MuTr Shutdown Work Rusty Towell for And JUNE 22, 2004 at the Muon Physics and Forward Upgrades Workshop.

Slides:



Advertisements
Similar presentations
Davide Piccolo INFN Napoli Muon Annul Review Cern 15 September 2003 Chamber Production QA/QC MUON ANNUAL REVIEW On RESISTIVE PLATE CHMABERS CERN, 15 September.
Advertisements

Post Run13 MuTR/MuTrig Maintenance 1. Cathode Cable in mis-contact : South Station-1 Oct-5, Gap-2 2.
MuTr/MuTrig Performance of Run13 RIKEN/RBRC Itaru Nakagawa 1.
M. Dracos LNGS, 03 August Target Tracker. M. Dracos LNGS, 03 August Rate tests SM1 Sensor (1,3,4) no signal Plane 6 absent Sensor (1,2,7)
RPC Electronics Status Overall system TDC –Digitizing frequency issue (determine the bin size of the TDC value) Discriminator test result Trigger module.
13 January All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 January 6-12 We had to sacrifice.
Run10 Preparation Status and Issues Itaru Nakagawa RIKEN/RBRC.
MUON piquet report 18/9 -24/ Nikolai Bondar.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Jun 4, 2012.
Jon S Kapustinsky 11/17/2010 Jon S Kapustinsky FVTX Commissioning Plan 1.71 Jon S Kapustinsky 1.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester July 8, 2013.
Andrew Glenn 4/21/02 Commissioning and Performance of the. Muon Identifier Andrew Glenn (University of Tennessee), for the PHENIX collaboration April APS.
Plans for the 2015 Run Vito Palladino Straw Working Group 2/2/2015.
Run11 MuTrig-FEE Summary RIKEN/RBRC Itaru Nakagawa 1.
AIDA FEE64 development report August 2010 Progress after Texas CAD work Manufacturing 25th August
PHENIX upgrade DAQ Status/ HBD FEM experience (so far) The thoughts on the PHENIX DAQ upgrade –Slow download HBD test experience so far –GTM –FEM readout.
String-18 New-DAQ Commissioning Azriel Goldschmidt AMANDA Collaboration Meeting Berkeley, March 2002.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 17, 2013.
HBD FEM the block diagram preamp – FEM cable Status Stuffs need to be decided….
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
STAR Collaboration Meeting, Nantes Alexandre A. P. Suaide Wayne State University Slide 1 EMC Commissioning for the run Review of last.
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
UF –PNPI HV system status August 2008 Sergey Volkov Nikolai Bondar PNPI.
On behalf of joint ITEP / IHEP team: A. Arefiev, N. Filimonov, T. Kvaratskheliya, I. Machikhiliyan, P. Shatalov, T. Zakoryuchkina, A. Zhokhov, S. Zvyagintsev.
1 The PHENIX Muon Identifier Front End Electronics Andrew Glenn (University of Tennessee), for the PHENIX collaboration Andrew Glenn 5/1/01 April APS Meeting.
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
HBD electronics status All the ADC and XMIT boards are installed. –Top 3 crates are for the ADC, XMIT boards –Bottom crate is for test pulse boards/future.
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
Outline:  Hw status (on the basis of last LED data);  Plans / requests; ECAL: status and plans.
D0 PMG 6/15/00 PMG Agenda June 15, 2000  Overview (Tuts) u Detector status u Reportable milestones u Financial status u Summary  Response to DOE review.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
PHENIX WEEKLY PLANNING 3/22/2007 Don Lynch. 3/22/2007 Weekly Planning Meeting 2 Schedule Re-Start 5 man shifts 3/20/07 Beam: blue ring 3/8/07, in yellow.
Shiuan-Hal,Shiu To-do-list and schedule 1. Things need to do before beam comes 2 Generate new trigger matrix for test beam base on the final geometry.(1)
Muon Tracker Responsibilities This Year South arm commissioning through this year’s run Analysis Software oversight and development North Arm station 2.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
1 Onsite Status Itaru Nakagawa RIKEN/RBRC. 2 Schedule.
10/2/2002MJL - MuTr DC Report Muon Tracking Status South North.
March 25, FVTX Monthly/Quarterly Report June, 2009 Technical Status, Cost & Schedule Melynda Brooks, LANL.
HBD Report Craig Woody BNL DC Meeting January 7, 2009.
Performance and Early Results from the Muon Tracking System of Rusty Towell of Abilene Christian University for the PHENIX collaboration First Joint Meeting.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
Overview of PHENIX Muon Tracker Data Analysis PHENIX Muon Tracker Muon Tracker Software Muon Tracker Database Muon Event Display Performance Muon Reconstruction.
MuTRG Channel map summary June 30, 2008 Tsutomu Mibe KEK 1.
MuTrig-FEE Install Status RIKEN/RBRC Itaru Nakagawa 1.
All Experimenters MeetingDmitri Denisov Week of July 22 to July 29 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 3.1pb -1 u Live:
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
Evelyn Thomson Ohio State University Page 1 XFT Status CDF Trigger Workshop, 17 August 2000 l XFT Hardware status l XFT Integration tests at B0, including:
Plans for the 2015 Run Michal Koval, Peter Lichard and Vito Palladino TDAQ Working Group 25/3/2015.
1 Installation Status Remaining Issues RIKEN/RBRC Itaru Nakagawa.
Onsite Report Itaru Nakagawa RIKEN/RBRC. Schedule.
Study of polarized sea quark distributions in polarized pp collisions at sqrt(s)=500GeV with PHENIX Oct. 10, 2008 Tsutomu Mibe (KEK) for the PHENIX collaboration.
Muon Trigger Performance Run12 PP510GeV Sanghwa Park (SNU/RIKEN)
Preparation for Run10 RIKEN/RBRC Itaru Nakagawa. TLD badges (to be replaced every two weeks) Location of dosimeters in MuTr.S St.1 TK361 TK362 TK363 TK364.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 3, 2013.
FVTX High Multiplicity Trigger for Run15
Vito Palladino Straw Working Group 23/3/2015
A New Clock Distribution/Topology Processor Module for KOTO (CDT)
Pixel Status Mar 12nd 2012 Maki KUROSAWA RBRC.
Hall A Compton Electron detector overview
Radiation Laboratory Meeting
University of California Los Angeles
RPC Front End Electronics
Seyoung Han / Ewha Woman’s Univeristy
RPC FEE The discriminator boards TDC boards Cost schedule.
Schedule after Shutdown
RPC Electronics Overall system diagram Current status At detector
The LHCb Front-end Electronics System Status and Future Development
Presentation transcript:

MuTr Shutdown Work Rusty Towell for And JUNE 22, 2004 at the Muon Physics and Forward Upgrades Workshop

Santa Fe Muon Meeting2 June 22, 2004 Disclaimers I’m only reporting on work being done I have not done all of this work But … I’m glad to help where there is a need I’m at BNL until the first of August Donald Isenhower and 2 ACU students are also available to help.

Santa Fe Muon Meeting3 June 22, 2004 Outline From Mike’s on June 2, ) HV problems in station-1 north 2) problems in south sta-3 oct-7 3) LV distribution control replacement 4) FPGA code 5) Building more spare RX cards 6) Optical alignment DAQ replacement 7) Dallas chip readout software rework

Santa Fe Muon Meeting4 June 22, 2004 HV problems in station-1 north Water leak found last Friday Fixed by John T. It was a small hose from the ‘can manifold’ to a FEM. It was marked as bad???? Other issues??? “check for leak north sta-1 oct-6 gap-3”

Santa Fe Muon Meeting5 June 22, 2004 problems in south sta-3 oct-7 All 3 boards in one FEM replaced by Imran. Problem seems to be solved, but … It was an intermittent problem

Santa Fe Muon Meeting6 June 22, 2004 LV distribution control replacement ACU group working on this. Thanks to all who have been replying to s. Your continued input is appreciated.

Santa Fe Muon Meeting7 June 22, 2004 LV Distribution Cards - Outputs South card number 24 was again replaced this year. Sal investigated the problem of overheating on the board. His conclusion was that the connector was the cause. The connector on the power cable for the south card numbers 8, 10, 20, and 24 were replaced. Every card for the south arm received an application of the stabilant. In north only cards received the stabilant because we decided cards 1-20 were too risky to touch due to the number of cables.

Santa Fe Muon Meeting8 June 22, 2004 Remaining power distribution issues or non-issues The power cables to south card 26 and 27 are swapped. Should this be changed? The plastic molex guard/connector was missing on north card 30. South card 14 has output channel 1 disconnected and its associated cable is plugged into channel 9 of the distribution card.

Santa Fe Muon Meeting9 June 22, 2004 LVD Control Transition to ADAM LVD Board Count  North: 34  South: channels per LVD board, but not all in use ADAM modules 16-bit Clean mapping:  3 LVD boards per 2 ADAM module Leaves 16th channel blank  Requires 23 modules for North, 21 for South

Santa Fe Muon Meeting10 June 22, 2004

Santa Fe Muon Meeting11 June 22, 2004

Santa Fe Muon Meeting12 June 22, 2004 GUI for Control of ADAM Modules Currently in process of constructing GUI to turn on/off correct groups of channels Should have:  Master On/Off toggle for North and South Power up all FEMs/Glink2Clinks/Cameras Correct order and with necessary timing delay  Also ability to power up octants individually This is the last piece we need before the change-over will start.

Santa Fe Muon Meeting13 June 22, 2004 LV change-over schedule The ACU students are working on the GUI this week. The north ADAMS modules are ready to install. The mapping is complete. The required modification to the cables is understood. Work should start on the north arm next week. South arm will wait until the north arm is complete and for 4 more ADAMS modules. Work will be completed before the end of July.

Santa Fe Muon Meeting14 June 22, 2004 FPGA code Work still on going Downloads but doesn’t work. (?) General agreement that the lamp shade can be replaced.  s from Ed and Doug suggest that this will happen this week.

Santa Fe Muon Meeting15 June 22, 2004 Building more spare RX cards ????? “Steve Boose ready to proceed 10 more to be built” - Mike

Santa Fe Muon Meeting16 June 22, 2004 Optical alignment DAQ replacement Work to be done in August. After LV work is finished.

Santa Fe Muon Meeting17 June 22, 2004 Dallas chip readout software rework Currently, the Dallas-chip readout software reads out every chip from every node and charts the results in a ROOT histogram. Advantages:  it works now  it allows at-a-glance checking of the trend Disadvantages:  no way to track an individual sensor  no historical record  slow to read (each node has to read outs its chips serially)

Santa Fe Muon Meeting18 June 22, 2004 Dallas chip readout software rework (2) Planned work:  write a new interface that allows for reading out a signal chip  Archive data to the database (this will allow viewing with strip charts) This work is dependent on John H. having the time to help Christopher Smith. John’s question for us,  “Does reading out the Dallas chips increase the noise in the FEE?”  John believes that for this to be a useful system, it should run automatically and constantly.

Santa Fe Muon Meeting19 June 22, 2004 Questions? Does anyone know of work that needs to be done that has not been covered? I’m at BNL until the first of August Donald Isenhower and 2 ACU students are also available to help.

Santa Fe Muon Meeting20 June 22, 2004