Serial Powering - Protection Purpose Protect the stave Assure supply of power to a serial powered chain of modules when one member of the chain fails Control.

Slides:



Advertisements
Similar presentations
André Augustinus 15 March 2003 DCS Workshop Safety Interlocks.
Advertisements

Trouble - Shooting ELR - Electric Latch Retraction.
555 Timer ©Paul Godin Updated February Oscillators ◊We have looked at simple oscillator designs using an inverter, and had a brief look at crystal.
» When you have completed this module you will know, what components do, what they physically look like and how they are represented in a circuit diagram.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Shielding Workshop S. Buda Personnel Protective Systems March 27, 2007.
I.Tsurin Liverpool University 08/04/2014Page 1 ATLAS Upgrade Week 2014, Freiburg, April 7-11 I.Tsurin, P.Allport, G.Casse, R.Bates, C. Buttar, Val O'Shea,
Termination Boards Dynamic Positioning Cabinet. Termination Boards Overview The termination Boards provides the connections between the field and the.
Lecture 4: Programmable logic Controllers
February 5, Inputs and Output Relays. February 5, What are Inputs and Output Relays? Inputs allow the controller to receive signals from the.
Control & Monitoring of DC-DC Buck Converters Satish Dhawan Yale University Power Distribution Working Group Meeting- Tuesday 24 February 2009 ATLAS Upgrade.
ACES Workshop 3-4 March, 2009 W. Dabrowski Serial power circuitry in the ABC-Next and FE-I4 chips W. Dabrowski Faculty of Physics and Applied Computer.
1 Serial powering Marc Weber, RAL Common ATLAS CMS Electronics Workshop for SLHC What is SP? Why is it needed? Experimental results and why is SP not noisy?
Chapter 6 Voltage Regulators - Part 2-.
National Highway Traffic Safety Administration Electrical Safety William Joel Sánchez.
LDO characterization Laura Gonella Pjysikalisches Institut Uni Bonn.
Series and Parallel Circuits 1 Lesson 9 November 17 th, 2010.
Ivan Pogrebnyak Supervisors: Paramonov, Drake, Proudfoot ATLAS, MSU, Argonne Tile week upgrade session June 10, 2015 TileCal requirements for ELMB upgrade.
CCD Clocking and Biasing CABAC_0 : Design Test_0 : Design Pierre Antilogus (from a Hervé Lebbolo’s talk) BNL, Raft Electronic Workshop January 25 th 2012.
ATLAS Tracker Upgrade Stave Collaboration Workshop Oxford 6-9 February 2012 ABC 130 Hybrid.
POWER PLANT USED IN TELECOM
SWITCH-MODE POWER SUPPLIES AND SYSTEMS Silesian University of Technology Faculty of Automatic Control, Electronics and Computer Sciences Ryszard Siurek.
Chapter 6 Control Using Wireless Throttling Valves.
Electrical Distribution Training
Towards a Detector Control System for the ATLAS Pixeldetector Susanne Kersten, University of Wuppertal Pixel2002, Carmel September 2002 Overview of the.
John Matheson Rutherford Appleton Laboratory On behalf of the SP Community Thanks to Martin Gibson (RAL), Richard Holt (RAL), Dave Lynn (BNL), Peter Phillips.
1 WP3 Bi-Weekly Meeting Activities at Liverpool 1.Evaluation of Compact DCDC converter Designed to match up to an ABC130 module 2.Status of FIB’d hybrid/module.
Microprocessor-Based System. What is it? How simple can a microprocessor-based system actually be? – It must obviously contain a microprocessor otherwise.
Mitch Newcomer Representing work at RAL, Liverpool, BNL and Penn.
A.A. Grillo SCIPP-UCSC ATLAS 10-Nov Thoughts on Data Transmission US-ATLAS Upgrade R&D Meeting UCSC 10-Nov-2005 A. A. Grillo SCIPP – UCSC.
Power Distribution Peter W Phillips STFC Rutherford Appleton Laboratory ECFA HL-LHC Workshop, Aix-les-Bains, 1-3 October 2013.
1 Serial Powering for Silicon Strip Detectors at SLHC Marc Weber (RAL), Giulio Villani (RAL), M. Lammentausta (Savonia Polytechnic Kuopio) The problem:
Power Protection for Staves/Supermodules Two Approaches Purpose of circuit: Provide an alternate current path for serial power current on the module level.
Chapter 6 Voltage Regulators By En. Rosemizi Bin Abd Rahim EMT212 – Analog Electronic II.
Level 2 Unit 5 Electrical and Electronic Circuits and Systems Engineering Diploma Level 2 Unit 5 Electrical and Electronic Circuits and Systems Electronic.
D. Nelson October 7, Serial Power Overview Presented by David Nelson
FLEX! Flexible power from 100% till 150% Flexible input from 115 till 500Vac Flexible short circuit and overload protection  Extremely compact design.
Hybrid Power Controller (HPC) Final Presentation Senior Design II.
P. Aspell CERN April 2011 CMS MPGD Upgrade …. Electronics 2 1.
System implementation of a power distribution scheme based on DC-DC converters F.Faccio, G.Blanchot, S.Michelis, C.Fuentes, B.Allongue, S.Orlandi CERN.
Serial Powering System Architecture Peter W Phillips STFC Rutherford Appleton Laboratory On behalf of the SP Community Acknowledgement: many figures prepared.
EMT212 – Analog Electronic II
Compilation of Dis-/Advantages of DC-DC Conversion Schemes Power Task Force Meeting December 16 th, 2008 Katja Klein 1. Physikalisches Institut B RWTH.
Rutherford Appleton Laboratory Particle Physics Department G. Villani Σ Powering Prague TWEPP TWEPP-07 Topical Workshop on Electronics for Particle.
Basic Equipment and Schematic Reading. Objectives Learn the basic equipment that will be used in the Lab. Learn some of the basic symbols used on electrical.
SP & DC-DC Considering the benefits of combining serial powering and DC-DC conversion technologies in powering ATLAS SCT upgrade modules & staves Richard.
1 Marc Weber (RAL), TWEPP Power Meeting, September 2008 Critical areas and ATLAS next steps Marc Weber (Rutherford Laboratory) A few obvious comments on:
Rutherford Appleton Laboratory Particle Physics Department 1 Serial Powering Scheme Peter W Phillips STFC Rutherford Appleton Laboratory On behalf of RAL.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
1 Serial powering elements What have we done in the last few years? What have we learnt so far ? Roadmap Roadmap for serial powering Marc Weber, RAL Power.
SPP-COB meets a module Ashley and Peter 17 th June 2011.
Module Radiation Length. Goals Estimate the expected radiation length of a module, based on the design and measurements on as-built modules Determine.
RD program on hybrids & Interconnects Background & motivation At sLHC the luminosity will increase by a factor 10 The physics requirement on the tracker.
Objective of Lecture State Thévenin’s and Norton Theorems. Chapter 4.5 and 4.6 Fundamentals of Electric Circuits Demonstrate how Thévenin’s and Norton.
Survey of Smart Grid concepts and demonstrations Smart substation Ari Nikander.
ESX10-T Electronic Circuit Protectors with Hazardous Area approvals.
Power supply.
Serial powering for pixels F. Hügging, D. Arutinov, M. Barbero, A. Eyring, L. Gonella, M. Karagounis, H. Krüger, N. Wermes SLHC-PP Annual Meeting, CIEMAT,
Analyzing & Building Electrical Circuits.  Predict the effects of switches, resistors and other circuit diagram symbols.  Draw circuit diagrams for.
Serial Power Distribution for the ATLAS SCT Upgrade John Matheson Rutherford Appleton Laboratory On behalf of the SP Community Thanks to Richard Holt (RAL),
Integrated Shunt-LDO Regulator for FE-I4
555 Timer EEE DEPARTMENT KUMPAVAT HARPAL( )
Serial Powering of Silicon Strip Detectors at SLHC Marc Weber, Giulio Villani, M. Tyndel (RAL) with Anu Tuonnonnen and Robert Apsimon.
Chapter 27 Power Supplies.
DC/DC Converter Flexibility Enables Adding Noise Reduction Circuitry
Serial powering protection for Inner Detector modules
Dr. Unnikrishnan P.C. Professor, EEE
Compilation of Dis-/Advantages of DC-DC Conversion Schemes
Knowing When to Stop: An Examination of Methods to Minimize the False Negative Risk of Automated Abort Triggers RAM XI Training Summit October 2018 Patrick.
ECE 352 Electronics II Winter 2003 Ch. 8 Feedback 1 Feedback *What is feedback?Taking a portion of the signal arriving at the load and feeding it back.
Presentation transcript:

