June 24, 2013
The ASTM-CMU contract was renewed until The current financial status of the TMC will be part of the Administrative Guidance Committee report.
The TMC staff count is now at 15 full-time employees. The TMC is employing some temporary student help in our chem lab and warehouse group.
Test AreaNo.Issued ISB12-311/15/2012ACSW and ATWL Correction Factors IVA13-11/28/2013Critical Part Modification Statement IIIF13-12/6/ Correction to Section Corrected References for Rating Manuals and Workshop IIIG13-12/6/2013Correct Deposit Workshop Designation IVA13-22/8/2013 1) Increase in number of Runs Allowed on Heads and Engines 2) Alternate Engine Oil Cooler VG13-12/18/20131) Modifications to Test Hardware 2) Correct References to Rating Manuals and Workshops 3) Thread Modifications to Blocks and Weld Repair to RAC T /22/1013T-10A Calibration Period Change L /1/ Change to Supplier Information for Screen-Kut Sanding Paper 2. Use of Gear Rating Jig 3. Update Occurrences of CRC Manual 20 to ASTM Deposit Rating Manual 20 L /12/2013Correction factors for use in non-reference tests using V1L528 hardware IVA13-33/12/20131) Re-grinding of Cams 2) Test Method Clean-up Items OSCT13-13/19/2013Elastomer Batch Approval Requirement L /20/2013V1L528 Hardware Batch Operating Conditions Comment Text When Pitting/Spalling Exclusion Is Used For V1L528 Hardware HTCT13-14/2/2013Documentation of Tests Using Revised Range Clutch Synchronizer Components L /24/2013Inspection Port IIIF13-25/9/2013Use of Hours to 275% Viscosity Increase
Test TypeOil CodeQuantity (gallons) Sequence VID Flush Oil1155 Baseline Oil5995 Sequence IIIF Sequence IVA D5800 VOL12B55 VOL12C55 VOL12D55 VOL12E55
ACC-MA/ATC-ERC, these projects are now in their second year of the six-year contract period. GMOD test start-up is ongoing.