© K.Cuthbertson, D. Nitzsche FINANCIAL ENGINEERING: DERIVATIVES AND RISK MANAGEMENT (J. Wiley, 2001) K. Cuthbertson and D. Nitzsche Lecture Asset Price.

Slides:



Advertisements
Similar presentations
Chapter 12: Basic option theory
Advertisements

Black-Scholes Equation April 15, Contents Options Black Scholes PDE Solution Method.
Options, Futures, and Other Derivatives, 6 th Edition, Copyright © John C. Hull The Black-Scholes- Merton Model Chapter 13.
Chapter 14 The Black-Scholes-Merton Model
By: Piet Nova The Binomial Tree Model.  Important problem in financial markets today  Computation of a particular integral  Methods of valuation 
Basic Numerical Procedures Chapter 19 1 資管所 柯婷瑱 2009/07/17.
L7: Stochastic Process 1 Lecture 7: Stochastic Process The following topics are covered: –Markov Property and Markov Stochastic Process –Wiener Process.
Derivatives Inside Black Scholes
4.1 Option Prices: numerical approach Lecture Pricing: 1.Binomial Trees.
Chapter 20 Basic Numerical Procedures
Options and Speculative Markets Introduction to option pricing André Farber Solvay Business School University of Brussels.
Numerical Methods for Option Pricing
Ch. 19 J. Hull, Options, Futures and Other Derivatives Zvi Wiener Framework for pricing derivatives.
Options and Speculative Markets Inside Black Scholes Professor André Farber Solvay Business School Université Libre de Bruxelles.
Pricing an Option Monte Carlo Simulation. We will explore a technique, called Monte Carlo simulation, to numerically derive the price of an option or.
Copyright K.Cuthbertson, D. Nitzsche 1 FINANCIAL ENGINEERING: DERIVATIVES AND RISK MANAGEMENT (J. Wiley, 2001) K. Cuthbertson and D. Nitzsche Lecture VaR:
Asset Pricing Theory Option A right to buy (or sell) an underlying asset. Strike price: K Maturity date: T. Price of the underlying asset: S(t)
Binnenlandse Francqui Leerstoel VUB Black Scholes and beyond André Farber Solvay Business School University of Brussels.
©K.Cuthbertson and D.Nitzsche 1 FINANCIAL ENGINEERING: DERIVATIVES AND RISK MANAGEMENT (J. Wiley, 2001) K. Cuthbertson and D. Nitzsche LECTURE Dynamic.
© K. Cuthbertson and D. Nitzsche Figures for Chapter 17 ASSET PRICE DYNAMICS (Financial Engineering : Derivatives and Risk Management)
Chapter 14 The Black-Scholes-Merton Model Options, Futures, and Other Derivatives, 8th Edition, Copyright © John C. Hull
Derivatives Introduction to option pricing André Farber Solvay Business School University of Brussels.
Zvi WienerContTimeFin - 9 slide 1 Financial Engineering Risk Neutral Pricing Zvi Wiener tel:
Diffusion Processes and Ito’s Lemma
Zheng Zhenlong, Dept of Finance,XMU Basic Numerical Procedures Chapter 19.
Valuing Stock Options:The Black-Scholes Model
11.1 Options, Futures, and Other Derivatives, 4th Edition © 1999 by John C. Hull The Black-Scholes Model Chapter 11.
1 The Black-Scholes-Merton Model MGT 821/ECON 873 The Black-Scholes-Merton Model.
Advanced Risk Management I Lecture 6 Non-linear portfolios.
18.1 Options, Futures, and Other Derivatives, 5th edition © 2002 by John C. Hull Numerical Procedures Chapter 18.
Investment Analysis and Portfolio Management Lecture 10 Gareth Myles.
Simulating the value of Asian Options Vladimir Kozak.
Wiener Processes and Itô’s Lemma Chapter 12 1 Options, Futures, and Other Derivatives, 7th Edition, Copyright © John C. Hull 2008.
Chapter 13 Wiener Processes and Itô’s Lemma
10.1 Options, Futures, and Other Derivatives, 4th edition © 1999 by John C. Hull Model of the Behavior of Stock Prices Chapter 10.
Black Scholes Option Pricing Model Finance (Derivative Securities) 312 Tuesday, 10 October 2006 Readings: Chapter 12.
Modelling stock price movements July 31, 2009 By: A V Vedpuriswar.
Valuing Stock Options: The Black- Scholes Model Chapter 11.
1 MGT 821/ECON 873 Numerical Procedures. 2 Approaches to Derivatives Valuation How to find the value of an option?  Black-Scholes partial differential.
1 Chapter 19 Monte Carlo Valuation. 2 Simulation of future stock prices and using these simulated prices to compute the discounted expected payoff of.
Fundamentals of Futures and Options Markets, 7th Ed, Ch 13, Copyright © John C. Hull 2010 Valuing Stock Options: The Black-Scholes-Merton Model Chapter.
Basic Numerical Procedures Chapter 19 1 Options, Futures, and Other Derivatives, 7th Edition, Copyright © John C. Hull 2008.
© K. Cuthbertson, D. Nitzsche FINANCIAL ENGINEERING: DERIVATIVES AND RISK MANAGEMENT (J. Wiley, 2001) K. Cuthbertson and D. Nitzsche Lecture Pricing Interest.
Basic Numerical Procedure
A Cursory Introduction to Real Options Andrew Brown 5/2/02.
Fundamentals of Futures and Options Markets, 5 th Edition, Copyright © John C. Hull Binomial Trees in Practice Chapter 16.
Chapter 20 Brownian Motion and Itô’s Lemma.
13.1 Valuing Stock Options : The Black-Scholes-Merton Model Chapter 13.
The Black-Scholes-Merton Model Chapter 13 Options, Futures, and Other Derivatives, 7th International Edition, Copyright © John C. Hull
Monte-Carlo Simulations Seminar Project. Task  To Build an application in Excel/VBA to solve option prices.  Use a stochastic volatility in the model.
Valuing Stock Options:The Black-Scholes Model
Chapter 19 Monte Carlo Valuation. Copyright © 2006 Pearson Addison-Wesley. All rights reserved Monte Carlo Valuation Simulation of future stock.
The Black- Scholes Equation
Chapter 14 The Black-Scholes-Merton Model 1. The Stock Price Assumption Consider a stock whose price is S In a short period of time of length  t, the.
Chapter 13 Wiener Processes and Itô’s Lemma 1. Stochastic Processes Describes the way in which a variable such as a stock price, exchange rate or interest.
Chapter 19 Monte Carlo Valuation. © 2013 Pearson Education, Inc., publishing as Prentice Hall. All rights reserved.19-2 Monte Carlo Valuation Simulation.
Chapter 14 The Black-Scholes-Merton Model
The Black-Scholes-Merton Model
Chapter 19 Monte Carlo Valuation.
Binomial Trees in Practice
DERIVATIVES: Valuation Methods and Some Extra Stuff
Mathematical Finance An Introduction
The Black-Scholes-Merton Model
Chapter 15 The Black-Scholes-Merton Model
Valuing Stock Options: The Black-Scholes-Merton Model
Monte Carlo Valuation Bahattin Buyuksahin, Celso Brunetti 12/8/2018.
Binomial Trees in Practice
Chapter 14 Wiener Processes and Itô’s Lemma
Chapter 15 The Black-Scholes-Merton Model
Valuing Stock Options:The Black-Scholes Model
Presentation transcript:

© K.Cuthbertson, D. Nitzsche FINANCIAL ENGINEERING: DERIVATIVES AND RISK MANAGEMENT (J. Wiley, 2001) K. Cuthbertson and D. Nitzsche Lecture Asset Price Dynamics Version 1/9/2001

© K.Cuthbertson, D. Nitzsche Stochastic Processes: Weiner, Ito, GBM, Black-Scholes PDE RNV and Monte Carlo Simulation Finite Difference Methods TOPICS

© K.Cuthbertson, D. Nitzsche Stochastic Processes: Weiner, Ito, GBM Black-Scholes, PDE

© K.Cuthbertson, D. Nitzsche Weiner Process [17.3]  z =   t [17.4a] Expected ValueE(  z) = 0 [17.4b] Variancevar(  z) = E(  z) 2 =  t [17.4c] Standard Deviationstd(  z) =  t Generalised Weiner Process  x = a  t + b  z = a  t + b   t E(  x) = a  t var(  x) = b 2  t Ito Process dx = a(x,t) dt + b(x,t) dz Weiner Process

© K.Cuthbertson, D. Nitzsche Geometric Brownian Motion [17.16b]dS/S =  dt +  dz GBM is Ito process with a =  S and b =  S Ito’s Lemma If S follows an Ito process then the stochastic differential equation (SDE) for any function  (S,t)~ option premium) Substitute for dS from [17.20] [17.22] GBM and Ito’s Lemma

© K.Cuthbertson, D. Nitzsche Ito’s eqn for f(S,t) a =  S, b=  S Futures price: F = Se r(T-t) The stock price follows a GBM: dS = (  S)dt + (  S) dz Substituting in Ito’s eqn above: dF = [ e r(T-t) (  S) – r S e r(T-t) ] dt + e r(T-t) (  S) dz Substituting F = Se r(T-t) dF = (  - r)F dt +  F dz which is a GBM for dF/F with drift rate (  - r) and variance rate . Table 17.1 : SDE for Future’s Prices using Ito’s Lemma

© K.Cuthbertson, D. Nitzsche Replication portfolio of stocks and bonds mimics the payoff of derivative security thus offsetting any uncertainty dz inherent in the derivative security, taken in isolation. The resulting equation (see appendix 17.2) for the price of the derivative security is deterministic (ie. non-stochastic) and is known as the Black-Scholes PDE [17.48a] This PDE can be solved by standard methods, to give the B-S closed form solution for the derivatives price. Black-Scholes PDE

© K.Cuthbertson, D. Nitzsche Value of the forward contract:see chapter 2 [17.55]f = S - Ke -r(T-t) Substituting Black-Scholes PDE and using [17.55] The LHS of the Black-Scholes equation becomes : [17.57]r[-Ke -r(T-t) + S] = r f Hence f satisfies the PDE Does a Forward Contract Obey B-S, PDE ?