Serial Powering - Protection Purpose Protect the stave Assure supply of power to a serial powered chain of modules when one member of the chain fails Control the stave Allow power to arbitrary selection of modules Richard Holt – Rutherford Appleton Laboratory ATLAS SCT SP protection options January

Why add protection? 2 Wire bonding failure Power failure modes Noisy module Open circuit module Richard Holt – Rutherford Appleton Laboratory ATLAS SCT SP protection options January 2009 Without protection, one failed module can adversely affect the operation of all other modules on stave Demonstration staves are very reliable - Protection is not strictly necessary

How to add protection? 3 Short out affected module(s) -- Switch on -- Short out and disable this module One module out-of-service Richard Holt – Rutherford Appleton Laboratory ATLAS SCT SP protection options January 2009 The switch should respond to module over-voltage and to DCS control

Issues to address 4 How does the protection do its job? Is automatic protection required? How fast must the protection react? Is DCS control/reporting required? (yes) How is the protection controlled? Switching must not affect the rest of the SP chain? Where should the switch be placed? (hybrid) Quantitative estimate of failure rate? What extra complexity can we justify? Is protection needed for other powering configurations? But… C ircuit options default state connections Feedback from hybrid current/voltage Reaction time Implementation requirements AC coupling Automatic and/or DCS Transient effects on problem &/or power-up Bus-cable or hybrid Numerical failure analysis Switch failure modes, fail safe, mass, possibility of common mode failure, monitoring Richard Holt – Rutherford Appleton Laboratory ATLAS SCT SP protection options January 2009 Note that independent module voltage monitoring may be available through the shunt regulator device if using an “intelligent” component such as SPi, but this may not be possible if there is a an open-circuit module. However, it may be possible to identify a faulty module by switching all modules off, then each one on in turn.

