Port of Long Beach 76 Foot Main Channel Dredging Project Doug Thiessen, Port of Long Beach (POLB),Al Moro, Chief Harbor Engineer, POLB Emily Ueda, Program.

Slides:



Advertisements
Similar presentations
MOBILE DISTRICT FY 2007 DREDGING PROGRAM MOBILE DISTRICT FY 2007 DREDGING PROGRAM US Army Corps of Engineers Mobile District US Army Corps of Engineers.
Advertisements

Marine Construction SCM 330 Tyler Mason Pratt Tyler Mason Pratt
US Army Corps of Engineers BUILDING STRONG ® Craney Island Dredged Material Management Area AIWA Conference Thomas C. Friberg, P.E. Chief, Operations Support.
US Army Corps of Engineers Philadelphia District Scheduled FY 07 Dredging Work FY 07 Dredging Workin Philadelphia District Philadelphia District.
Integrated Waterfront Cleanup and Marina Development in Bellingham, WA Tom Wang, P.E. WEDA Pacific Chapter – San Diego 2009.
OP-Navigation.ppt1 U.S Army Corps of Engineers Savannah District.
Presentation to: Technical Advisory Committee Onondaga Lake.
US Army Corps of Engineers BUILDING STRONG ® PNWA Conference Update COLONEL Jose Aguilar District Commander Portland District 2 October, 2014.
US Army Corps of Engineers Portland District Fiscal Year 2007 NWP Dredging Plan Including: The Columbia River Channel Improvement Project (CRCI)
MOBILE DISTRICT DREDGING PROGRAM MOBILE DISTRICT DREDGING PROGRAM NAD/SAD REGIONAL DREDGING MEETING/WEDA NAD/SAD REGIONAL DREDGING MEETING/WEDA US Army.
Atlantic Intracoastal Waterway (AIWW)
South Atlantic Regional Biological Assessment Update on Status of Re-initation of Consultation under Section 7 of the Endangered Species Act Terri Jordan.
US Army Corps of Engineers BUILDING STRONG ® St. Louis District Dredging Lance Engle Dredging Project Manager St. Louis District WEDA – Midwest 2012.
Civil Works Baltimore District River and Harbor Projects.
JACKSONVILLE DISTRICT FY08 DREDGING SCHEDULE JACKSONVILLE DISTRICT FY08 DREDGING SCHEDULE NAD/SAD REGIONAL DREDGING MEETING/WEDA NAD/SAD REGIONAL DREDGING.
JACKSONVILLE DISTRICT 5 Year NEW WORK DREDGING PROGRAM JACKSONVILLE DISTRICT 5 Year NEW WORK DREDGING PROGRAM NAD/SAD REGIONAL DREDGING MEETING/WEDA NAD/SAD.
DREDGING YOUR DOCKS 2014 Organized By CRA Hydrographic Surveyors Orion Marine Group.
DREDGING YOUR DOCKS 2012 Organized By CRA Hydrographic Surveyors Orion Marine Group.
IR Site 7 Sediment Remediation
PHILADELPHIA DISTRICT 2008 – 2012 DREDGING PROGRAM.
Water Resources Report Rob Montgomery River Flow & Lake Levels TMDL Study Floodplain mapping revisions Dredging 101.
U.S. Army Corps of Engineers Savannah Harbor Expansion Project Savannah Harbor Expansion Project.
Dredging, Disposal Management and Impacts on Lake Sediments US Army Corps of Engineers.
Grand Calumet River/Indiana Harbor Canal Feasibility Study
Coastal & Port Engineering Considerations of the Jacksonville Harbor Deepening Study Kevin Bodge, Ph.D., P.E. Port & Coastal Engineer Senior Vice President.
NAD/SAD REGIONAL DREDGING MEETING/WEDA WILMINGTON DISTRICT
2014 CONSTRUCTION ESTIMATES Estimates Estimates 3 Point of the illustration? Document your assumptions.
CHARLESTONMOBILE WILMINGTON SAVANNAH JACKSONVILLE US Army Corps of Engineers BUILDING STRONG ® NC Water Resources Congress Christine Brayman Deputy For.
Savannah Harbor Expansion Project
US Army Corps of Engineers BUILDING STRONG ® Charleston District Charleston Harbor Post 45 Deepening Feasibility Study Barbara Melvin Senior Vice President.
October FY08-FY12 Dredging Schedule New York District 1st Qtr FY08 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr FY09FY10 1st Qtr 2nd.
Period 3 Kiana Brayton Lyle Swallows
Port of Long Beach Development Projects Al Moro, P.E. Chief Harbor Engineer ACEC January 18, 2012.
