ITRP Comments on Question 19 GEK 9/06/04 19) For the X-band (warm) technology, detail the status of the tests of the full rf delivery system.
ATF2 Magnets ATF2 Magnets KEK, 19 Dec 2006Cherrill Spencer, SLAC ATF2 Mag Design & Production 1 Design and Production Status of New ATF2 Magnets Cherrill.
Options for Final Focusing Quadrupoles Michele Modena CERN TE-MSC Many thanks for the contributions of: J. Garcia Perez, H. Gerwig, C. Lopez, C. Petrone,
Status of: CLIC Two-Beam Module Magnets R&D and Procurement 1 Michele Modena, CERN TE-MSC IWLC10, WG8, 21October 2010.
ATF2 Magnets ATF2 Magnets 11Mar '08, Weekly MtgCherrill Spencer Status Report ATF2 FD quads 1 Status Report on the ATF2 “Final Doublet” quads being made.
1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnet and Girder Integration Lewis Doom, NSLS-II Project National Synchrotron Light Source II (NSLS-II) will.
NLC - The Next Linear Collider Project James T Volk May 2002 Report to MAC on Magnets James T Volk Fermilab May 11, 2002 LBNL Jose Alonso, Jin-Young Jung.
NLC MAC Meeting 6-8 Nov Linac Girder Studies and Plans C. Boffo Slide 1 Linac Girder Studies and Plans C. Boffo – E. Borissov – H. Carter Fermilab,
Permanent Magnet Quadrupoles for the CLIC Drive Beam Jim Clarke, Norbert Collomb, Neil Marks, James Richmond, and Ben Shepherd STFC Daresbury Laboratory,
ASTeC Report for CLIC-UK Jim Clarke on behalf of all ASTeC & Technology Department staff contributing to CLIC-UK STFC Daresbury Laboratory, UK CERN-UK.
Lecture 5 Jack Tanabe Old Dominion University Hampton, VA January 2011 [1] Halbach, K., FIRST ORDER PERTURBATION EFFECTS IN IRON-DOMINATED TWO- DIMENSIONAL.
F James T Volk June Permanent Magnets for Linear Colliders James T Volk Fermilab.
ATF2 Magnets ATF2 Magnets 22 May 2007Cherrill Spencer, SLAC. Progress on New ATF2 Magnets 1 Progress Report on ATF2 New Magnets 22 nd May 2007 Cherrill.
ATF2 Magnets ATF2 Magnets 27/28 Feb 2007Cherrill Spencer, SLAC. Info for QC3 machining discussion 1 Information for discussion about how to enlarge the.
NLC - The Next Linear Collider Project Oct 01 MAC James T Volk October 2001 MAC meeting Magnet Systems for the NLC James T Volk October 26, 2001.
Optimization of Field Error Tolerances for Triplet Quadrupoles of the HL-LHC Lattice V3.01 Option 4444 Yuri Nosochkov Y. Cai, M-H. Wang (SLAC) S. Fartoukh,
ATF2Quad Fab & Measurement Status Cherrill Spencer 02/28/06 1 Brief Status Report on Fabrication & Measurement of ATF2 Quads and Spencer’s Trip to IHEP,
ATF2 Magnets Results of the Field Measurements of three ATF2 DEA Dipoles by Single Stretched Wire and Hall Probe at IHEP over past 2 months: updated report.
NLC - The Next Linear Collider Project NLC January Video conference Status of Permanent Quadrupoles James T Volk January 18, 2001.
Frequency Map Analysis Workshop 4/2/2004 Peter Kuske Refinements of the non-linear lattice model for the BESSY storage ring P. Kuske Linear Lattice My.
NLC - The Next Linear Collider Project Status of Magnet R&D Nov. 7 th 2002 James T Volk Fermilab James T Volk 11/07/2002.
November 19, 2008 SLAC Linear Collider Department Slide 1 ILC Superconducting Quadrupole Characterization J. C. Sheppard, Cherrill Spencer, et al. SLAC.
Cyclotrons Chapter 3 RF modelisation and computation B modelisation and computation Beam transport computation 1.
Cherrill Spencer, SLAC. MDI Workshop Jan '05 1 Impact of Crossing Angle Value on Magnets near the IP Overview of several unusual quadrupole designs that.
CLIC Stabilisation Day’08 18 th March 2008 Thomas Zickler AT/MCS/MNC/tz 1 CLIC Quadrupoles Th. Zickler CERN.
Drive Beam Quadrupoles Jim Clarke, Norbert Collomb, Ben Shepherd, Graham Stokes STFC Daresbury Laboratory, UK Antonio Bartalesi, Michele Modena, and Mike.
ATF2 Magnets ATF2 Magnets 26May'08, NanobeamsMtg Cherrill Spencer Status Report ATF2 FD Magnets 1 Status Report on the ATF2 “Final Doublet” magnets: 2.
Artwork: S. Kimball. The CLIC Drive Beam The drive beam decelerates from 2.4 GeV to 0.24 GeV transferring energy to the main beam As the electrons decelerate,
ATF2 Magnets ATF2 Magnets 14 Sep 2007Cherrill Spencer, SLAC. Cooling Solid Wire Sextupoles 1 Report of the effort to cool an old FFTB solid wire sextupole.
NLC - The Next Linear Collider Project James T Volk 10/03/2001 Report on Magnet Group Status May 7 th 2002 J Volk, C Spencer, B Parker.
F James T Volk Arpil Permanent Magnets for Linear Colliders James T Volk Fermilab.
Practical aspects of small aperture quadrupoles Dr Ben Leigh Tesla Engineering Ltd.
CERN –GSI/CEA MM preparation meeting, Magnetic Measurements WP.
Superconducting Cryogen Free Splittable Quadrupole for Linear Accelerators Progress Report V. Kashikhin for the FNAL Superconducting Magnet Team (presented.
Tutorial On Fiducialization Of Accelerator Magnets And Undulators
A new QF1 magnet for ATF3 Alexey Vorozhtsov
Cherrill Spencer, SLAC Member of ATF2 Magnet Team
High Gradient Magnet Design for SPring-8 Upgrade Plan
May 18, 2000 Stanford University Manufacturing Modeling Lab Shun Takai
Warm magnets for LHeC / Test Facility arcs
Cherrill Spencer, SLAC Member of ATF2 Magnet Team
PROGRESS REPORT OF A NLNS-FFAG ADS MAGNET
Arc magnet designs Attilio Milanese 13 Oct. 2016
Status of ATF2 FD Magnets and Info on their FFTB supports & mover
CHEN, Fusan KANG, Wen November 5, 2017
Magnets for the ESRF upgrade phase II
CLIC Workshop 2016, CERN 20th January 2016
Pierre-Alexandre Thonet
Compact and Low Consumption Magnet Design The DESY Experience
PERMANENT MAGNET QUADRUPOLE FOR THE LINAC 4 CCDTL
CEPC Collider Magnets CHEN, Fusan November 13, 2018.
Electron Collider Ring Magnets Preliminary Summary
Presentation transcript:

