Test Readiness Review 23 October 2003 CRAL - LYON.

Slides:



Advertisements
Similar presentations
Status of Sensor and Hybrid Production LHCb Zurich Week T. Bowcock.
Advertisements

Catania 28 Feb – 01 Mar 2011 V.Viotto (INAF - Osservatorio Astronomico di Padova) TOU Breadboard Status and Test.
Tritium Target 9 December Overview Design and major subsystems Thermal/structural analysis Cell filling Vent and stack T2 detection and monitoring.
MMIRS 1 MMIRS MMT and Magellan Infrared Spectrograph Brian McLeod.
Área de Instrumentación NAHUAL Mechanical Concept Current Status F. Javier Fuentes Instituto de Astrofísica de Canarias September
CLAS12 – RICH PARAMETERDESIGN VALUE Momentum range3-8 GeV/c  /K rejection factor Not less than 500  /p rejection factor Not less than 100 Angular coverage5.
PACS IHDR 12/13 Nov 2003 Photoconductor Detector Modules 1 IHDR ASTEQ-GmbH Germany Peter Dinges, Michael Harr, Heribert Krüger, Hilmar Richter, Bernd Zimmermann.
PALM-3000 HOWFS - 2/20/09 C. Baranec. PALM-3000 HOWFS Current optical testing Review of Feb 8 th HOWFS update Detailed future tasks 2.
NGAO Instrumentation Overview September 2008 Updated Sean Adkins.
AURA New Initiatives Office S.C. Barden, M. Liang, K.H. Hinkle, C.F.W. Harmer, R.R. Joyce (NOAO/NIO) September 17, 2001 Instrumentation Concepts for the.
Grism Spectroscopy with FLITECAM Erin C. Smith (UCLA) Ian S. McLean (UCLA)
Richard M. Bionta XTOD October 12, 2004 UCRL-PRES-XXXXX X Ray Transport, Optics, and Diagnostics, Overview Facility Advisory Committee.
PACS IBDR 27/28 Feb 2002 Photoconductor Detector Arrays1 IBDR Hilmar Richter ANTEC-GmbH Germany Günter Bollmann, Peter Dinges, Otto Frenzl, Heidrun Köppen,
NGAO Alignment Plan See KAON 719 P. Wizinowich. 2 Introduction KAON 719 is intended to define & describe the alignments that will need to be performed.
Manosque, 25 February 2003 University of Durham Astronomical Instrumentation Group IFU Progress Meeting 2 Slit/Pupil Mirror Development NGST IFU Prototype.
PALM-3000 High-order Wavefront Sensor Update Christoph Baranec Team Meeting #9 10/22/2008.
SWIFT Team University of Oxford 12 th November 2007O-SWIFT Progress Report Fraser Clarke.
PALM-3000 Team Meeting #15 – Wavefront Sensor(s) C. Baranec October 29 th 2009.
PALM Project Jan COO All-Hands Mtg. Project 1640 is an infrared, coronographic integral-field spectrograph for high-contrast companion.
Stefan Moeller X-Ray October 27, X-Ray Detectors Stefan Moeller.
KMOS Instrument Science Team Review Instrument overview.
SIAMOIS, kickoff meeting, Paris, may, SIAMOIS: optical test bench BOSS (Banc Optique SiamoiS) Pernelle Bernardi Observatoire de Paris-Meudon,
Engineering: NAHUAL Ireland Acquisition Camera, Focal Plane Mechanisms and Layout Tully Peacocke, National University of Ireland Maynooth Carlos del Burgo,
Presentation EddiCam consortium, FF, Madrid 13/06/2002 Eddington programmatic status Fully approved by SPC as part of ESA’s science program as project.
NIRSPEC-IFU Management Meeting LAM – ESA – ASD 15/10/04.
The Mid-Infrared Instrument (MIRI) Medium Resolution Spectrometer for JWST Martyn Wells MIRI EC & UKATC.
1 FRIDA Engineering Status 17/05/07 Engineering Status May 17, 2007 F.J. Fuentes InFraRed Imager and Dissector for Adaptive Optics.
Oct 17, 2001SALT PFIS Preliminary Design Review Optical Integration and Test Plan 1 Southern African Large Telescope Prime Focus Imaging Spectrograph Optical.
PACS IIDR 01/02 Mar 2001 Instrument Interfaces1 PACS FPU Opto-mechanical Design Overview and Interfaces J. Schubert MPE.
PACS IIDR 01/02 Mar 2001 FPFPU Alignment1 D. Kampf KAYSER-THREDE.
XEUS cryogenic instrument October 2004 CRYOGENIC SPECTROMETER PROTOTYPE Rationale: Development and demonstration of technical readiness for future.