Plan Formulation for Deep Draft Harbors Navigation Measures.
NAD/SAD REGIONAL DREDGING MEETING/WEDA Jacksonville Harbor and Other Developments U. S. ARMY CORPS OF ENGINEERS COASTAL NAVIGATION BRANCH 10 October 2007.
Dredging Engineering: Building & Maintaining Underwater Highways
US Army Corps of Engineers BUILDING STRONG ® U.S. Army Corps of Engineers St. Paul District Channels & Harbors Project Presentation for 2012 WEDA Midwest.
March 9, 2011 Report on Construct & Equip Wells (Moniter, 6400 South, 1330 East)
US Army Corps of Engineers BUILDING STRONG ® 2012 Alabama Water Resources Conference Orange Beach, Alabama September 6, 2012 Beneficial Use Opportunities.
OP-Navigation.ppt1 U.S Army Corps of Engineers Savannah District.
Duluth-Superior Harbor Erie Pier: CDF to PRF Conversion Gene Clark, UW Sea Grant Dredging 2012 Conference San Diego, CA 10-22/
BUILDING STRONG ® Mississippi River Ship Channel Gulf to Baton Rouge, LA Propeller Club for Port of New Orleans 24 September 2015.
Middle Harbor Redevelopment Project WEDA Conference November 5, 2009.
ROCK KOSHKONONG LAKE DISTRICT Lake Dredging Project.
Wilmington Harbor Project - 96 Act Brannon Quel. Port of Wilmington The Cape Fear River serves as the shipping channel to the State Port in Wilmington,
US Army Corps of Engineers BUILDING STRONG ® Toke Point Marina Pipeline Maintenance Dredging with Flowlane Disposal at Willapa Harbor, Washington Hiram.
SEPOCTNOVDECJANFEBMARAPRMAYJUNJULAUGSEPOCT FY07FY06FY08 Page 1 of 3 FY07 Dredging Schedule New York District Mechanical Dredge Maintenance Dredging Newark.
Kwasi Badu-Tweneboah, Ph.D., P.E. – Geosyntec Consultants Jacksonville, Florida, USA Kenneth W. Cargill, P.E. – KW Cargill, P.A.. Punta Gorda, Florida,
Dredged Material Separation Plan Execution in New York Harbor Deepening Projects Jeff Snyder SeaVision Underwater Solutions.
Pine Mountain Lake Dredging Project Moffatt & Nichol Project Engineers Cooper Crane & Rigging, Inc. Contractor The Right Contractor Adaptability Communication.
US Army Corps of Engineers BUILDING STRONG ® Mississippi Coastal Improvements Program (MsCIP) “Comprehensive Barrier Island Restoration Plan” PIANC 2012.
Port of Hood River Recreation Committee Meeting April 2, 2007 By: Andrew Jansky, P.E. Flowing Solutions Images are property.
PORT OF TACOMA. Request authorization to award Professional Services Agreement (PSA) No with Geomatrix; and PSA No with Hart Crowser for.
Sand Dollars Federal Shore Protection Appropriations
CDP Morehart 2808 Lafayette Avenue Newport Beach.
Harbor Resources Manager’s Report February 10, 2010.
CALCASEIU RIVER AND PASS DREDGED MATERIAL SEDIMENTATION STUDY.
Port of Long Beach CEQA/NEPA Process Rick Cameron 2010 Tenant Orientation.
Ecology and environment, inc. ecology and environment, inc. International Specialists in the Environment Georganna B. Collins, International.
UPPER NEWPORT BAY ECOSYSTEM RESTORATION PROJECT NEWPORT BEACH CITY COUNCIL STUDY SESSION FEBRUARY 14, 2006.
Dredging operations in placer mining
Middle Harbor Redevelopment: Third Party Fill Material
TVA Kingston Ash Recovery Project Roane County, TN
NEW ENGLAND DISTRICT Operations and Maintenance Projects Maine Dredge Team Meeting October 2015 Ed O’Donnell Chief, Navigation Section.
Engineering Projects Update Al Moro, P.E. Chief Harbor Engineer
Beneficial Use of Dredged Material
WRRDA Section 2102, HMT Target Budget Resources, FY15: $1.2 B (est)
Southern Maine Dredge Purchase Feasibility Study
BOSTON HARBOR DEEP DRAFT IMPROVEMENT PROJECT
Brian McVey Environmental Engineering Manager HII-Ingalls Shipbuilding
Presentation transcript:

