Detector Control System ELMB Production ATLAS DCS Evolution Different versions of ELMB Production strategy Radiation Qualification Testing Quality Assurance.

Slides:



Advertisements
Similar presentations
Status of Sensor and Hybrid Production LHCb Zurich Week T. Bowcock.
Advertisements

ITSF STORE BUSINESS SOLUTION PRESENTATION. STORE MODULE INCLUDES: Material Management Purchasing Components Handling Shipments Receiving of parts Store.
Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
Il sistema di HV del sottorivelatore DT S. Braibant, P. Giacomelli, M. Giunta, E. Borsato Bologna, 20/01/2007.
Peter Chochula, January 31, 2006  Motivation for this meeting: Get together experts from different fields See what do we know See what is missing See.
Molly, Gwyn, Sam, and Eric.  The EAGLE has landed- Keith bought us the version we need for a single user ($1500) and it’s now on Eric’s computer  All.
Uli Schäfer 1 JEM: Status and plans JEM1.2 Status Test results Plans.
LAr ROD Status Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Laurent, Eric, Jean-Pierre, Gilbert,... ATLAS Geneva DPNC January 12 th, 2005.
Uli Schäfer Discussions with H.B. after last meeting… All ATLAS standard racks and crates will be monitored. Helfrieds group will equip them with ELMBs.
Slide 1Rod Production presented by Jim Lamb (UCSB)April 9, 2004 Rod Production Rod Production, April , presented by Jim Lamb (UCSB)
Uli Schäfer 1 Production and QA issues Design Modules have been designed, with schematic capture and layout, in Mainz (B.Bauss) Cadence design tools, data.
VELO upgrade electronics – HYBRIDS Tony Smith University of Liverpool.
Ivan Pogrebnyak Supervisors: Paramonov, Drake, Proudfoot ATLAS, MSU, Argonne Tile week upgrade session June 10, 2015 TileCal requirements for ELMB upgrade.
Proposal of new electronics integrated on the flanges for LAr TPC S. Cento, G. Meng CERN June 2014.
DCS TCSG November 10th 1999, H.J.Burckhart1 Status of the general purpose I/O system LMB u DCS Architecture u LMB u Local Monitor Box (LMB) u Concept u.
TGC Big wheel Sector assembly plan Tatsuo Kawamoto ATLAS workshop 2005.
ATLAS ATLAS DCS H.J.Burckhart, Muon Electronics Meeting, December 11th Status of Embedded Local Monitor Board (ELMB) Overview Radiation tolerance.
Module 1, Part 3: Process validation Slide 1 of 22 © WHO – EDM – 12/2001 Validation Part 3: Process validation Supplementary Training Modules on Good Manufacturing.
Electronic Systems Support CAN Branch PSU Designed: Bjorn Halgren PH-ESS Responsible:Paul Harwood.
V. Cindro, Jožef Stefan Institute, Ljubljana, Slovenia DAQ, DCS, Power Supply and Cables Review CERN, March Electrical PP1 Basic features Electrical.
André Augustinus 17 June 2002 Technology Overview What is out there to fulfil our requirements? (with thanks to Tarek)
Evaporative Heater Design, qualification and planning M.Olcese PRR SCT off-detector cooling PRR SCT off-detector cooling March March 2005.
Pavel Šťavina, Bratislava 2004 Slovak contribution to experiment ATLAS  Even though Slovakia is small country with limited finances we have fulfilled.
Concluding Summary WBS1.1.2 SCT Subsystem A. Seiden BNL March 2001.
Radiation Tolerant Electronics New Policy? Ph. Farthouat, CERN.
Etam Noah, CERN15 th September 2004Qualification of the CMS Digital Optohybrid Outline: CMS optical digital control links DOH components DOH history and.
SCT Week 2 Oct 2002N.P. Hessey NIKHEF1 Status ATLAS SCT 2002 NIKHEF Contributions to ATLAS: Magnets – discussed by Frank Trigger DCS Muon MDT and alignment.
LHC Quality Assurance Working Group - M. Mottier September 2000.
ATLAS ATLAS DCS B.Hallgren, CERN EP/ ATI PRR CERN 4 March the Embedded Local Monitor Board ELMB Design description of the Embedded Local Monitor.
17/6/2002Ivan Hruska,Francisca Calheiros,Bruno Allongue 1 TILECAL brick development Projected parameters design should fit the volume 160 x 40 x 50mm to.