Experimental Beampipes: Status and Outlook Ray Veness / AT-VAC For the beampipe team With many thanks to the experiment’s installation and coordination.
Current Status of SPICA Focal Plane Instruments October 19, 2009 Hideo Matsuhara (ISAS/JAXA) & FPI team.
Integral Field Spectrograph Eric PRIETO CNRS,INSU,France,Project Manager 11 November 2003.
PACS IBDR 27/28 Feb 2002 Optical System Design1 N. Geis MPE.
DL – IFU (Prieto/Taylor) Slicer: –25mas sampling … 0.9mm slices ~f/250 (assuming no anamorphism) Detector = 2k array of 18um pixels –Slit subtends 1-pixel.
SPS Synchrotron Light Monitor -BSR- Status G. TRAD E. Bravin, A. Goldblatt, F. Roncarolo.
NIRSpec Status and PDR Results Jeff Valenti & Mike Regan 2006 March 16 TIPS/JIM.
WFIRST IFU -- Preliminary “existence proof” Qian Gong & Dave Content GSFC optics branch, Code 551.
Status of the Genova activity on a direction-sensitive optical module toward the KM3 detector M.Taiuti WP3 PYLOS 16/4/2007.
Opto-Mechanics for SNAP at UM
The Prime Focus Imaging Spectrograph Design and Capabilities
Apr 17-22, NAOJ External alignment with X-Ray Telescope (XRT) and EUV Imaging Spectrometer (EIS) Y. Katsukawa (NAOJ) and SOT team.
VENµS MISSION STATUS VENµS users meeting – Jan 2010 Pierric FERRIER, CNES.
GERB 4 Instrument Status GIST 25 23rd October 2006 Presenter: N Morris.
1 MIRI Hardware (from Oct-Dec NPM reports)‏ Fred Lahuis (NPM input from Rieks Jager)‏ SRON MIRI NL Meeting Leiden, 6 th January 2010.
Oct 17, 2001SALT PFIS Preliminary Design Review1 Southern African Large Telescope Prime Focus Imaging Spectrograph Mechanical Mechanism Design Michael.
Mon. 20 October 2003 SO/EUS Proto-consortium Meeting Mechanical Design Dr Douglas Griffin 1 Solar Orbiter Extreme Ultaviolet Spectrometer Conceptual Mechanical.
Instrument Status GLM Science Team Meeting 9 September 2016 Marc Rafal/GSFC GLM Instrument Manager.
NIRSpec IFU Eric Prieto Final Presentation Definition Phase May, 11th – ESTEC.
IFS prototype – PM3 LAM, 13/06/2003 Prototype testing at CRAL Tests at room temperature in the visible.
MMIRS Status A.Szentgyorgyi/SAO 30 April Imaging 7 x 7 arcmin FOV 0.2 arcsec pixels Y,J,H & K wavelength coverage Spectroscopy Multislit (4’ x 7’)
MMIRS 1 Harvard-Smithsonian Center for Astrophysics Magellan SAC 9/05 MMIRS Status Upate Presented by A. Szentgyorgyi P.I. B. McLeod.
IFU Management Meeting LAM – 15/10/04. Introduction (olf)
BSMIan Pain, UK ATC SPIRE Instrument Intermediate Design Review April 23, RAL 1 Beam Steering Mirror Sub-System IIDR Overview Ian Pain UK ATC Colin.
PACS IIDR 01/02 Mar 2001 Optical System Design1 N. Geis MPE.
Astronomical Spectroscopic Techniques. Contents 1.Optics (1): Stops, Pupils, Field Optics and Cameras 2.Basic Electromagnetics –Math –Maxwell's equations.
Date of download: 6/8/2016 Copyright © 2016 SPIE. All rights reserved. The portions of the datacube collected during a single detector integration period.
3 rd March 2006EUS Consortium meeting EUS Instrument Overview Eric Sawyer RAL.
SNAP spectrograph demonstrator : AIT/AIV Cedric CERNA CNRS (IN2P3,INSU) FRANCE,
Integral Field Spectrograph Opto-mechanical concepts PIERRE KARST, JEAN-LUC GIMENEZ CPPM(CNRS),FRANCE.
Integral Field Spectrograph Eric Prieto LAM. How to do 3D spectroscopy.
Jim Fast Pacific Northwest National Laboratory
Astronomical Spectroscopic Techniques
Slicer development Eric Prieto LAM.
The SNAP Integral Field Spectrograph Overview of the project
60.1 Large Diameter Etalon Development
An IFU slicer spectrometer for SNAP
SLAC DOE Program Review
Instrument Overview Larry Springer HMI Program Manager
Presentation transcript:

Test Readiness Review 23 October 2003 CRAL - LYON

October, 23th 2003TRR – Slicer Unit - CRAL2 Agenda 9h Status and Lab visit 9h Status and Lab visit 9h15 Summary of the design 9h15 Summary of the design 9h30 Integration 9h30 Integration 9h45 Overall test plan 9h45 Overall test plan 10h00 Results of individual subsystem test 11h30 Mechanical and vibration test 12h00 Lunch 14h00 Warm test plan 14h30 Cold test plan 15h Pupil and slit Mirrors concerns 15h15 General discussions 16h Action list 17h End

October, 23th 2003TRR – Slicer Unit - CRAL3 Status  Prototype manufactured and integrated  All components requirements are fulfilled  2 concerns: Slit mirrors optical contact released twice Slit mirrors optical contact released twice Pupil mirrors released once during delivery Pupil mirrors released once during delivery One mirror damaged One mirror damaged Cybernetix remanufacture one line (30th oct) Cybernetix remanufacture one line (30th oct)

October, 23th 2003TRR – Slicer Unit - CRAL4 Schedule

October, 23th 2003TRR – Slicer Unit - CRAL5 Action List Review

October, 23th 2003TRR – Slicer Unit - CRAL6 Design Overview Active Stack Heel Stack support Steering mirror Pupil mirror array Slit mirror array Main structure Substructure Thrust cylinders Dummy Stack

October, 23th 2003TRR – Slicer Unit - CRAL7 Prototype manufactured

October, 23th 2003TRR – Slicer Unit - CRAL8 Optical Design  10 Slices  5 pupil mirrors  5 slit mirrors  Diaphragm on re-imaging mirror  5 slits to be studied mm (in slit mirrors and in detector plane) Incident collimated beam Folding mirror Re imaging mirror SlicesPupil mirrors Slit mirrors Camera objective 1 CCD detector

Pupil and slit Mirrors Concerns

October, 23th 2003TRR – Slicer Unit - CRAL10 Pupil and slit mirrors concerns  Recovery plan from the baseline monolithic solution  Not optimized for mechanical strength  Optimized to be mechanically compatible with monolithic  Optical property are fully in specifications  Mechanical assembly has to be redesign

October, 23th 2003TRR – Slicer Unit - CRAL11 Recommendation  Redesign and manufacture new pupil and slit lines  Redesign and manufacture new mechanical support  Conduct vibration and thermal tests  Recommendation: ESA Contract extension (~35k€) Current design Proposition