August 3, 2011: 9:00 a.m. – 10:30 a.m. Rm. 111, Metcalf Building 1520 E. 6 th Ave. Helena, M.

Slides:



Advertisements
Similar presentations
AUTOMOTIVE COOLING SYSTEMS
Advertisements

Let’s watch a DVD… DVD Instructor Notes
Bay Zoltán Foundation for Applied Research Institute for Logistics and Productgion Systems BAY-LOGI Evaluation system for corrosion defects in pipelines.
1 NMDPS-MTPD ENHANCED ELECTRONIC SCREENING. 2 Project Overview  Introduction  The NM Motor Transportation Police are manually entering License Plates.
Laying a new pipeline A pictorial story. Where it begins: a proving slot The proving slots are small trenches dug at regular intervals so that it can.
The Home Inspection Book: A Guide for Professionals By Marcia Darvin Spada Copyright, Thomson/South-Western, 2003, Revised, 2006.
Federal department of environment, transport, energy and communications ETEC Federal Office for the Environment FOEN Risk Assessment on Pipelines: the.
August 21, 2012 Western Regional Gas Conference Paul Gustilo Southwest Gas Corporation.
Water Crossing Survey of Montana Petroleum Pipelines
What should be checked?  When driving long distance?  During a regular vehicle inspection?  How often should oil changes be done?
DAILY APPARATUS CHECKS The goal of a daily inspection is to ensure all systems and equipment are in proper working order before apparatus leave the station.
1 Land use planning and policies in the Netherlands March 8 th 2006, Carla Speel.
Montana Delinquency Jurisdiction Lower Age: (None specified) Upper Age: 17 Extended Age : 24.
SEPTEMBER 8-12, 2014 INOGATE PIPELINE QRA SEMINAR Title slide PIPELINE QRA SEMINAR.
Railroad Commission of Texas Pipeline Safety Division.
Overview of Key Rule Features
Model Urban Pipeline Initiative Panel Discussion Karen Edelstein Eastern Program Coordinator FracTracker Alliance Mayor’s Council.
Proposed Improvements to the Water System Infrastructure in the Anacostia Area of Washington, D.C. November 20, 2002 Prepared by Prepared for Our Customers,
The German Approach on Safety of Natural Gas Distribution Pipelines WORKSHOP ON THE PREVENTION OF ACCIDENTS OF GAS TRANSMISSION PIPELINES (The Hague, 8.
© Irrigation Association Designing for Chemigation Equipment.
Water Supply.
Pipeline Qra Seminar Title slide Title slide.
Regulation of Pipelines
FIREFIGHTER II LESSON 12. TYPES OF VALVES Ball — Ball — Controls nozzle flow and pump discharge rates Gate — Gate — Controls hydrant flow Butterfly.
SCC DA Program Stress-corrosion-cracking direct assessment (SCCDA) is a structured process that contributes to pipeline company’s efforts to improve.
Illinois RC & D Introduction to R esource C onservation & D evelopment Module 3: What makes it run?
Burle Leak Check 3/19/2012 Jeff Williams Jun Xie.
Julie Halliday, Program Development DOT – PHMSA – OPS November 18, Pipeline Safety Trust Conference Pipeline Safety – Getting to Zero Pipeline.
ISO OPERATIONAL CONTROL
Book 1: Chapter 4 Control of the Oil Movements. Objectives After reading the chapter and reviewing the materials presented the students will be able to:
15 Water Supply. 2 Objectives Describe the sources of water for a municipal water supply system. Explain the purpose of a water treatment facility. Describe.
Manager ethics Business Ethics Infrastructure Slovak University of Technology Faculty of Material Science and Technology in Trnava.
RP PROCEDURE FOR FLUID ANALYSIS Detector Cooling Project - 16 th June 2011 Heinz Vincke, Nadine Conan DGS/RP..... based on EDMS document # prepared.
Pipeline Safety Trust Fort Worth Natural Gas Production Issues John W. Pepper Project Manager Office of Pipeline Safety Southwest Region, Houston, Texas.
Chapter 37 Pipeline Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Explain the.
Aging Infrastructure Management and Challenges Sue Fleck Vice President Pipeline Safety Trust “Getting to Zero’ Conference 2011.
TRENTON Casing Filler Presentation
1 Natural Gas Transmission Pipelines Brisbane City Council Meeting June 6, 2011.
HCAs & Pipeline Assessment Intervals Is There a Need for Change? Richard B. Kuprewicz President, Accufacts Inc. For Pipeline Safety Trust New Orleans Conference.
“MSRT ENGINEERING" LLC is a pipeline equipment manufacturer. This equipment is high reliable, quick-disconnect. This pipeline equipment can be used in.
