GLAST LAT Project – Cost and Schedule ReviewJanuary 27, 2004 AntiCoincidence Detector 1 GLAST Large Area Telescope: Cost/Schedule Review January 27, 2005.

Slides:



Advertisements
Similar presentations
GLAST LAT ProjectMonthly Review, Aug-1, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
Advertisements

GLAST LAT Project Online Peer Review – July 20, Integration and Test R. Claus 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
GLAST LAT Instrument GLAST Monthly Mission Review August 6, 2007 K. Fouts, SLAC 1 Monthly Mission Review Project Status Overview August 6, 2007 Ken Fouts.
GLAST LAT ProjectMonthly Status Meeting Jan 26, Project Status January 26, 2006 Gamma-ray Large Area Space Telescope Lowell A. Klaisner Project.
GLAST LAT ProjectMonthly Review, September 1, Tracker SubsystemR. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S August Status Meeting.
1 GLAST LAT ACD FTF 3/17/05 GLAST Large Area Telescope: Face to Face Meeting March 17, 2005 AntiCoincidence Detector (ACD) Subsystem WBS: David J.
GLAST LAT Project – Cost and Schedule ReviewNovember 3, 2004 AntiCoincidence Detector 1 GLAST Large Area Telescope: Cost/Schedule Review November 3, 2004.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware July 2005 Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectMonthly Status Review – Sept. 1, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Aug. 14, 2001 Scott Williams 1 GLAST Large Area Telescope: Instrument Operations Center Scott.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 Martin Nordby1 Martin Nordby Stanford Linear Accelerator Center Stanford University.
GLAST LAT ProjectACD CDR, January 7 & 8, 2003 Section 10 Integration and Test 1 GLAST Large Area Telescope: ACD Integration & Test Jim La/ACD I&T Lead.
GLAST LAT ProjectSubsystem Managers Face to Face, November 17, GLAST Large Area Telescope: Darren Marsh Stanford Linear Accelerator Center Performance.
GLAST LAT Instrument GLAST Monthly Mission Review July 12, 2007 N. Johnson, NRL 1 Monthly Mission Review Project Status Overview July 12, 2007 Neil Johnson.
GLAST LAT Project Quarterly Review, Aug. 14, 2001 Gunther Haller1 GLAST Large Area Telescope: Electronics, DAQ & Flight Software Gunther Haller Stanford.
GLAST LAT ProjectSLAC Pre - Baseline Review, April 16, 2002 ` 1 GLAST Large Area Telescope: I&T Overview WBS: Elliott D. Bloom Stanford Linear Accelerator.
GLAST LAT ProjectNovember 3, 2005 I&T Phase 0 IRR/TRR 1 GLAST Large Area Telescope: Integration and Test Phase 0 IRR/TRR November 3-4, 2005 Introduction.
GLAST LAT Project4.1.7 July 17, 03 LAT Meeting G. Haller V41 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S LAT.
GLAST LAT ProjectJune Cost/Schedule Status Meeting 07/23/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to June Cost/Schedule.
GLAST LAT ProjectSubsystem Managers Meeting May 12, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
GLAST LAT ProjectLAT Planning Meeting July 17 th and 18 th Integration and Test 1 GLAST Large Area Telescope: I & T Input to LAT Planning Meeting.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
GLAST LAT ProjectNovember 17, 2004 AntiCoincidnce Detector 1 GLAST Large Area Telescope: Face to Face Meeting November 17, 2004 AntiCoincidence Detector.
GLAST LAT ProjectF-to-F, March, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Face-To-Face.
GLAST LAT Project ACD CDR Jan 7-8, Section 7 Mechanical Ground Support Equipment GLAST Large Area Telescope: AntiCoincidence Detector (ACD) Mechanical.
GLAST Large Area Telescope:
GLAST LAT ProjectSept 3, 2003 AntiCoincidnce Detector 1 GLAST Large Area Telescope: Planning Meeting September 3, 2003 AntiCoincidence Detector (ACD) Subsystem.
GLAST LAT ProjectDelta PDR/Baseline Review July 29-August 1, 2002 Section 7.3 AntiCoincidnce Detector Technical Status 1 GLAST Large Area Telescope: AntiCoincidence.
GLAST LAT ProjectMonthly Review, March 30, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
GLAST LAT ProjectEGSE Peer Design Review, August 17, S. WilliamsEGSE Overview Electrical Ground Support Equipment Overview Scott Williams Stanford.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR Section 15 Manufacturing Process 1 GLAST Large Area Telescope Manufacturing Process.
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Engineering Model Tower.
GLAST LAT ProjectFace to Face Managers Meeting 04/14/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Face to Face Managers.
GLAST LAT Project DOE/NASA Review, March 31, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager
GLAST LAT ProjectMonthly Status Review – June 30, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety.
P. Shanahan Nov 15, 2003 Page 1 MINOS WBS 2.3: Electronics, DAQ and Database Status Accomplishments since May review Near Detector Electronics production.
GLAST LAT ProjectMonthly Review, May 24, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
Preparation Examples ACD has provided a website of their CDR preparation status I encourage everyone to view posted material, including the CDR Dry Run.
GLAST LAT ProjectDOE/NASA Baseline-Preliminary Design Review, January 8, 2002 Document: #1 GLAST Large Area Telescope: AntiCoincidence Detector (ACD) Overview.
GLAST LAT Project4.1.7 G. Haller V2 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S April Status Gunther.
GLAST LAT ProjectMonthly Review, June 30, DAQ & FSWV2 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
1 GLAST LAT ProjectMechanical Systems Mechanical Systems September 2003 GSFC Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectDOE/NASA Baseline-Preliminary Design Review, January 8, 2002 Document: #1 GLAST Large Area Telescope: I&T Overview Elliott D. Bloom Stanford.
LAT Design Integration and Analysis1 GLAST LAT Project24 May 2005 LAT Monthly Status Review 24 May 2005 Design Integration and Analysis LAT Monthly Status.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
GLAST LAT Project IFC Tour – Sep 5,2003 Larry Wai 1 GLAST Large Area Telescope: Integration and Facility Status Larry Wai SU-SLAC Integration and Facility.
GLAST LAT ProjectPeer Review & CDR Preparation Document: LAT-PR Preparation Schedule Subsystems Peer Reviews –ACD January 7-8, 2003 –CALMarch.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems November 2003 GSFC Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectSLAC Internal Review, April 16-18, 2002 LAT-PR Electronics and Flight Software WBS GLAST Large Area Telescope: Electronics,
GLAST LAT ProjectPMT Procurement Review May 24, 2002 AntiCoincidence Detector Design Overview 1 GLAST Large Area Telescope: AntiCoincidence Detector (ACD)
GLAST LAT ProjectMonthly Review, Sept 27, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
GLAST Large Area Telescope:
Bill Raynor Naval Research Lab
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Gamma-ray Large Area Space Telescope ACD Final Performance
Gamma-ray Large Area Space Telescope
GLAST Large Area Telescope:
GLAST Large Area Telescope: I&T Integration Kickoff Meeting
GLAST Large Area Telescope: Cost/Schedule Review September 1, 2005
GLAST Large Area Telescope:
GLAST Large Area Telescope
GLAST Large Area Telescope: Jonathan Ormes / Rudolph Larsen
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Integration and Test Organization Chart
Introduction and Overview
GLAST Large Area Telescope:
Overview Cost to Complete
Presentation transcript:

GLAST LAT Project – Cost and Schedule ReviewJanuary 27, 2004 AntiCoincidence Detector 1 GLAST Large Area Telescope: Cost/Schedule Review January 27, 2005 AntiCoincidence Detector (ACD) Subsystem WBS: David J. Thompson Thomas E. Johnson NASA Goddard Space Flight Center Subsystem Manager/Instrument Manager Gamma-ray Large Area Space Telescope

GLAST LAT Project – Cost and Schedule ReviewJanuary 27, 2004 AntiCoincidence Detector 2 Significant Accomplishments Completed installation of 2 nd side row TDAs. This brings the total number of installed TDAs to 65. Remaining 24 TDAs are installed after integration of the Electronics Chassis. Completed a performance simulation using “as built” gaps between detectors and “as measured” performance data for the flight detector chain (TDA and fiber cables). The ACD efficiency requirement of was met! PMT assembly progressing well. Continue to experience issues with quality and delivery rate of mechanical housings. This has not impacted planned production rate, but has not allowed us to accelerate production to catch up from last months issues with the mechanical housings. Started Thermal Vacuum testing of the Qual/Spare Electronics Chassis. Completed assembly of the first Electronics Chassis.

GLAST LAT Project – Cost and Schedule ReviewJanuary 27, 2004 AntiCoincidence Detector 3 TSA Integration Top and 2 top side row TDAs completed!

GLAST LAT Project – Cost and Schedule ReviewJanuary 27, 2004 AntiCoincidence Detector 4 Flight Electronics Chassis Assembly First Electronics Chassis (dual row) completed!

GLAST LAT Project – Cost and Schedule ReviewJanuary 27, 2004 AntiCoincidence Detector 5 Electronics Chassis Testing Qualification Electronics Chassis in Thermal Vacuum Chamber