Michał Dwużnik, for the SCT collaboration
Radiation Tolerant Electronics Expected changes Ph. Farthouat, CERN.
VALIDATIONS: TOWARDS RELAIBLE QUALITY OUTCOMES DR. SHIVPRAKASH MANAGING DIRECTOR SYNCHRON RESEARCH SERVICES PVT. LTD., INDIA.
IDE DCS development overview Ewa Stanecka, ID Week, CERN
Alice DCS workshop S.Popescu 1 1. News from TPC DCS cooling prototype Project overview: Aim of the prototype: investigating and developing standard.
Gas System production for LHC detectors Stefan Haider EP / TA1 - Gas.
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
Reliability Applied to KM3NET
ATLAS DCS ELMB PRR, CERN, March 2002Fernando Varela ELMB Networks CAN/CANopen Interoperability of the ELMB Usage of the ELMB in ATLAS ELMB Networks Full.
5th March 0718th DCS Workshop1 News on ISEG & WIENER Lionel Wallet, CERN High Voltage, Low Voltage & VME Crate control.
March 19, 2013W. Bertl, PSI Status of BPIX Cooling Activities W. Bertl, PSI.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
Tecnologica Componentes Electrónicos, S.A. Workshop - Laser diodes in Space Slide No: 1 Date: May 11 – 12, 2006 Componentes Electrónicos, S.A. Juan Barbero.
Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov P. Bonneau TS/CV/Detector Cooling CONTENTS Overall statusOverall status Cooling plant.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
AFP Trigger DAQ and DCS Krzysztof Korcyl Institute of Nuclear Physics - Cracow on behalf of TDAQ and DCS subsystems.
For more information, please contact 14/12/2010 EN/CV/DC Technical specification IT-3684 by Elena Perez Rodriguez.
Chapter 19 Manufacturing and Quality Control
Status of the DCS Richard Brenner (Uppsala University) " Structure of the DCS " Cabling of DCS sensors " Interlock " Status and near future plans.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
Distributed Low Voltage Power Supply System for Front End Electronics of the TRT Detector in ATLAS Experiment E.Banaś a, P.Farthouat b, Z.Hajduk a, B.Kisielewski.
EMCAL Calibration & Assembly at Yale University Mark Heinz, Project Mgr EMCAL Meeting Nantes July 15, 2008.
ATLAS DCS ELMB PRR, March 4th 2002, H.J.Burckhart1 Embedded Local Monitor Board ELMB  Context  Aim  Requirements  Add-ons  Our aims of PRR.
Electronics for CEDAR Cristina Lazzeroni, Marian Krivda, Richard Staley, Xen Serghi, Karim Massri University of Birmingham, UK 3/5/
G. Ruggiero / TOTEM 1 Si Edgeless Detectors in the RPs Edgeless detector (on the old “AP25 module”) active edges (“planar/3D”) planar tech. with CTS (Current.
1 Single event upset test of the voltage limiter for the ATLAS Semiconductor tracker TSL Experiment Number: F151 distance between power supplies and modules.
ATLAS DCS Workshop on PLCs and Fieldbusses, November 26th 1999, H.J.Burckhart1 CAN and LMB in ATLAS u Controls in ATLAS u CAN u Local Monitor Box u Concept.
IRC/SAC status Venelin Kozhuharov for the SAC/IRC working group NA62 Meeting
110 th November 2010EN/CV/DC Detector Cooling Project - advancement status of Work Package N3 Thermosiphon project Michele Battistin 18 May 2011.
Requested hardware for Clermont-Ferrand in the test beam 2015 September 23 Roméo Bonnefoy and François Vazeille This material is provided by LPC and Collaboration:
QCG Report Francesco Forti University and INFN, Pisa.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
Detector building Notes of our discussion
Upgrade activities at Clermont-Ferrand
Test Beam Request for the Semi-Digital Hadronic Calorimeter
Outline Introduction to LHC Power Converters Remaining Inventory Observed Availability New inventory – FGClite Cumulative & SEE Effects Maintenance.
T1 Electronic status Conclusions Electronics Cards:
Gary Hughes, South Oakleigh College
Presentation transcript:

Detector Control System ELMB Production ATLAS DCS Evolution Different versions of ELMB Production strategy Radiation Qualification Testing Quality Assurance Procedure for failure Conclusion

ATLAS DCS ELMB Product Readiness Review - ELMB Production, March 2002, J.Cook 2 LMB (50 modules) –Component pre-selection ELMB v1 (20 modules) –PCB had 8 layers ELMB v2 (300 modules) –6 layers –Class 6 One more iteration required –Final check PCB Evolution

ATLAS DCS ELMB Product Readiness Review - ELMB Production, March 2002, J.Cook 3 ELMB Versions ELMB comes in two “flavours” –With ADC –Without ADC Same software supplied on both versions –Non-standard software must be loaded by user if required Same tests performed (with exception of ADC)

ATLAS DCS ELMB Product Readiness Review - ELMB Production, March 2002, J.Cook 4 Costing (Side A)

ATLAS DCS ELMB Product Readiness Review - ELMB Production, March 2002, J.Cook 5 Costing (Side B and Total)

ATLAS DCS ELMB Product Readiness Review - ELMB Production, March 2002, J.Cook 6 Costing (BergStak connectors) Price comparison for the BergStak connectors

ATLAS DCS ELMB Product Readiness Review - ELMB Production, March 2002, J.Cook 7 Batch production –Plan just one or two batches Expected number produced in first batch, if more required, a second batch produced –Plan many, smaller batches As more required, a new batch is produced First batch - earliest available start main sensitive components bought in one go as homogeneous lots Production Strategy

ATLAS DCS ELMB Product Readiness Review - ELMB Production, March 2002, J.Cook 8 25 ELMBs manufactured –components will be randomly selected from the purchased homogeneous lots Tests completed at Louvain-la-Neuve Radiation Qualification

ATLAS DCS ELMB Product Readiness Review - ELMB Production, March 2002, J.Cook 9 Main testing done at production site –A number of modules on one bus –Programmed simultaneously –Tested all at once Acceptance testing completed at CERN –Statistical testing only –Only verification required as full testing had been completed at production site Testing

ATLAS DCS ELMB Product Readiness Review - ELMB Production, March 2002, J.Cook 10 Current numbers of available ELMBs low May require pre-production series –non-radiation qualified –for use in USA15 only Acceptance Testing

ATLAS DCS ELMB Product Readiness Review - ELMB Production, March 2002, J.Cook 11 Component pre-selection completed using LMB in radiation tests Design has been proven in test beams Full radiation pre-qualification done Further testing in “realistic” radiation environment (TCC2) Quality Assurance

ATLAS DCS ELMB Product Readiness Review - ELMB Production, March 2002, J.Cook 12 “Guarantee” for an initially working module Modules are seen as consumables –Failure will be investigated –Recurring problems will be repaired For cost effectiveness Procedure for Failure

ATLAS DCS ELMB Product Readiness Review - ELMB Production, March 2002, J.Cook 13 Before tendering –Pledges necessary from users Numbers required Commitment to purchase Time-scale –How many by when? Conclusion