Measuring Systems and Tools 11 Introduction to Automotive Service James Halderman Darrell Deeter © 2013 Pearson Higher Education, Inc. Pearson Prentice.
Pipeline Safety: How the Mayor’s Council On Pipeline Safety Can Help Presentation to: Mayor’s Council on Pipeline Safety Conference Name: Christopher A.
Spill Response Plans 1 Aaron W. Martinez Pipeline Safety Specialist NuStar Energy L.P.
Office of Pipeline Safety Impacts of Integrity Management James K. O’Steen Deputy Associate Administrator for Pipeline Safety July 23, 2002.
Turn Liquid Nitrogen tank vent towards the wall Dewar vented into Custodian’s ear as they walked into a lab To prevent injuries, turn Vent and Relief Valves.
Implementation & Maintenance of a LM Control Program.
Regional Meeting on Applications of the Code of Conduct on Safety of Research Reactors Lisbon, Portugal, 2-6 November 2015 Diakov Oleksii, Institute for.
How can students study ESL at home? Presented by FACE DL Program Welcome to Distance Learning! Rev 09/2014.
Developing a Board of Directors. A Board can: Perform tasks Support Contribute skills Advise Fundraise Assist with nonprofit status Obtain public funding.
FLUID POWER LAB INTRODUCTION Purpose of the Lab To create a “work like” environment To create a “work like” environment. To deliver “hands on” experiences.
Restarting Cooling, Ventilation for PS and SPS. PS /SPS days 2006.
CAR PROBLEMS? BY: KYLE KIMBALL. ALL CARS ARE DIFFERENT. FROM THE FORD MUSTANG TO THE GEO METRO, WE KNOW THAT ALL CARS ARE BUILT DIFFERENTLY. SOME ARE.
Release Reporting. How Do I Know If I Have a Leak in My UST System? 1. Unusual operating conditions; such as, erratic behavior of the dispensing pump.
15 Water Supply. 15 Objectives (1 of 2) Discuss rural water supplies. Describe how portable tanks are used to supply water for firefighting. Describe.
Community Pipeline Safety Initiative – St. Helena 1 Community Pipeline Safety Initiative City of St. Helena Tree Commission May 12, 2016.
Development in the Tundra A Case Study of the Trans-Alaskan Pipeline.
Canadian Environmental Legislative David Hunter B.A., LL.B., LL.M. Bennett Jones LLP Presentation to: Fachbereich 1 Architektur, Bauingenieurwesen, Geomatik.
Office of the State Fire Marshal Pipeline Safety Division
AUTOMOTIVE COOLING SYSTEMS
Date of download: 11/6/2017 Copyright © ASME. All rights reserved.
Pipeline Safety Issues
Know the Procedure for Changing Coolant in the Radiator
Tapping a Pipe.
Interventions Marketplace
Pumps, valves, and…pigs?.
Building Bright Futures Board
Direct Payments Engagement Group (DPEG) – ‘Update & Way Forward’
X Y Relation (a set of ordered pairs) x y x y ( , ) x y Mapping
HSE Requirements for Pipeline Operations GROUP HSE GROUPE (CR-GR-HSE-414) EXECUTIVE SUMMARY This rule defines the minimum HSE requirements related to the.
Presentation transcript:

August 3, 2011: 9:00 a.m. – 10:30 a.m. Rm. 111, Metcalf Building 1520 E. 6 th Ave. Helena, M

 Welcome by Governor Brian Schweitzer  Introductions  Purpose of the Council  Election of Council Chair  Development of Council Workplan and Assignments  Public Input  Future Meeting Schedules

Advise the Governor on the following :  The status of all existing oil pipelines running underneath Montana’s Rivers  The safety and risk of ruptures and leaks at each pipeline crossing  What should be done to prevent future pipeline failures

 Determine which agencies have jurisdiction over which aspects of pipeline permitting/easement/safety issues  Develop a comprehensive map of pipeline river crossings

For each pipeline crossing, determine the following, if available:  The pipeline diameter  The owner of the pipeline  The product it is carrying  The pipeline age  The pipeline pressure  The distance between shutoff and check valves, their condition, their proximity to the pump stations, and the location of pressure gauges  The pipeline thickness and degree of corrosion  The pipeline burial depth and the degree of river scouring and meandering.

 Determine what information gaps exist and how to fill them  Determine what regulatory gaps exist and whether to address them at the federal, state or local level.  Other?

Public Input into the Workplan:

 Future Meetings