Port of Long Beach 76 Foot Main Channel Dredging Project Doug Thiessen, Port of Long Beach (POLB),Al Moro, Chief Harbor Engineer, POLB Emily Ueda, Program Manager, POLB, Janna Watanabe, Environmental Specialist, POLB Jim Fields, U.S. Army Corps of Engineers, Alan Alcorn, Moffatt & Nichol Todd Graham, KPFF, Steve Cappellino, Anchor QEA

Project Goal Improve navigation and environmental safety – Economical sediment remediation (IR Site 7) Deepen and widen turning Basin and Main Channel Create Port property for commerce

Project Sites

Disposal Site: Pier G North Slip

Pier G North Slip Fill

Pier G Fill

Catalina Express Terminal Maintenance Dredging

Target Dredge Depths Area A = 4’+2’ OD Area C (west) = 4’+2” OD Area C (east) = 2’+2’ OD Final Removal Volume Area A = 147,000 CY Area C (west) = 221,000 CY Area C (east) = 134,000 CY Total = 502,000 CY IR Site 7 West Basin Dredge Areas IR Site 7 West Basin Dredge Areas

Clamshell Dredge at IR Site -7

IR Site -7 Material in Dump Scow

IR Site -7 Material at Pier G Fill

Phase 2 – Dredging Turning Basin PIER G 3500’ WEIGHTED HDPE PIPE 4000’ WEIGHTED HDPE PIPE 1000’ STEEL PIPE 2000’ WEIGHTED HDPE PIPE 1400’ FLOATING STEEL PIPE 80’ STEELPIPE SCHEDULE: 4/6/2011 – 4/26/2011 (21 DAYS – 24/7) EQUIPMENT: H.R. MORRIS (CUTTER HEAD) DREDGE POWER: ELECTRIC (from Pier T) DREDGE QUANTITY: 430,000 CY DISPOSE METHOD: PUMP (24” PIPE) PRODUCTION: 17,000 PER DAY

Dike Construction

HR Morris Cutterhead

Channel Dredging

Turning Basin Dredging

Hydraulic Discharge within Fill

Emergent Fill at Pier G

Surcharge Material Originally planned to use Western Anchorage sand mine Revised to include rolling surcharge using Port supplied crushed miscellaneous base (CMB) 2/3 of CMB left on-site for use in developing site Excess material used for other Port project (Middle Harbor)

Construction Costs Engineer’s Cost Estimate : $44M Area Cost Fill Area (Wall, Dike, dredging) $15.7 Million Catalina Express Terminal $0.8 Million IR Site 7 $11.5 Million Turning Basin and Channel (50/50 Fed Funded project) $9.6 Million Miscellaneous Items $2.2 Million Total Bid Amount: $39.8 Million Army Corps of Engineers cost share amount: $4.8 Million

Questions