NLC - The Next Linear Collider Project James T Volk May 2002 Report to MAC on Magnets James T Volk Fermilab May 10, 2002

NLC - The Next Linear Collider Project Participants SLAC Seung Rhee, Cherrill Spencer, Jim Spencer SLAC Magnetic Measurement Group Scott Anderson, Zack Wolf Fermilab Magnetic Measurement Joe DiMarco James T Volk May 2002 LBNL Jose Alonso, Jin-Young Jung

NLC - The Next Linear Collider Project Recommendations from Oct ‘01 MAC Implement proposed upgrade of stability measurement systems Perform estimate on radiation damage tolerances allowed by NLC spec for each permanent magnet design Consider reducing the number of alternative designs Some effort should be devoted to determining if vibrations from LCW can be maintained with in specifications When a PM design meets NLC specs has been identified its cost for construction, installation and operation should be compared to an EM James T Volk May 2002

NLC - The Next Linear Collider Project Implement proposed upgrade of stability Measurement Systems Due to budget cap there is no money to upgrade the Fermilab system at this time SLAC has moved the rotating coil system to a small room from the high bay of the light assembly building. Improved temperature and humidity control Both SLAC and FNAL systems are adequate for current needs May 2002 James T Volk

NLC - The Next Linear Collider Project Perform estimate on radiation damage tolerances allowed by NLC spec for each PM design Still gathering information on expected radiation levels in Main LINAC and Damping Rings. Old Measurements from SLC and damping rings inconsistent due to assumptions and calculations So these data are little use to NLC. Have been doing measurements in SLC damping ring distinguish different types of particles Radiation levels do vary by orders of magnitudes and types depending on location. Need to get better models. Different types of radiation have different effects on Permanent Magnets. James T Volk May 2002

NLC - The Next Linear Collider Project Radiation Damage Issues SM Cobalt more resistant than ND-Iron –SM Cobalt more expensive –Has longer lived activation products –ND-Iron dependent on manufacturing process –And brick geometry Still need more investigation –Both literature –Do Computer modeling (FLUKA) –Network with other groups engaged in this type of work –And Experiments –Need to test actual magnets with real beams James T Volk May 2002

