1 Project Analysis and Evaluation UNIT 10 – Project Analysis and Evaluation.

Slides:



Advertisements
Similar presentations
Conducting the Community Analysis. What is a Community Analysis?  Includes market research and broader analysis of community assets and challenges 
Advertisements

Mise-en-scene from French mettre – “to place, put” refers to the visual arrangement of items on screen BUT, mise-en-scene also takes into account how those.
Chapter 20 print advertisements Section 20.1 Elements of Advertising
Mentor’s Guideposts An Online Mentor’s Guide to eLearning.
Section 1 – Manual Graphics
Choice of Color Part 4 U.S. Department of the Interior Bureau of Land Management June 2007.
Setting: The Background of Place, Objects, and Culture in Stories
Lesson Twelve Integrated Concepts Language Arts: descriptive language, setting, narrative writing, oral language Social Studies: environment, seasons.
Commercial Building Project Portfolio
Educational Research: Competencies for Analysis and Application, 9 th edition. Gay, Mills, & Airasian © 2009 Pearson Education, Inc. All rights reserved.
Agency Staff report on the Creation of a: (Andy Lanier – DLCD, Laurel Hillmann – OPRD)
RECALL When was photography invented?
Goodsprings Field Office October 30 th  250 “Small” (250ft tall) wind towers  Total height including blades approx. 350ft  Associated Facilities.
Proposed Amendment to the Yuma Field Office Resource Management Plan Public Scoping Meetings Monday, April 18, 2011, 6 – 8 p.m. Yuma BLM Field Office 2555.
Designing Pages and Screens Comm Arts II Mr. Wreford.
Auditing A Risk-Based Approach To Conducting A Quality Audit
Fact-Finding Fact-Finding Overview
ACCIDENT INVESTIGATION
Creating Research proposal. What is a Marketing or Business Research Proposal? “A plan that offers ideas for conducting research”. “A marketing research.
Choice of Color Part 4 U.S. Department of the Interior Bureau of Land Management May 2006.
Website Design. Designing and creating different elements involved in developing a website for e- commerce can help you identify and describe the components.
WAWERU HANNAH NYAKIO B02/53847/2012. PERSPECTIVE DRAWING  Perspective drawing is a drawing technique used to illustrate dimension through a flat surface.
Environmental Impact Assessment Prepared by: Miss Syazwani Mahmad Puzi School of Bioprocess Engineering UniMAP.
What If I Must Go Beyond a Preliminary Assessment? (the example of a USAID EA under Reg. 216) [DATE][SPEAKERS NAMES]
Copyright © 2012 Pearson Education, Inc. publishing as Prentice HallChapter Visual Communication.
Introduction to Interactive Media 02. The Interactive Media Development Process.
Basics of OHSAS Occupational Health & Safety Management System
Design is about problem solving Or creating solutions…
Table Mountain Wind Proposal Jean Field Office. Project Information Proponent: Table Mountain Wind Co., LLC Project Specifics: ROW grant to use BLM administered.
Design is about problem solving Or creating solutions…
Unit 15B Class Project Class Project. Objective Using the tools, techniques, and practices covered so far, work in an ID team setting to evaluate a project.
What If I Have to Go Beyond an IEE?. EA Training Course Tellus Institute 2 Environmental Assessments (EAs) & Programmatic Environmental Assessments (PEAs)
Composition defined 1. constituents: the way in which something is made, especially in terms of its different parts 2. arrangement: the way in which the.
Design FRAME problem solving with the engineering design process F R A M E TEXAS TECH UNIVERSITY T-STEM Center © 2009 Texas Tech University T-STEM Center.
Visual Resource Management May 2015 Lander, Wyoming.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
Proper Site Selection Part 2 U.S. Department of the Interior Bureau of Land Management May 2006.
1 Thank you for visiting our site and welcome to the “Introduction to ISO 22000” Presentation that you requested. For more information.
Art Analysis and Criticism When evaluating a work of art, it is always important to make a thorough inventory of the various characteristics and ideas.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
Course Wrap Up UNIT 16. Overall Course Objective Having participated in the course, you should be able to: Describe the basic principles and concepts.
The purpose of photography is to take a photograph interesting enough that other people want to see it.
Building Simulation Model In this lecture, we are interested in whether a simulation model is accurate representation of the real system. We are interested.
Implementation and follow up Critically important but relatively neglected stages of EIA process Surveillance, monitoring, auditing, evaluation and other.
Mitigation and Impact management
Mount Buller Geography Unit 3 Fieldwork 2010 Format of the SAC A written and media booklet is developed in and out of class over the next 3 weeks. This.
Famous Works of Art SOLs: See how much you’re learning? AI.3 The student will produce works of art that demonstrate the experimental application.
A Guide for Management. Overview Benefits of entity-level controls Nature of entity-level controls Types of entity-level controls, control objectives,
UNIT 13 – Monitoring & Compliance Monitoring and Compliance UNIT 13.
Enriched Art III & AP Positive versus Negative Space and the Figure/Ground Relationship.
Quick Quiz 1. What are the 5 parts of the camera? 2. The ____________ controls how long light is allowed to enter. The ____________ the number the _____________.
UNIT 13 – Monitoring & Compliance Monitoring and Compliance UNIT 13.
Introduction Part 1 U.S. Department of the Interior Bureau of Land Management May 2006.
Tortilla Flats Substation and Power Line September 28, 2007.
Design and Layout (part two)
Text Features: What You Should Know About Texts. Human beings have important elements in their bodies such as a heart, lungs, blood vessels, and a brain.
V 2.1 Version 2.1 School-wide PBIS Tiered Fidelity Inventory.
Conserving Significance Introduction to the process of Identifying Values and Assessing Significance Historic Landscape Project.
Section 20.1 Elements of Advertising Chapter 20 print advertisements Section 20.2 Advertising Layout.
IGCSE Art & Design: Fine Art Mock Exam
Model Lesson 3 The Effects of the Great Depression.
Improving Instruction for Students with Severe Disabilities William Sharpton Richard Hall University of New Orleans.
LOW COST SAFETY IMPROVEMENTS Practitioner Workshop The Tools – Identification of High Crash Locations – Session #2.
What If I Have to Go Beyond an IEE?. EA Training Course 2 Environmental Assessments (EAs) & Programmatic Environmental Assessments (PEAs) How Do I Prepare.
Landscape Photography
Design and Layout (part two)
Commercial Building Project Portfolio
LEAN IMPLEMENTATION Training SUMMARY OF RESULTS
Principles and Elements of design
Dr. Susan Codone Mercer University
Presentation transcript:

1 Project Analysis and Evaluation UNIT 10 – Project Analysis and Evaluation

2 Objective A nalyze a project proposal using the visual contrast rating system to determine the elements of a project that are inconsistent with VRM objectives and recommend measures to improve the visual quality of that project UNIT 10 – Project Analysis and Evaluation

3 Contrast Rating Page 38 A systematic process we use to identify, describe and analyze potential visual impacts of proposed projects and activities UNIT 10 – Project Analysis and Evaluation

4 Visual Contrast Rating Systematic process mandated by Bureau policy Helps identify where and how the greatest visual contrast occur in a project and how these can be mitigated Assists Bureau personnel not formally trained in the design arts to apply basic principles of design to resolve visual impacts UNIT 10 – Project Analysis and Evaluation

5 Basic Philosophy The degree to which a development adversely affects the visual quality of a landscape is directly related to the amount of visual contrast between it and the existing landscape character UNIT 10 – Project Analysis and Evaluation

6 Visual Contrast Rating The amount of contrast is measured by separating the landscape into major features: (land/water, vegetation, structures) then predicting the magnitude of contrast in each of the landscape character elements: FORM – LINE – COLOR - TEXTURE UNIT 10 – Project Analysis and Evaluation

7 Analytical Format UNIT 10 – Project Analysis and Evaluation Handout – Contrast

8 Analytical Format Quickly reveals elements & features that cause the greatest visual impact A guide to methods to reduce the visual impact of a proposed project or activity Provides basis for design that reflects and responds to the setting UNIT 10 – Project Analysis and Evaluation

9 Visual Contrast Rating Not a pass – fail exercise. We want an “A” Every attempt is made to reduce visual impacts even if the proposed project meets VRM Management Objectives for the area UNIT 10 – Project Analysis and Evaluation

10 Steps - Contrast Rating Process 1.Obtain a complete project description 2.Identify VRM Objectives from RMP 3.Assess project visibility - Select Key Observation point(s) 4.Prepare visual representation/simulation 5.Complete Contrast Rating UNIT 10 – Project Analysis and Evaluation

11 Step 1 – Obtain Detailed Project Description Emphasize early contact with project proponent Coach proponent on project design Proposal must be comprehensive Materials? Scale? Colors/Reflectivity? Lights? Temp structures/seasonal use? UNIT 10 – Project Analysis and Evaluation

12 Step 2 - Identify VRM Class From RMP UNIT 10 – Project Analysis and Evaluation

13 Step 3 – Assess Project Visibility Viewshed Analysis Section/Line of sight analysis Site and area reconnaissance UNIT 10 – Project Analysis and Evaluation Key Observation Point – A critical viewpoint or place from which we analyze the visual impact of a Proposed Project