GLAST LAT Project – Cost and Schedule ReviewJanuary 27, 2004 AntiCoincidence Detector 6 Near Term Milestones Milestone Description DateNew DateStatus/Notes Complete PMT Assembly January, /11/05 2/21/05 Mechanical parts availability and quality has impacted completion. Complete Flight Mechanical Drawings September 12/23/04 2/18/05 One assembly drawings remains. Designer has been focused on problem resolution, revisions, and EOs. Complete installation of 25 top TDAs10/15/04 Actual 11/10/04 COMPLETE EMI Testing of Qual/Flight Spare Electronics Chassis 11/29/04 Actual 12/06/04 COMPLETE Complete environmental and functional testing of first 10 flight PMTs 11/10/04 Actual 11/19/04 COMPLETED. All 10 PMTs successfully passed testing! Complete 34 PMTs for first dual row Electronic Chassis 11/19/04 12/14/04 1/8/04 COMPLETE Thermal vacuum test Qual/Flight Spare Electronic Chassis using fully functional EGSE 12/15/04 TBD 1/24/05 EGSE software issues delayed the start of this test. Complete 1 st Electronic Chassis Assembly and Functional Test 1/26/05 2/3/05Assembly complete, functional testing underway

GLAST LAT Project – Cost and Schedule ReviewJanuary 27, 2004 AntiCoincidence Detector 7 ACD Milestones

GLAST LAT Project – Cost and Schedule ReviewJanuary 27, 2004 AntiCoincidence Detector 8 PMT Assembly - Schedule of Events Completion status as of 1/ mechanical 112 electrical 90 coated 69 light tight 47 in rail

GLAST LAT Project – Cost and Schedule ReviewJanuary 27, 2004 AntiCoincidence Detector 9 EGSE – Test Stands ACD software developers have been working hard to adapt and complete test scripts –More bugs found in system; another release of LATTE delivered. –Test scripts are now in use for chassis thermal vacuum testing. –Continued serious concern: counts seem to be showing up in channels that do not exist – channels with no cables connected to GASU. Test Script Status: 31 scripts needed. 28 working, 3 in development. –Plan: make needed improvements in some working scripts, based on experience with thermal vacuum tests; then work on three scripts needed for full ACD operation (by February).

GLAST LAT Project – Cost and Schedule ReviewJanuary 27, 2004 AntiCoincidence Detector 10 ACD Problem /Failure Report Status A total of 141 (21 opened since last months Review) PR’s have been generated as of 1/26/05.  122 PR’s have been closed (19 closed this month)  19 PR’s open A total of 12 PFR’s have been generated.  5 PFR’s are open.  1 Red  2 Yellow  2 Black  7 PFR’s closed

GLAST LAT Project – Cost and Schedule ReviewJanuary 27, 2004 AntiCoincidence Detector 11 ACD Schedule Variances – ACD Subsystem (-$462K cum, +$76K current) BEA Schedule Variances (-$128K cum, +$61K current) –All variance is due to the PMTs and EGSE ACD I&T (-$300K cum, +$18K current) –Technical issues (PMTs and EGSE) have delayed progress. This will begin to improve when PMT and EGSE completion allows the ACD to be integrated and tested B GSE (-$22K cum, $0K current) –($22K) – Shipping container work being pushed out to reduce manpower.

GLAST LAT Project – Cost and Schedule ReviewJanuary 27, 2004 AntiCoincidence Detector 12 ACD Cost Variances ACD (-$649K cum, -$289K current period) ACD Project Management/Sys Eng/Science (+$167K cum, -$47K current period) –Science support lower than planned and a lag in accruals. This is one area that has been identified as needing additional support in the form of a Grad student. (+$138K) –Systems Engineering Support running lower than planned (+$16K) –MPS/Lab Tax (+$38K) –Materials, software maintenance and fabrication support (-$33K) Safety and Mission Assurance (-$115K cum, -$92K current period) –Increased level of QA support (1 FTE) not in the baseline plan, but covered in rebaseline. Substantial increase (~2x) in rates not planned Tile Shell Assembly (-$177K cum, -$3K current period) –(-$91K) - Design and analysis manpower –(-$80K) - Fabrication charge backs higher than planned and increased fabrication and material costs required to resolve light leak issues.

GLAST LAT Project – Cost and Schedule ReviewJanuary 27, 2004 AntiCoincidence Detector 13 ACD Cost Variances Base Electronics Assembly (-$453K cum,-$138K current month) –(-$173K) – Labor for PMTs and chassis testing –(-$235K) – Materials, no earned value, but incurring costs on PMT tasks that are in progress, but not completed. Fabrication overrun on PMT housings and rails ($50K). –(-$44K) - SLAC ASIC charges MS/TB (+$21 cum, -$13K current month) ACD Mech Qual and Cal Unit (-$66K cum, $0K current month) –(-$15K) – Tracker costs erroneously charged to the ACD I&T (-$129K cum, +$20K current month) –Have not received credit for the amount of work done. –TSA Integration manpower overrunning. –Unplanned work on EGSE issues B Ground Support Equipment (+$57K cum, -$17K current month) –(-$20K) – Schedule variance –(-$40K) – Labor for EGSE software support. –(+$117K) – Materials. Not billed for work completed

GLAST LAT Project – Cost and Schedule ReviewJanuary 27, 2004 AntiCoincidence Detector 14 Threats to Schedule and Cost 1.GASU/G3 EGSE 2.PMT Assembly 3.Electronics assembly and test 4.Minor Technical Issues that require manpower and time to resolve.