NLC - The Next Linear Collider Project Radiation-Induced Demagnetization (Japanese experience with 200 MeV protons) Material Type has large impact Red: N48 High Br (1.4T) Low Hc (1.15 MA/m) Blue:N32ZLower Br (1.14 T) Higher Hc (2.5 MA/m) Material Shape has large impact (All samples are discs 10 mm dia) Circle: thickness = 2 mm (Pc = 0.5) Triangle: thickness = 4 mm (Pc = 1.0) Square: thickness = 7 mm (Pc = 2.0) - Higher Permeance coefficient increases resistance (x 10) SmCo is much more resistant than NdFeB May 2002 James T Volk

NLC - The Next Linear Collider Project Have Radiation Test Dipole Design PM Material May 2002 James T Volk 2 inch gap

NLC - The Next Linear Collider Project Radiation Damage Testing First dipole is in FNAL shop expect to build 5-10 dipoles to test various aspects of magnets aging, different radiation fields, different manufacturers Have in hand 100 Hitachi ND-Iron magnets to start tests Have a space at FNAL LINAC to expose dipoles to 400 MeV neutrons and protons Need to find other sources of particles Looking for help from University groups –An Ideal project for a small group! James T Volk May 2002

NLC - The Next Linear Collider Project Aging Data From Dexter James T Volk May 2002

NLC - The Next Linear Collider Project Consider Reducing the Number of Alternative Designs Corner tuner has been eliminated Work on the sliding shunt and counter rotating quads has stopped due to budget cap New rod tuning mechanism for wedge tuner has been built center stability is encouraging Computer models of Wedge and Ring Quad are proceeding There is still time to explore models before the CDR is finalized in ‘04 James T Volk May 2002

NLC - The Next Linear Collider Project Wedge Quad Rod Turning Mechanism Tuning Rod May 2002 James T Volk Pin slides in slot turning rod

NLC - The Next Linear Collider Project Photo of the Wedge Quad on the SLAC measuring set-up. Wedge magnet, secured to V block Rotating coil read-out Tuning rods rotation mechanism. One rod only connected. Smaller gear wheel turned with wrench. Aluminum V block, secured to granite table Cooling fan for readout stand Heidenhain 0.5µm indicator May 2002 James T Volk

NLC - The Next Linear Collider Project FNAL SSW Measurements of Wedge Quad James T Volk May 2002

NLC - The Next Linear Collider Project SLAC Rotating Coil Data May 2002 James T Volk

NLC - The Next Linear Collider Project Finding Tuning Rod Minimum

NLC - The Next Linear Collider Project PM quad: centers measured repeatedly overnight on SLAC rotating coil set-up Even though room temp. which determines the Al block and magnet temp. is very constant (~0.1 °C), the Y center varies by > 1 µm and is ~ correlated with the Al block temp. X center varies <1 µm and is not correlated with Al Block temperature. James T Volk May 2002

NLC - The Next Linear Collider Project PM Wedge quad overnight in SLAC rotating coil setup measuring strength Strength of the PM quad measured repeatedly during ~18 hours. Various parts of apparatus and magnet have their temperatures measured at same time. Room has tightly controlled air temperature, nevertheless parts change temp by fractions of 1 °C. Quad is thermally compensated, else strength would change much more with temp. Slope of RH plot indicates integrated strength changes by T per °C James T Volk May 2002

NLC - The Next Linear Collider Project Studies Using Pandira James T Volk May 2002 f

NLC - The Next Linear Collider Project Further Tests Using rotating coil to find true minimum value for each rod Make new rods so we can attach potentiometers and get angle read out of rods Re-work wedge quad to allow for tuning of pole strength May 2002 James T Volk

NLC - The Next Linear Collider Project New data on the electromagnetic quad with improved magnetic measuring set-up. The SLAC rotating coil measuring set-up has been improved: a 5kW electric direct immersion water heater with an SCR controller has been put in the incoming cooling water circuit. Variations of ~ 4°C in LCW temp reduced to +/- 0.1 °C. Above plots show water temperatures during a 2.5 day run at 80 amps. James T Volk May 2002

NLC - The Next Linear Collider Project Electromagnet LINAC quad magnetic center measurements during 2.5 day run X and Y centers measured with improved rotating coil setup, each data point took 8 mins. X varies by < 1µm. Y has unexpected increase of ~3 µm over 10 hr period. Y values very sensitive to various apparatus temperatures, typically the magnet core steel. James T Volk May 2002

NLC - The Next Linear Collider Project Electromagnetic quad data from 2.5 day run at 80 amps constant Magnet steel core temp tracks incoming LCW temp. Y center correlates with magnet steel temp, but in this run does not explain 3 µm increase in Y. Have not found culprit, e.g. see no correlation with (very stable) magnet current. Suspect Y has NOT really moved but our set-up created that illusion. Will continue to understand/improve set-up. James T Volk May 2002

NLC - The Next Linear Collider Project Determining if Vibrations from LCW can be Maintained with in Specifications Andrei Seryi has plots more in his Saturday Talk James T Volk May 2002

