Neighbours’ Meeting 29 th September 2015. Introductions  David Hopman – Manager Assets and Operations  Kevin Godfrey – Treatment Plant Supervisor.

Slides:



Advertisements
Similar presentations
Wastewater Treatment.
Advertisements

Masterton District Council Homebush Wastewater Treatment Plant Neighbours Meeting 29 September 2014.
HURRICANE SANDY PASSAIC VALLEY SEWAGE COMMISSION AIR MONITORING PROJECT JEFF MEYER NORTHERN REGIONAL OFFICE AIR COMPLIANCE AND ENFORCEMENT.
LEACHATE MANAGEMENT AND TREATMENT
Sewage and Effluent Treatment 2-4 November 2002 Seán Moran -The first few slides.
EPA CONSTRUCTION & DEVELOPMENT EFFLUENT LIMITATIONS GUIDELINES Tim Ryan, P.E. Water Resources Engineer Water Resources Engineer Wisconsin Department of.
Landfill Water Quality Project Paul Brooks, Lea Bullard, Leslie Harper, Amanda Strickland, Sarah van Schagen April 30, 2004 University of North Carolina.
Prepared by WMC Consulting Engineers Inc. John A. Wengell.
Cost Effective Municipal ~ Commercial ~ Industrial ~ Residential Wastewater Treatment Solutions 1 Acti-Zyme.
 Carry both sewage and storm water.  During average rainfalls the volume of water is 5-15 times greater than normal.  Sewage treatment plants are not.
TEXAS COMMISSION on ENVIRONMENTAL QUALITY. PROPOSED STUCTURE FOR CHAPTER 217 < Subchapter A Administrative Provisions < Subchapter B Design Bases < Subchapter.
Energy Efficient Design Low Cost State Loan Low-Impact Construction Novato Sanitary District Wastewater Facilities Upgrade Presenter: Beverly James, Manager-Engineer.
Environment Engineering I
On-Site Leachate Management RM of Tache Pilot Study.
Agricultural BMPs An Educator’s Guide. What are Agricultural BMPs? Best Management Practices An approach to help farmers reduce or eliminate agricultural.
Fluctuation in Rainfall Variance in rainfall in Singapore.
PINEY POINT Water Management Plan FY04/05.
DEPARTMENT OF HUMAN SETTLEMENTS- SANITATION INPUTS ON NATIONAL WASTE MANAGEMENT STRATEGY 29 MAY 2012 By Mandisa Mangqalaza.
Masterton: Waste-to-energy concepts. Oxidation ponds Background Ruamahanga River.
Feasibility Study of Constructed Wetlands for Wastewater Treatment and Wildlife Habitat Luna County, NM Public Meeting November 10, :00 am Presented.
Characteristics of Wetlands  Must have Hydrophytes Hydrophytes Soils that are saturated, flooded or ponded long enough to develop anaerobic conditions.Soils.
 UAB Vilniaus waters - the largest water company in Lithuania, which operates not only in the city of Vilnius, but also the district, Svencionys and.
Water Conservation Measures in Green Building By Sijia Cao.
Nutrient Inventory and Storage and Handling (Planner Training) John W. Worley.
Ruataniwha Water Scheme HB Today Public Meeting 6 August 2015 HBRIC is a subsidiary (CCO) of Hawke’s Bay Regional Council H AWKE’S B AY R EGIONAL I NVESTMENT.
Preview of the Draft River Basin Management Plan SERBD Advisory Council September 2008.
Animal Agriculture and Water Resources in Texas Ned Meister Director of Commodity and Regulatory Activities Texas Farm Bureau Steel Maloney Principal Hydrologist.
Armidale Dumaresq Council Sewerage Treatment Plant Located 63 Cafferies Rd 3km on the Waterfall Way.
OMSAP Public Meeting September 1999 Update on the Boston Harbor Project n In 1999, the $3.7 billion construction project is nearly complete, occupying.
Bio-remediation for Selenium Making it Work for Agriculture.
NATURAL WASTEWATER TREATMENT  Pollutant removal by minimal energy utilisation and chemicals  Usage of natural processes (natural resources)  Low cost.
S.F. Bay Area Biosolids How Much are We Talking About? Presented By: Jim Sandoval, CH2M HILL June 2, 2008 BACWA Biosolids Workshop Photo By:
Nebraska CNMP Educational Program Records for NPDES Permit.
Former Point Cook Fire Training Area Contamination Remediation Works Project Community Information Session 26 September 2013.
Diversion of Flood Water from Ganga at Kanpur.  Introduction  Study Area  Flow Pattern of Ganga at Kanpur  Quantification of Divertible Flood  Downstream.
Salinity and Bulk Water Workshop 27 October 2010 Werribee Irrigation District.
Report of the NPDES Subcommittee. Conference Call Meetings July 8 and August 19 Mercury Discharges – Utility Request to Address Permit Requirements for.
Environmental Studies IDC3O3 Ms. Nguyen. * Amount of oxygen dissolved in water is a good indicator of water quality and the kinds of life it will support.
Capital Cost Comparison Regional System vs Decentralized Alternative.
STORM WATER STORAGE AND TREATMENT
City of Tallahassee Wastewater Treatment System Hydrogeology Workshop – 2005 May 12 – 13, 2005.
1 7 October 2015 Biosolids Activities at Dusty Road.
Landfill Odor Action Plan Utilities Department October 6,
Introduction to Environmental Engineering Dr. Kagan ERYURUK
Public Information Meeting Wastewater Treatment January 26, 2016.
Restrictions and requirements for the use of organic fertilizers in Estonia Rene Reisner
Environmental Protection Commission of Hillsborough County Extending Piney Point Emergency Permit November 3, 2003.
GEF CReW Workshop on Sustainable Financing Facilitation Meeting Resource Valuation of Wastewater Management National Environment and Planning.
Metropolitan Council Water Supply Planning in the Northwest Metro Water Availability Technical Focus Group : June 9, 2008 Lanya Ross Senior Environmental.
ECan approaches to managing nutrient losses to groundwater.
Storm Water Pollution Prevention Plan Development Todd E. Hubmer PE WSB &
Richard McKey: Technical Specialist, Hydrology and Water Allocation 7 years in hydrology, experience of field hydrology, flood forecast modelling, low.
ANIMAL CONCENTRATION AREAS WORKSHEET Completing a Manure Management Plan Workshop v
“Engaging Compliance”: Attempting to improve engagement with Dairy Effluent Compliance in the Waikato Region Scott Cantley Proactive Monitoring programme.
Dave Clark and Michael Kasch
Jon Risgaard, Wastewater Branch Rick Bolich, Raleigh Regional Office
Optimising Sludge Dewatering – Benefits from Shared Water Services
Wastewater Treatment.
Wastewater Treatment.
Hydrogeologic Investigations of the Silver Lake Wetland
Wastewater Treatment.
Waste Minimization & Sludge Handling
Big Sky Wastewater Facility Plan Update
City of Janesville Wastewater Facility Plan Amendment Public Hearing
Wastewater Treatment.
WASTE DISPOSAL No matter what processing is done, there will be some residue that needs to be disposed of safely Options for disposal Modern, engineered.
Wastewater Treatment.
Lake Tarawera Needs Help!
USES OF DOMESTIC RECLAIMED WATER
Presentation transcript:

Neighbours’ Meeting 29 th September 2015

Introductions  David Hopman – Manager Assets and Operations  Kevin Godfrey – Treatment Plant Supervisor

 Communicate the findings of the Annual Report on plant performance  Overview of construction issues associated with the old ponds  Pond sludge removal  Additional irrigation options  To provide an update on progress with the project and the timeline for the coming year  To provide neighbours with an opportunity to raise any issues they may have and for appropriate people from within the project team to answer questions

 New pond construction complete.  New border strips planted shortly with any settlement to be corrected when earthen borders are constructed.  50,000m³ sludge dewatered, desludged and landfilled versus an estimate of 36,600m³.  Up to 15,000m³ sludge remains in Ponds 2, 3 & 3A.  Exploring alternative options for sludge management.  Determine options for additional land disposal.

For the 2014/15 monitoring period, the following was noted:  The discharged flows complied with the consent requirements on all occasions.  The quality of the discharge complied with the consent conditions.  Telemetry for providing treatment plant flow data to the Regional Council’s Data Management System was not commissioned for a month after the consent date because of time taken to clarify GWRC time and date format system requirements.  The effects of discharges of treated wastewater on aquatic life in the Ruamahanga River are expected to reduce once the full land disposal system is commissioned with discharges only at higher river flows.

Direct Discharge Stopped

New Discharge Commissioned

Irrigation Started Note: graphs exclude readings for sites HB11 and BP34/0047 as their readings were below detection limits.

Irrigation Started Note: graphs exclude readings for sites HB11, BP34/0047 and BP34/0049 as their readings are below detection limits.

Irrigation Started Note: the graph excludes readings for sites HB16, HB21, HB13, BP34/0047, BP34/0048 and BP34/0049 as their readings are below the detection limits.

Soil Monitoring – Total Nitrogen

Ruamahanga River Environmental Monitor Data QMCI Decreases DateRU1RU2/RU1RD2 RU2/RD1RD2 *4/03/ /11/ /03/ /01/ /03/ Average Decrease 2.2 * sample taken before diffuser commissioned

Land Discharge Requirements Border Strip Maximum Application Depth ParameterValue Irrigation Volume (m 3 ) 491,560m³ Irrigation Area (ha) 56.4 Average Irrigation Depth (mm) 872 Maximum Depth Recorded (mm) Border Strip J9-4 on 29/03/15 79

Average Daily Summer Application Rates ParameterValue Irrigation Volume (m 3 ) 491,560m³ Irrigation Area (ha) 56.4 Irrigation Period (days) 181 Rainfall Over Period (mm) 402 Average Irrigation Depth Per (mm) 4.8 Average Rainfall Per Day (mm) 2.2 Average Daily Application Rate Including Rainfall (mm) 7.0

 Summer of 2014/2015 average application rate was 7.0 mm (compared to 4.9 mm in 2013/14)  Consent maximum 10 mm (average)  Increased application rate due to: improvements in soil structure with tillering of roots ripping to relieve compaction better understanding of pastures a dry summer  Expectation is that irrigation rates rate will continue to increase with with improving pastures and soil structure.  All Balage sold with half of upcoming season pre-ordered. Border Strip Operation - Irrigation L-Zone Border Strips

 Options being discussed with stakeholders  Sludge is relatively inert and environmental impacts are likely to be minimal  It is well stabilised and contains less nutrients than expected.  Stakeholder support to manage the sludge onsite as a more cost effective option.  Options are to; use on border strips use on planted beds leave where it is Sludge Removal

 15 hectares of additional irrigation capacity required to make up for abandoned M-Zone border strips  Options being explored: constructed wetland in area of old ponds filtration/UV disinfection – a trial has been completed additional irrigation on Homebush dairy farm irrigation of adjacent farms  Discussions with Iwi have been held to “rule-in-options”  Once Iwi have considered the implications of these options, further work will be done. Additional Irrigation Options

 All queries or concerns should be directed to MDC.  Calls/contact are logged and directed to David Hopman.  David discusses/actions with the appropriate parties.  Action is taken as appropriate, the call closed off and contact made with the person who contacted MDC.

Questions?