Status of the development of Mini-Camera for the 1 st LST camera. Toko Konan Univ. Japan A test module for the 1 st LST camera, which is called.

Slides:



Advertisements
Similar presentations
D-Cal production preparations in Japan Dec. 16, 2009, D-Cal meeting at CERN Tatsuya Chujo (Univ. of Tsukuba) for the D-Cal Project 1.
Advertisements

St. Joseph Harbor FY 2014 Dredging. St. Joseph Harbor Entrance to the Channel (Prior to Dredging) Areas to be dredged 53,000 Cubic Yards to be removed.
Master Plan. Citizens’ Health Care Working Group Master Plan November 2005.
Line Efficiency     Percentage Month Today’s Date
WV Faculty Salaries Proposal. Full Professor WV salaries.
ISSUES TO CONSIDER IN YOUR PROJECT This is a short presentation from issues discussed in a meeting of MCS3 on Tues 2 nd March 2004.
TAGGER MICROSCOPE ELECTRONICS CONSTRUCTION Readiness Review Feb. 7, 2013 Alex Barnes.
In-Beam PET Status Report -- TPS. 2 TPS project PET monitoring prototype 2D view of the FOV coverage of the 4+4 modules Use of 4 modules vs. 4 modules.
C. Barbieri Schedule 2008 Bled, March /03/20081.
Concluding Summary WBS1.1.2 SCT Subsystem A. Seiden BNL March 2001.
G. Barber Sci-Fi Tracker Progress Ral 28 Oct Progress On The Design Of The Full Tracker Contents:- Recap of New Station Layout Version 2.5 Version.
G. Carboni – Muon Meeting – April 2002 Muon Meeting LHC schedule is now official (Council Committee) First protons (Pilot run) delayed to
Status of shaper prototype production B.G. Cheon (Hanyang U)‏ Dec. KEK 1 st open meeting of the Super KEKB Collaboration.
VVS Prototype Construction at Fermilab Erik Ramberg 26 February,2002 Design issues for VVS Details of VVS prototype design Schedule and Budget Testing.
Buying and Selling bonds IAF 12 Mr. Andrecyk. Bond Trading When buying or selling bonds on the secondary market, there are two very important components.
Update on the GRINCH Detector SBS meeting, 21 Oct 2015 T. Averett, W&M JLab, NC A&T, JMU, Glasgow Timing-based gas Cherenkov detector PMT array-510 tubes.
Road to SiD Test beam at LNF (Frascati) BTF 23 – 30 June. MarchAprilMay June July 22 June DEAD LINE June: Assembly of electronics parts over the PCB (APV25.
This is an example text TIMELINE PROJECT PLANNING DecOctSepAugJulyJuneAprilMarchFebJanMayNov 12 Months Example text Go ahead and replace it with your own.
IRC/SAC status Venelin Kozhuharov for the SAC/IRC working group NA62 Meeting
NSW SG 10 Dec Nov 2014 S. Zimmermann, NSW SG 1.
Korea Aerospace Research Institute (KARI)
【New Draft】 France -Japan International Co-funding Joint call Schedule (revised version) APR. 11, 2017 Bpifrance / NEDO final meeting (week of 18/9) Announcement.
Jan 2016 Solar Lunar Data.
SPF MAG Quarterly Report – Feb 2015

News about the WA104 Programme
Design of the He and HB ODU
Project timeline # 3 Step # 3 is about x, y and z # 2
Average Monthly Temperature and Rainfall
<Location> – <Project Name>, Sponsor: <name>
Status of the CBM Experiment – Key Dates for CBM Magnet

New Calorimeter Trigger Receiver Card (U. Wisconsin)



Gantt Chart Enter Year Here Activities Jan Feb Mar Apr May Jun Jul Aug
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
CMX scope and functionalities

FY 2019 Close Schedule Bi-Weekly Payroll governs close schedule
Proposed Strategic Planning Process for FY 2013/14 thru FY 2015/16
Calendar Year 2009 Insure Oklahoma Total & Projected Enrollment
MONTH CYCLE BEGINS CYCLE ENDS DUE TO FINANCE JUL /2/2015
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March


Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec ITEM 1 ITEM 2 ITEM 3
Electricity Cost and Use – FY 2016 and FY 2017

Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Buying and Selling Bonds
Text for section 1 1 Text for section 2 2 Text for section 3 3
ESSnet SAE project meeting Neuchatel, 7-8 July 2011
Text for section 1 1 Text for section 2 2 Text for section 3 3
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE

Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Software Update - Type approval related issues -
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Project timeline # 3 Step # 3 is about x, y and z # 2

2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
TEL031 ODL Analytics Main Activities
Presentation transcript:

Status of the development of Mini-Camera for the 1 st LST camera. Toko Konan Univ. Japan A test module for the 1 st LST camera, which is called Mini-Camera, is under development. 19 Cluster = 133 pixels Same components as 1 st LST camera except of Frontal Aluminum plate is 5 mm thickness instead of 25 mm. 750 x 750 mm

Purpose check mechanics of the Camera Test and verification for the Electric circuits and communications Develop software for the data acquisition system Schedule Design of the Mini-Camera is already done by Carlos Diaz Ginzo Q1 : Mechanics (rails, structure) is made in CIMAT Q2 : Dragon boards, PMT modules, Light Guide will come by May Backplane v2 (not final version), Trigger will be available after May (?) Q3 : Full camera development started. Trigger board will be available end of Backplane will come end of 2015.

Some remarks on the Mini-Camera Idea of the mini-camera was already exist since several years ago. Current mini-camera was proposed and discussed in Padova LST meeting Jul 2014 (although it might not be appropriate manner). It may not be enough time to reflect results of the test using mini-camera to the development of the Full camera. Full camera will be constructed in Spain. So mini-camera is crucially important for development work in Japan.

FPI/Electronics Schedule ComponentsP= Production Mini-Camera (19 clusters) Full-Camera (265 clusters) Light GuidePApr 2015Aug 2015 PMT+HV+PreAmpQCOct 2014Dec 2014 Slow Control BoardP & QCDec 2014May 2015 Dragon V5 PMar 2015July 2015 (Japan) July 2015 (Italy) QCApr 2015Sep 2015 (Japan) Dec 2015 (Italy) L0+L1 Trig. mezzanine PDec 2014Jul 2015 QCJun 2016 Backplane P V2 Dec 2014 V3.2 April 2016 QCMay Oct 2016 Trig. Interface Board P & QCMar 2015 Month when P/QC is completed Red=month when all components of a mini/full camera are ready

FPI/Electronics Schedule ComponentsP= Production Mini-Camera (19 clusters) Full-Camera (265 clusters) Light GuidePApr 2015Aug 2015 PMT+HV+PreAmpQCOct 2014Dec 2014 Slow Control BoardP & QCDec 2014May 2015 Dragon V5 PMar 2015July 2015 (Japan) July 2015 (Italy) QCApr 2015Sep 2015 (Japan) Dec 2015 (Italy) L0+L1 Trig. mezzanine (full budget) PDec 2014Jun 2015 QCMay 2015 Backplane (full budget) P V2 Dec 2014 V3.2 Sep 2015 QCMay Dec 2015 Trig. Interface Board P & QCMar 2015 Red=month when all components of a mini/full camera are ready If production/QC is accelerated by full budget,