© K.Cuthbertson, D. Nitzsche  Assume dS/S follows a GBM with drift rate  and variance rate,  2  Use Ito’s lemma to obtain the stochastic process for d( ln S ) d(ln S) = dt +  dzwhere =  -  2 /2. Because dz is N(0,1) then the distribution of ln(S) is normal (and S is lognormal) with ln(S T /S o ) ~ N( T,     Statistical distribution theory then indicates that the level of S T has mean and variance ES T = S o e  T var(S T ) = Table 17.2 : From GBM for dS/S to the properties of S

© K.Cuthbertson, D. Nitzsche Risk Neutral Valuation, RNV and Monte Carlo Simulation, MCS

© K.Cuthbertson, D. Nitzsche When pricing an option it is valid to use q as the probability of an ‘up’ move ~this is equivalent to the stock price growing at the risk free rate r However, the resulting value for the option premium, is valid in the real world. Risk Neutral Valuation, RNV

© K.Cuthbertson, D. Nitzsche Step 1: Assume the expected return of the underlying asset (eg. stock) equals the risk free rate. (For example, for the BOPM this involves using q as the probability of an ‘up’ move, which is consistent with S growing at the risk free rate r) Step 2: Calculate the expected payoff from the derivative at maturity Step 3: Discount the expected payoff at the risk free rate to obtain the price of the derivative Risk Neutral Valuation, RNV

© K.Cuthbertson, D. Nitzsche Under RNV the call premium is : [17.74]C = e -rT E* [max(S T - K, 0)] Generate S [17.77a]S t = [1 +   t +  t  t  S t-1 [17.77b]S t = S t-1 exp[(  -  2 /2)  t +  t  t  [17.80]Payoff-C (1) = max {0, - 100} = After m-runs: [17.81] Hedge Parameters MCS for Option Premia (Excel T17.4+Gauss)

© K.Cuthbertson, D. Nitzsche dS = ( r-  ) S dt + S (  V ) dz s dV = b (V m - V) dt + (  V  ) dz v V m = long run value of volatility of stock return dz s dz v =  dt b,  and  are parameters to be estimated Stochastic Volatility and MCS

© K.Cuthbertson, D. Nitzsche Antithetic Variables Each time we draw a value for  we also use -  Both are used to generate new values for the stock price. We therefore get “two stock prices for the ‘price’ of one random draw” This technique can be applied to any symmetric distribution So in any run we have two option payoffs using +  and using -  We then take the average of the two payoffs as the payoff for that simulation Variance Reduction Methods

© K.Cuthbertson, D. Nitzsche Control Variate Method To calculate value of a ‘complex’ option-A,  A MCS ‘Simple’ option-B whose value by B-S =  B BS Now value option-B using MCS giving  B MCS (its value would be close to but not equal to  B BS (because of MCS sampling error) Control variate technique adjusts  A MCS depending on how big the error is in the MCS valuation of option-B The ‘new and improved’ estimate for option-A is Variance Reduction Methods

© K.Cuthbertson, D. Nitzsche Finite Difference Methods

© K.Cuthbertson, D. Nitzsche Approximate the continuous time B-S, PDE using numerical derivatives on a ‘grid’ Impose boundary conditions Put Option At S=0 then f = K e -rt and at S>>K then then f = 0 Solve the PDE using numerical methods Finite Difference Methods

© K.Cuthbertson, D. Nitzsche Figure 17.3 :Approximations for  f /  S S f SS SS Central difference Backward difference Forward difference Derivative required for this point f i+1 fifi f i-1

© K.Cuthbertson, D. Nitzsche Figure 17.2 :Use of grid points Differential with respect to S (index for S is i ) Value of option, f(S,t) (index for t is k) Differential with respect to time (Note: as k increases t decreases) f i k+1   f i k f k i+1  f i k  f k i-1  Central difference forward difference backward difference  f k i+1  f i k  f k i-1 f i k+1 

© K.Cuthbertson, D. Nitzsche Figure 17.1 : Finite difference grid T tt time, t (index k = T - k  t ) SS Current Stock Price: S = 4(DS). Hence value of f 4 0 will be solution for the option premium. f 3 6 is determined by the values of f at points A, B and C 0 Stock Price (index i) 4 A B C

© K.Cuthbertson, D. Nitzsche One of the nodes on the left vertical axis will coincide with the current stock price and the solved value for f at this same node will be the option premia S = i(  S), t = T-k(  t) at k = 0, then t = T (ie. expiry) and as k increases, real time t decreases. [17.87] Finite Difference Methods

© K.Cuthbertson, D. Nitzsche From [17.87] note that we can calculate the value of f i k+1 once we know the values of f at time k for the three nodes i, i-1 and i+1 (figure 17.1). Solve for f i k+1 by working backwards through the grid (once we have the terminal conditions) ~ explicit finite difference method. American Compare f i k+1 with the payoff to early exercise K-S = K - i  S at each node, and take the max. value. Finite Difference Methods

© K.Cuthbertson, D. Nitzsche LECTURE ENDS HERE