Highlights and discussion at LAL FKPPL & FJPPL “Toshiko Yuasa” workshop Philip Bambade Laboratoire de l’Accélérateur Linéaire Université Paris 11, Orsay,

Slides:



Advertisements
Similar presentations
Brett Parker* BNL-SMD *For the ATF2 Superconducting Magnet Upgrade Collaboration Update on SC Magnets and Schedule.
Advertisements

Sha Bai, Philip Bambade, Glen White FJPPL – FKPPL ATF2 workshop LAL, 11~13 February, 2013 Orthogonality of beam waist corrections in the presence of IPBSM.
ATF2 Interaction Point Beam Size Monitor (Shintake Monitor) Status T. Yamanaka, M. Oroku, Y. Yamaguchi, S. Komamiya ( Univ. of Tokyo ), T. Suehara, Y.
Study of alternative optical parameters for the ILC final focus On-going work and plans Philip Bambade Laboratoire de l’Accélérateur Linéaire Université.
IPBPM piezo-mover system and plans for in situ monitoring of calibration and stability Current status and plan for ATF2 Philip Bambade Laboratoire de l’Accélérateur.
-brief report of October runs and some inputs for the Nov/Dec planning – Nobuhiro Terunuma, KEK, ATF ATF session on LCWS13, Tokyo Univ., Nov. 13, 2013.
ATF2 Progress Report For CLIC Workshop Kiyoshi KUBO.
ATF2 Status and Plan K. Kubo ATF2, Final Focus Test for LC Achievement of 37 nm beam size (Goal 1) – Demonstration of a compact final focus.
Status of ATF2 final focus prototype ( emphasizing French involvement ) Collaboration with China : Jie GAO, Sha BAI (IHEP, Beijing) Philip Bambade LAL-Orsay.
1.Beam Tuning Simulation 2.IP Beam Position Stability 2-1 ) Magnet Vibration 2-2 ) IP position jitter subtraction for 2 nd bunch with FONT feedback 2-3.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis, Colin Perry.
1 ATF2 - IP Chamber Design and manufacturing of Chamber with high precision piezo actuators for high resolution BPMs Status / progress report – 26 June.
News from ATF2 Frank Zimmermann KEK visit, February 2012 Thanks to P. Bambade, M. Barnes, A. Faus-Golfe, K. Kubo, S. Kuroda, T. Naito, T. Okugi,
Discussion on Milestone and schedule Toshiyuki Okugi ATF2 commissioning meeting 1 / 7 / 2009.
ATF2: the linear collider final focus prototype at KEK - an international telescope for nanometre size beams - Philip Bambade Laboratoire de l’Accélérateur.
Personal strategy for ATF2 beam operation in 2009 Toshiyuki OKUGI 2009 / 7 /22 ATF2 weekly meeting.
ATF2 commissioning in Autumn 2009 for discussion Philip Bambade LAL & KEK LCWS09 BDS session Albuquerque, New Mexico October 1, 2009 on behalf of the commissioning.
ATF2 optics … 1 3 rd Mini-Workshop on Nano Project at ATF ATF2 optics, tuning method and tolerances of initial alignment, magnets, power supplies etc.
Technical Board ATF2 GM FF progress report A.Jeremie ATF2 GM System team: K.Artoos, C.Charrondière, A.Jeremie, J.Pfingstner (a lot of figures from him),
New IP chamber for ATF2 goal 2 Philip Bambade Laboratoire de l’Accélérateur Linéaire Université Paris 11, Orsay, France ATF2 Technical Review KEK, 3-4.
Continuous Run in May K.Kubo. Final Focus Test Line IP; ~40 nm beam ATF Linac (1.3 GeV) ATF Damping Ring (140 m) Extraction Line Photo-cathode.
Summary of Commissioning and Tuning session Philip Bambade LAL-Orsay 5 th ATF2 project meeting KEK, 21 December 2007.
ATF2 beam commissioning status and beam time request Toshiyuki Okugi 2008 / 11 / 12 ATF2 Commissioning Meeting.
ATF-II Review by GDE Marc Ross, (SLAC) For GDE Project Managers: Nick Walker and Akira Yamamoto 24 January, th ATF2 Collaboration Meeting.
Planning Ahead for Oct-Dec Operations Period Glen White, SLAC June 28, 2012 ATF2 14 th Collaboration Meeting, KEK.
Commissioning Status of Shintake Monitor (IP-BSM) T. Yamanaka, M. Oroku, Y. Yamaguchi, Y. Kamiya, S. Komamiya (Univ. of Tokyo), T. Okugi, N. Terunuma,
Technical Board “issues” Philip Bambade Laboratoire de l’Accélérateur Linéaire Université Paris 11, Orsay, France ATF2 Technical Review KEK, 3-4 April.