Qualitative target specification 5 DCS should be able to switch off (short-out) selected modules Residual voltage (when ‘off’) < 100mV Minimise number of components, area of components and bus-cable lines Position on hybrid is acceptable Over-voltage & over-current automatic protection is desirable Switching a working module on/off must not affect the behaviour of other modules During normal operation (module working) protection draws no power Richard Holt – Rutherford Appleton Laboratory ATLAS SCT SP protection options January 2009

Can we use just one transistor for the task of shorting and SR? Can we accept the risk of wire-bonds carrying power from bus-cable to hybrid or should protection be placed directly on the bus-cable? Can SR and protection be included in a single ASIC package? Examples 6 Richard Holt – Rutherford Appleton Laboratory ATLAS SCT SP protection options January 2009 OR Less material, but possibility of common mode failure OR Easier to implement, but depends on good wire bonding

a) Circuit option 7 No active protection This option has been sufficient for demonstration staves. This is a serious option for the ATLAS upgrade. +simple minimum mass, minimum lines engineered redundancy including thick wire bonds & several shunt transistors -Cannot switch modules off Richard Holt – Rutherford Appleton Laboratory ATLAS SCT SP protection options January 2009

b) Circuit option 8 Bonn Each module has a single line to an off-detector controller. This can be used to switch the module off (short it) or to monitor the module voltage. +simple +control & monitor default state = OC -no fast auto- response -many bus-cable wires Richard Holt – Rutherford Appleton Laboratory ATLAS SCT SP protection options January 2009 OC = Open Circuit (ie switch is “off”, module powered) RefATLAS Tracker Upgrade Workshop, NIKHEF 3-7 Nov 2008 Powering, Wed 5 Nov 2008, 17:30 Laura Gonella

c) Circuit option 9 BNL A common data line fed to a one-wire controller output is latched and used on each module to switch the module off (short it). +latching control +single DCS wire +fast auto-response default state = OC -no monitor -low residual module- off voltage required to hold latch Richard Holt – Rutherford Appleton Laboratory ATLAS SCT SP protection options January 2009 RefATLAS Tracker Upgrade Workshop, NIKHEF 3-7 Nov 2008 Electronics Working Group, Tue 4 Nov 2008, 15:40 David Lynn OC = Open Circuit (ie switch is “off”, module powered)

d) Circuit options 10 Villani Similar to the Bonn design, but power is delivered to the one- wire controller and latch by the data line. +latching control +“single” DCS wire +no trickle power default state = OC -no monitor -no auto-response Richard Holt – Rutherford Appleton Laboratory ATLAS SCT SP protection options January 2009 OC = Open Circuit (ie switch is “off”, module powered)

e) Circuit options 11 Extended As Villani design, but latch may also be set in the safe state using the shunt regulator alarm. Also consider depletion mode FET for fail-safe. +latching control +single DCS wire +no trickle power +auto-response default = SC -no monitor Richard Holt – Rutherford Appleton Laboratory ATLAS SCT SP protection options January 2009 SC = Short Circuit (ie switch is “on”, module un-powered)

Comparison 12 Richard Holt – Rutherford Appleton Laboratory ATLAS SCT SP protection options January 2009 Proposal Auto over-voltage protectionAuto over-current protectionLatchingMinimum ( ‘ off ’ ) voltage Circuit complexityExtra bus-cable linesExtra passive module componentsExtra active module componentsExtra module massExtra area mm 2 Demonstrated No protection NNNn/aL00000Y Bonn NNN0Ln21??? BNL YNY?M243? 100 Y Villani NNY0H2????½ Extended YYY0H2????N

Summary 13 …circuit options are being implemented and evaluated… Richard Holt – Rutherford Appleton Laboratory ATLAS SCT SP protection options January 2009

End 14 …circuit designs follow… Richard Holt – Rutherford Appleton Laboratory ATLAS SCT SP protection options January 2009

Bonn protection 15 Richard Holt – Rutherford Appleton Laboratory ATLAS SCT SP protection options January 2009 Copied from presentation by Laura Gonella ATLAS Tracker Upgrade Workshop, NIKHEF 3-7 Nov 2008 Powering, Wed 5 Nov 2008, 17:30

BNL protection 16 Richard Holt – Rutherford Appleton Laboratory ATLAS SCT SP protection options January 2009 Copied from presentation by David Lynn ATLAS Tracker Upgrade Workshop, NIKHEF 3-7 Nov 2008 Electronics Working Group, Tue 4 Nov

Villani protection 17 Richard Holt – Rutherford Appleton Laboratory ATLAS SCT SP protection options January 2009 From Giulio Villani, RAL – personal communication