14 Typical Project KOPs Scenic Overlooks, Rivers & Roads Important Vantage Points Places from which a proposed project is seen by large numbers of viewers (representative) or critical viewers Views From Communities or Subdivisions Point where view of proposed project is most revealing (careful to avoid bias in analysis) UNIT 8 – Project Analysis and Evaluation

15 KOP Considerations RMP direction, IDT input Distance Angle of observation # of Viewers Length of time project is in view Relative project size Season of use Light conditions & other factors as appropriate UNIT 10 – Project Analysis and Evaluation

16 Rock Quarry – low angle UNIT – Project Analysis and Evaluation

17 Rock Quarry – high angle UNIT 8 – Project Analysis and Evaluation

18 Rock Quarry - foreground UNIT 10 – Project Analysis and Evaluation

19 Rock Quarry - Background UNIT 10 – Project Analysis and Evaluation

20 Seasonal considerations UNIT 10 – Project Analysis and Evaluation

21 Step 4 – Prepare Visual Simulations Helps to understand the project Helps to understand the visual impact Great way to illustrate impacts in EA Seeing an image of the project is much more powerful than trying to imagine it Helps eliminate bias Allows all team members to see the project the same UNIT 10 – Project Analysis and Evaluation

22 Tools for Visual Simulations Take site photos and sketch in project Take photos of similar facility/project Line of sight/section view diagram Engineering drawings Wire frame or height/mass representations Photoshop or other photo-realistic tools **First approach or tool may lead you to use another UNIT 10 – Project Analysis and Evaluation

23 Penstock/pump station site UNIT 10 – Project Analysis and Evaluation

24 Quick paintshop line drawing UNIT 10 – Project Analysis and Evaluation

25 Built project UNIT 10 – Project Analysis and Evaluation

26 Color option/mitigation UNIT 10 – Project Analysis and Evaluation

27 Step 5 – Complete Contrast Rating See Bureau Manual Handbook H (Note the Illustrations and appendices) –Tips/techniques: Use IDT and mentor in field If possible, take a recon trip first to familiarize yourself with directions, setting and light conditions at different times of day GPS and photograph the locations you conduct the analysis from Cover elements on worksheet – can use different format or record observations on tape recorder UNIT 10 – Project Analysis and Evaluation

28

29 Let’s Walk Through an Example What is the first step in the process? UNIT 10 – Project Analysis and Evaluation

30 Obtain Complete Project Description UNIT 10 – Project Analysis and Evaluation

31 Review established VRM objectives UNIT 10 – Project Analysis and Evaluation

32 Select KOP(s) UNIT 10 – Project Analysis and Evaluation

33 Prepare Visual Simulation Photo of proposed project site UNIT 10 – Project Analysis and Evaluation

34 Simulation of Proposed Project UNIT 10 – Project Analysis and Evaluation

35 Complete Contrast Rating Section A of Form UNIT 10 – Project Analysis and Evaluation

36 Section B of Contrast Rating Form Characteristic Landscape Description UNIT 10 – Project Analysis and Evaluation

37 Section C of Contrast Rating Form Proposed Activity Description UNIT 10 – Project Analysis and Evaluation

38 Section D of Contrast Rating form Consider mitigation measures as you id contrast: What are strong elements in the project setting? What are strong elements in the project? What can you borrow from the setting? What can you change in the setting? What can you change in the project: make it fit in setting (color, form, texture, scale…) move it

39 Section D – Reverse Side of form UNIT 10 – Project Analysis and Evaluation

40 Contrast Rating form – Mitigating Measures UNIT 10 – Project Analysis and Evaluation

41 Simulation of Project with Mitigation UNIT 10 – Project Analysis and Evaluation

42 Review of VRM Class Objectives Class I Preserve the existing character of the landscape. Manage for natural ecological changes Change Allowed: Very Low Activities must not attract attention UNIT 10 – Project Analysis and Evaluation

43 Review of VRM Class Objectives Class II Retain the existing character of the landscape Change allowed: Low Activities may be visible but should not attract attention of the casual observer UNIT 10 – Project Analysis and Evaluation

44 Review of VRM Class Objectives Class III Partially retain the existing character of the landscape Change allowed: Moderate Activities may attract attention but should not dominate the view of the casual observer UNIT 10 – Project Analysis and Evaluation

45 Review of VRM Class Objectives Class IV Provide for management activities which require major modification of the existing character of the landscape Change allowed: High Activities may attract attention, may dominate the view, but are still mitigated UNIT 10 – Project Analysis and Evaluation