Digital PECVD Machine Design and Construction Zlatan Ceric William Edwards Timothy Gurtler David Ogden Quan Tran Date:10/25/2010.

Slides:



Advertisements
Similar presentations
HYDRAULICS & PNEUMATICS
Advertisements

1 ASSEMBLY NOTES 1.Specifications Build according to IPC 6012 class 2 Standards 2.THIS DEVICE IS SUSEPTABLE TO DAMAGE BY ESD – Use appropriate ESD precautions.
ELECTRONIC FUEL INJECTION. Introduction Strict emission standards require precise fuel delivery Computers used to calculate fuel needs EFI very precise,
By.
Component Rebuilds John Richards Cashman Product Support Representative Lyle Kibbe Cashman Service Supervisor A Guided Tour Through Cashman Equipment.
Preliminary Design Review
R·I·T Kate Gleason College of Engineering Design of a Tensile Load Frame for a Scanning Electron Microscope Senior Design Project Project Manager.
Thermopile Test Bench Detailed Design Review Team Thermopilers Adrian Aspinall, David Eld, Tyler Merritt, Paul Sowinski, Michael Sotolongo 1.
AS-i, The Simplest Automation Networking Solution Dated: 10/30/2008.
Hall D Solenoid Controls. Rockwell Software Overview RSLogix5000 (PLC Programming) RSLinx Classic (Rockwell software/hardware interface) FactoryTalk (GUI.
ECE 4006 Senior Design Project Talal Mohamed Jafaar Ibrahima Bela Sow Mohammad Faisal Zaman Bringing Gigabit Ethernet to the Masses Supervisor: Dr. Martin.
Automated Feeding Solutions for Dog Owners Preliminary Design Review October 19, 2007 Project Automated Dog Feeder Project Advisor Dr. Hongwei Wu The Canine.
PLC: Programmable Logical Controller
LabView Users Group Meeting June 20 th, 2006 Process Control Using Compact Field Point/Labview Real-time Michael Tockstein Microelectronics Technology.
Data Acquisition Real-Time System Integration Preston Schipper Matt Hulse Adrienne Baile DARSI II.
ELECTRONIC FUEL INJECTION COMPONENTS
Digital PECVD Machine Design and Construction Zlatan Ceric William Edwards Timothy Gurtler David Ogden Quan Tran Date:12/10/2010.
SCADA and Telemetry Presented By:.
© 2004 Swagelok Company igc ™ II Modular Surface-mount Design Design.
Viking Pump Flow Manager - Phase 2 Senior Design May
1 BROOKHAVEN SCIENCE ASSOCIATES LBT Diagnostics Installation Update Dan Padrazo Diagnostics & Instrumentation Group Feb 1, 2012.
Segway Controller Notes. = connection on top layer of circuit board = connection on bottom layer of circuit board Ground Plane: Areas enclosed by the.
PLC introduction1 Discrete Event Control Concept Representation DEC controller design DEC controller implementation.
PLC: Programmable Logical Controller
Automated Beverage Dispenser Georgia Institute of Technology April 24, 2009 Katrina Kumm Mike Fojas Mark Peterson Nick White Nick Migliaccio.
VELO workshop, Amsterdam, april ‘00M.Ferro-Luzzi Difficulties with current mechanical design recent FEA results: to obtain sufficient stiffness of center.
Objectives Overview Objective: Create an Earth field unit to test electrochemical sensors Deliverables: –Field-ready unit –Test data verifying requirements.
Your Connectivity Partner. Locations Main Office: High Tech Products Lallio, Italy USA Office: HTP Connectivity Parsippany, NJ.
MSD P14315 UPDAS Intro/Agenda Project Plan Engineering Requirements System overview Sensors I/O Connections PLC Communications Analysis Power Case Design.
Vacuum system.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 06 June 2006 No 1 /17 LARP Phase II Secondary Collimator RC1 Collimator Test Program Plan Forward Revised.
Power Systems Specialists Monitoring and Controls System (MCS)
Individual Subsystem Testing Report New Jersey Space Grant Consortium with Rutgers University Stevens Institute of Technology 2/13/2012.
Automating Continuous Gas Lift
VARAN Bus Presentation 1 / 27 The VARAN BUS.
Photo-detector Tube Construction Laboratory Considerations Dean Walters Argonne National Laboratory.
Status of the Crystal Ball A.Starostin UCLA. Tasks in preparation for the polarized target experiments CB and the “cube” will be movable on rails – all.
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
Managed by UT-Battelle for the Department of Energy SCL Vacuum Control System Upgrade Derrick Williams
Jose Alberto Rodriguez.  Describe how we currently characterize structures at CTF3  Describe how we want to improve the characterization  Learn from.
60kW Thermosiphon control system
LARP Collaboration Meeting Racetrack Coil Fabrication
Lab Activities: Chamber Baking & Mixing Station Flushing Claudio Curtis Dan PPS meeting 22 June, 2011.
QUICK CAMP DESIGNED BY: KENDALL WILLIAMSON DAKOTA ROBERSON SPECIAL THANKS TO: DON WILLIAMSON ELECTROFAB INC. MATTHEW BURKHART SURESH MUKNAHALLIPATNA VOLPI.
1 ALARMLINC. 2 OVERVIEW Expanding Situational AwarenessOVERVIEW.
10/3/2003Andreas Jansson - Tevatron IPM review1 Tevatron IPM Proposed design.
Virtual Lab on Automation Systems A Proposal under Mechatronics Laboratory Presented By Tanuja Sheorey PDPM IIITDM Jabalpur.
INTEGRATED SUBSYSTEM BUILD & TEST ANDRE PELLETREAU, JEREMY WILLMAN, KAI MASLANKA, VINCENT STOWBUNENKO, & KERRY OLIVEIRA.
MOBILE CAMERA CONTROL SYSTEM. Team Members Ruth Ayalon – ME Ruth Ayalon – ME Erin Gillespie -ME Erin Gillespie -ME Claudia Forero –ISE Claudia Forero.
National Centre for Nuclear Research, Poland
Brooks Expert Support Tool (BEST) Software
Advisor: Dr. Shangchao Lin
LARP Phase II Secondary Collimator RC1
PLC: Programmable Logical Controller
How SCADA Systems Work?.
Systems Analysis and Design
XFEL Vacuum System Commissioning
Subsystems of EFI Chapter 22 Lesson 2.
Computer Integrated Manufacturing ( CIM). Chapter One 1.1 Introduction 1.2 Types of Manufacturing 1.3 CIM Hardware and CIM Software 1.4 Nature and Role.
Graphite® Control Platform
ELECTRONIC FUEL INJECTION
PLC / SCADA / HMI Controllers: Name : Muhammad Zunair Comsats University Date: 28-October-2018.
Industrial Cylinder Division - USA
Resource Planning, Cost Estimation and Budgeting
Cryomodule Assembly Plan
Fluid Components for Small, Smart, Sampling Systems
Vacuum Controls Stephen Schuh Tom Porter 25 October 2006
Vacuum Control System for Monolith Vacuum
Presentation transcript:

Digital PECVD Machine Design and Construction Zlatan Ceric William Edwards Timothy Gurtler David Ogden Quan Tran Date:10/25/2010

Project Overview Contracted by Microelectronics Research Center Convert existing RIE to PECVD machine Automation of process will eliminate the need for constant human monitoring Cost of Hardware: $35,000 Building base model for MiRC modification

Final Product

Design Objectives Continuously monitor chamber vacuum pressure, RF power, and gas flow rate Automate the polymer deposition process Allow for future process modification through HMI

RIE to PECVD Conversion Removal of turbo pump Use of one chamber pressure sensor instead of two Removal of old chamber heater Remapping of wires to integrate new design Editing PLC and HMI code to reflect all changes

System Hierarchy

Chassis Construction Gator Jaw is the material used to build the stand It is customizable and easily changed if needed Plates can be mounted to the frame to provided a surface for components to mount to

Component Mounting Din Rail provides a simple mounting solution Standard 35mm width used widely in industrial control systems PLC was designed to mount onto this type of Rail Power supply and terminal blocks also mount to it

Centralized Signal Testing Over 70 signals are required for the PLC to manage Having terminal blocks gives a convenient location to test the signals Mounting them onto the din rail gives a clean look for the machine Future manipulations of the machine will also be more convenient

PLC Operational Flow Chart

HMI Screen Capture

Subsystems Interaction Subsystems need a way to interact with each other and PLC Require customized cables Designed 25 pins D-sub type connector for RF power supply Design serial connector for pressure sensors

Cable Design 25 pins D-subSerial

Testing Challenges Unable to test subsystems individually – Supervisor advised not to turn on components until fully assembled PLC program can isolate subsystem from the whole system to test – Sensor testing scheduled to finish by 11/10 – MFC testing scheduled to finish by 11/15 – RF power testing scheduled to finish by 11/22

Current Solution Test customized cables – Verify for coupling and short Benefit of testing cables – Narrow down scope for determine defective components in future system malfunction – Reduce time getting the system working

Hardware Schedule Mass Flow Controllers 11/5 Pneumatic Valves 11/8 Touch-Screen HMI 11/10 Wiring Components to Terminal Blocks 11/13

Software Schedule PLC Programming 11/5 HMI Programming 11/8 Loading Software 11/10

Upcoming construction targets Mounting the bottom of the plasma chamber Requires special supervision - Proper hermetic seal - Surface aberration

Phase II Construction MFC must be mounted Plan to test as many subsystems as possible prior to mounting.

Budget and Cost Project is exclusively design for Ga Tech MiRC and cannot be used for mass production Parts are donated, salvaged, and funded by: – Ga Tech MiRC – Rockwell Automation A conservative estimate cost of $135,000 including hardware and labor/testing for completed project

Cost Breakdown Labor & Testing Assume average GT ECE graduate earns $65K annually Project includes 5 design and implementation members Estimated labor and testing of $100K Hardware Plasma Chamber$2,500 RF Power Supply$6,500 Frame$2,000 MFC x4$8,000 Throttle Valve$5,000 Major components

Questions or Comments?