NLC - The Next Linear Collider Project PM vs EM cost for Construction, Installation and Operation SLAC and Stanford engineering school working methodologies for cost estimation and reliability calculations. Still plenty of time between now ‘04 to explore and refine designs James T Volk May 2002

NLC - The Next Linear Collider Project Developing Methodologies to Estimate Overall Magnet Costs- including repair costs Use real failure data of magnets from similar accelerator to predict how often there will be failures of the magnets in the NLC. Estimate for a particular failure scenario how much it will cost to fix the failure– accounting for all aspects of the repair and the lost opportunity costs (for those failures happening during operations, when the accelerator is un-useable– have to ascribe an opportunity cost per hour). For real failure data: took all the magnet failures that brought down any beamline in SLAC during 5 year period. Using downtime reporting database we scrutinized every one of 75 failures as to its cause, type of magnet, length of time to detect and repair. Calculated number of SLAC magnets running during any period and how many hours they ran to calculate mean time between failures. Calculate availability values and extrapolate them to known number of NLC magnets running for 30 years. Estimate cost to fix all failures. James T Volk May 2002

NLC - The Next Linear Collider Project SLAC Downtime (Avg) SmallMediumLarge Magnet Size Number of Failures Small Non-Water Cooled MediumLarge Magnet Size Occurrence SLAC Downtime SmallMediumLarge Magnet Size Hours Magnet Failures at SLAC: Jan. 97 – Dec Downtime (hr) James T Volk May 2002

NLC - The Next Linear Collider Project Failure Frequency InsulationWater LeakWater Blockage Human Error ConnectorOther Failure Type Events InsulationWater LeakWater Blockage Human ErrorConnectorOther Failure Type Downtime (hr) SLAC Downtime by Failure Type James T Volk May 2002

NLC - The Next Linear Collider Project Water Cooled Magnets (Med & Large) Failures James T Volk May 2002

NLC - The Next Linear Collider Project Water Cooled Magnet Problems James T Volk May 2002

NLC - The Next Linear Collider Project LBNL & SLAC work on designing magnets (PMs and EMs) for the damping rings Main Damping Ring lattices have been published with detailed requirements on all magnets Have 2-D model of DR quadrupoles and transport line dipoles. The Nd Iron style magnets are of reasonable size Investigated the Nd Iron quads, with rotating rods to generate the +/-10% adjustability, in more detail to see if they could meet all the requirements. Jin-Young Jung (LBNL) used TOSCA to make a 3-D model of damping ring magnets Validated the new 3-D model of the Neo quad by simulating it as an infinitely long magnet similar to the PANDIRA code. Poletip fields predicted by the 2 codes agreed to within 0.2%, so TOSCA model good. James T Volk May 2002

NLC - The Next Linear Collider Project Results from 3-D model of PM DR quad DR magnets have to have a “C” shape – allow for the extra wide vacuum chamber to extend towards the outer edge of the ring and be –capable of accepting the high amounts of synchrotron radiation. The TOSCA 3-D model of a 2cm radius Neo quad was run with a 25 cm effective length. The poletip field was 10% less than in the 2-D PANDIRA model. –Decrease due to flux loss –End Plates do not help reduce this James T Volk May 2002

NLC - The Next Linear Collider Project TOSCA model of ¼ Neo quad with a steel end plate James T Volk May 2002

NLC - The Next Linear Collider Project NLC DR quad as an electromagnet:TOSCA model POISSON 2-D model was made of an electromagnet with same steel poletip shape as the pm. It satisfied the DR quad requirements. To allay concerns about the size of fringe field out of the end faces a 3-D TOSCA model was made. The coils were carefully modeled in 8 sections to look exactly like the real ones would.The model universe included air out to where the gradient dipole would be => fringe field < 2 gauss James T Volk May 2002

NLC - The Next Linear Collider Project NLC DR Gradient Dipole: TOSCA design. Studying end effects and fringe fields To allay concerns about the size of fringe field out of the end faces a 3-D TOSCA model was made. The coils were carefully modeled to look exactly like the real ones would.The model universe included air out to where the nearest quad would be => fringe field < 3 gauss TBD: calculate the multipole harmonics in 3D and check field quality is met. James T Volk May 2002

NLC - The Next Linear Collider Project Final Focus Magnet James T Volk May 2002

NLC - The Next Linear Collider Project Final Focus Magnet James T Volk May 2002

NLC - The Next Linear Collider Project Conclusions Slow but steady progress being made on LINAC quads We are quantifying the radiation fields in the Main Linac and Damping Rings First tests of radiation hardness are underway more ready to begin Working on Cost estimates and failure mode analysis Working on magnets for Damping Rings Looking at magnets for final focus May 2002 James T Volk