8 th Meeting of the ATF TB/SGC 11 June Hardware Status Fast Kicker – FID pulsers have had a reliability problem: this appears to have been solved.
ATF2 Kiyoshi KUBO Accelerator Test Facility (ATF) at KEK ATF – Designed as a prototype of damping ring and injector of LC – Achieved low vertical.
BDS Andrei Seryi, Deepa Angal-Kalinin, Emmannual Tsesmelis, Rogelio Tomas, Andrea Latina, Daniel Schulte Detectors Civil engineering.
ATF2 Commissioning Toshiyuki Okugi 2008 / 7 /9 ATF2 beam commissioning meeting, KEK.
Greeting for 10 th ATF2 project and TB/SGC joint meeting 1.
July 2, th ATF2 Project Meeting Philip Bambade, Andrei Seryi, Toshiaki Tauchi Summary for TB.
Global Design Effort Introduction and goals of the meeting Andrei Seryi, Toshiaki Tauchi Fifth ATF2 Project Meeting December 19-21, 2007.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis, Colin Perry.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John.
Commissioning Hardware and IP Configuration of ATF / 12 / 19 ATF2 project meeting at KEK Toshiyuki Okugi (KEK)
IP instrumentation configuration for Autumn 2010 ATF2 runs Toshiyuki OKUGI, KEK 2010 / 7/ 1 10 th ATF2 project meeting.
GM sensor tests and installation A.Jeremie K.Artoos, D. Kudryavtsev, Y.Renier, R.Tomas-Garcia, D.Schulte.
Philip Bambade Laboratoire de l’Accélérateur Linéaire
ATF2 Tuning Summary Nov & Dec 2010 Glen White, SLAC 11 th ATF2 Project Meeting, SLAC Jan
ATF2 Report ALCW Kiyoshi KUBO, for ATF2 Collaboration.
ATF2 Software Review LAL June SHORT SUMMARY - Philip Bambade ATF2 weekly meeting July
Upcoming Shift Work at ATF (November 26 – December 21, 2007) and Remote Participation from SLAC ATF training shifts proposal Rob Appleby (contact person,
Status of ATF2 final focus prototype ( emphasizing French involvement ) Philip Bambade LAL-Orsay Andrea Jérémie et al. (LAPP) Marc Verderi & Hayg Guler.
Task Lists of ATF2 commissioning Toshiyuki Okugi ATF2 Project Meeting 12 / 17 / 2008.
ATF2 Software Review LAL June 2008 Philip Bambade & Glen White ATF2 weekly meeting June
CERN, BE-ABP (Accelerators and Beam Physics group) Garcia, Pfingstner, Renier ATF operations training Report about the ATF operations training Hector Garcia.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John.
Technical Board Summary Preliminary Philip Bambade Laboratoire de l’Accélérateur Linéaire Université Paris 11, Orsay, France ATF2 project meeting, Technical.
ATF2 Software tasks: - EXT Bunch-Bunch FB - IP Bunch-Bunch FB - FB Integration Status and plans Javier Resta-Lopez JAI, Oxford University ATF2 commissioning.
A_RD_2 Collaboration on ATF2 final focus prototype and MDI for future linear colliders ILC & CLIC Philip Bambade LAL & KEK On behalf of colleagues from.
ATF2 Status and Plans CLIC January 2016.
Status of ATF2 linear collider focus prototype emphasizing France-China joint contributions Philip Bambade Laboratoire de l’Accélérateur Linéaire Université.
LAL-IHEP collaboration on the linear collider final focus & ATF2 prototype Philip Bambade Laboratoire de l’Accélérateur Linéaire Université Paris 11, Orsay,
ATF2 Status Background for the installation planning of Collimator
ATF2: Accelerator Test facility A.Jeremie LAPP: A.Jeremie LAL: P.Bambade, Shan Liu, S.Wallon, F.Bogard, O.Blanco, P.Cornebise, I. Khvastunov, V. Kubytskyi.
Fast Beam Collision Feedbacks for luminosity optimisation at next-generation lepton colliders Philip Burrows John Adams Institute Oxford University.
Special ATF Session - ATF/ATF2 day on 28th September -
Nanometer stabilisation at ATF2 within FJPPL and FKPPL
Measurements and analysis of beam parameters at post-IP wire-scanner
Expected hardware status and Priority of the commissioning task
Emittance Diagnostics
Philip Bambade, Andrei Seryi, Toshiaki Tauchi
Oversea collaborators
CLIC-ILC BDS & MDI work.
Summary of the ATF2 project meeting at LAL (Jan.13-15, 2016)
ATF2 review R. Tomas ATF2 review web:
Background study plans : from to ILC
ATF ICB meeting, LCWS08, UIC, Chicago, 11/18/2008
Presentation transcript:

Highlights and discussion at LAL FKPPL & FJPPL “Toshiko Yuasa” workshop Philip Bambade Laboratoire de l’Accélérateur Linéaire Université Paris 11, Orsay, France KILC12, Daegu, South Korea 24 April 2012

Sessions 1.“Goal 1” R&D : RD and EXT emittance, recent running, BSM status and discussion of systematics, beam halo, Geant4 simulation of bremstrahlung bkgd, discussion of new strategy, issues and priorities 2.“Goal 2” R&D : low-Q IPBPM status, mechanics, plan for IP feedback, usage with IPBSM, thoughts on calibration, staging of objectives and scheduling 3.New projects (planned CERN hardware contributions) : Kicker, FD upgrade, GM sensors 4.Progress reports : Beam trajectory and Twiss reconstruction, neutron modeling, post-IP halo and Compton recoil spectrum measurements, FONT analysis 5.Scheduled discussions of engineering issues : IPBPM mechanics, FD hybrid magnet, GM sensor testing and usage, IPBSM systematics P. Bambade, S. Wallon (LAL), K. Kubo, T. Tauchi, T. Terunuma (KEK), J. Yan (Tokyo), S. Bai (IHEP), H. Guler (LLR), S. Jang (KNU), P. Burrows, G. Christian (JAI), D. Schulte, A Vorozhtshov, Y. Renier, H. Garcia Morales (CERN), H. Hyun (KNU&LAL), A. Jérémie (LAPP)

Jacqueline Yan (Tokyo)

ATF2: background dependence on  * GEANT4 (idealized conditions) from Hayg Guler (LLR) February – March 2012 from Toshiyuki Okugi (KEK)  post-IP bend magnet vertical gap

ATF2: physical apertures in FFS Sha Bai (IHEP)

ATF2: intercepted halo in FFS ? QD10 QF9 Sha Bai (IHEP)

S. Wallon & F. Bogard (LAL)

Required precision on relative IP-BPM scale factors depends on beam parameters  ~ 1 m (e.g. diagnostic section)  123IP d  IP = (y 2 – y 1 ) / d y IP = 2 y 2 – y 1  = calibration error of 1 relative to 2  2 y 2 – y 1 ~ y IP + 2   d  jitter ~ (  /  ) 0.5 d (  jitter /  ) ~ rad   ~ for 1 nm error d ~ 0.1 m  y ~ 12 pm  jitter /  ~10%  ~ m (interaction point : nominal 10 x optics)  jitter ~ (  /  ) 0.5 d (  jitter /  ) ~ rad   ~ for 1 nm error  ~ for 10 nm error  ~ for 1 nm error  “nanometer resolution demonstration” and to “IP extrapolation for feedback purpose”

Some comments on new “goal 1” strategy 1.Prepare 12 “students” for ATF2 operation (coordinated by S. Kuroda)  S. Kuroda and J. Yan in next talk 2.Eight weeks dedicated “goal 1” operation in October-December - daily & weekly meetings  review progress, modify the planning,… - commissioning and operation plan jointly defined and supported: - overall coordinator in addition to weekly / daily shift management: several paths can appear and may be valid, but single decision essential to avoid confusing the “students” in the control room ! based on-site, experienced in machine physics and management for efficient communication flow between all contributors