System designAA Consortium - BolognaOctober 2012 AA Consortium The path to AAVS1 22 October 2012.

Slides:



Advertisements
Similar presentations
SKA New Technology Demonstrator Ray Norris CSIRO Australia Telescope National Facility.
Advertisements

Beamformer implementations (Mike Jones, Kris Zarb Adami, David Sinclair, Chris Shenton) Starting with top level considerations for now, ie Not, which FPGA.
SKAMP Square Kilometre Array Molonglo Prototype. Supporting Institutions  University of Sydney  Argus Technologies  ATNF  ICT Centre.
Square Kilometre Array (SKA) Project PRE-CONSTRUCTION PHASE Briefing for Industry & Science Organisations Tuesday 14 th August Wellington.
Update on Measurements and Simulations at Cambridge: SKALA element + LNA Eloy de Lera Acedo Nima Razavi Ghods Cavendish Laboratory University of Cambridge.
Schediwy: Advantages and Disadvantages of Sparse Aperture Arrays Fermilab: October 2009.
Towards SKA-low: AAVS and Other Practicalities Peter Hall and Mark Waterson ICRAR/Curtin AAVP Workshop, Cambridge, 10 December 2010.
System designAA Consortium - BolognaOctober 2012 AA Consortium AA System configuration options 23 October 2012.
AAVP Workshop December 2010 SKA 1 AA-low design. AAVP Workshop December 2010 SKA 1 AA-low design SKA 1 AA-low is a major System: >10x LOFAR sensitivity.
March 2009LOFAR MKSP Update: SKA and PrepSKA Paul Alexander.
Prototype SKA Technologies at Molonglo: 2. Antenna and Front End G.B. Warr 1,2, J.D. Bunton 3, D. Campbell-Wilson 1, R.G. Davison 1, R.W. Hunstead 1, D.A.
Sascha D-PAD Sparse Aperture Array.
Prototype SKA Technologies at Molonglo: 3. Beamformer and Correlator J.D. Bunton Telecommunications and Industrial Physics, CSIRO. Australia. Correlator.
The SKA Molonglo Prototype (SKAMP) Project SKA Meeting - April 2006 Anne Green.
SKA AA-low: LPD antenna (SKALA) & path towards AAVS0 at Cambridge Eloy de Lera Acedo University of Cambridge 1 AAVP 2011: Taking the AA programme into.
Signal Processing for Aperture Arrays. AAVS1 256 antenna elements distributed over –4 stations –64 elements each.
Dec 2010 AAVP Cambridge workshop AAVP AAVS1/2-low demonstrators Jan Geralt Bij de Vaate.
Paul Alexander Dynamic RangeAAVP 2010 Overview of Calibration and Dynamic Range Challenges Paul Alexander.
Radio Astronomy & The Government of Western Australia A Beautiful Friendship Kelly Kranz Little The Office of Science and Innovation.
AA-mid demonstrator Dion Kant AAVP – 10 December 2010, Cambridge, UK.
CSIRO. Paul Roberts Digital Receivers SKANZ 2012 Digital Receivers for Radio Astronomy Paul Roberts CSIRO Astronomy and Space Science Engineering Development.
Name1 SKA(DS) System Design Aspects 4 th SKADS Workshop, Lisbon, 2-3 October 2008 SKA(DS) System Design Aspects: building a system Laurens Bakker.
Assessment of RFI measurements for LOFAR Mark Bentum, Albert-Jan Boonstra, Rob Millenaar ASTRON, The Netherlands Telecommunication Engineering, University.
SKA-Japan Industry Forum [SKA-Japan Workshop 2010] EMC & Microwave Systems November 05, 2010.
Georgina Harris1 2-PAD 4 th SKADS Workshop, Lisbon, 2-3 October Polarisations All Digital Dr Georgina Harris / Prof Tony Brown SKADS System Design.
Jader Monari1 BEST receivers 4 th SKADS Workshop, Lisbon, 2-3 October 2008 Jader Monari IRA -INAF- Bologna –Italy-
AA-Low Technical Progress Meeting, October 2012, Medicina, Italy AAVS0 & AAVS0.5: System Design and Test Plan Nima Razavi-Ghods Eloy de Lera Acedo.
DVA Series Work Flow P. Dewdney Apr 15, SPDO DVP Work Flow 2 DVA-1 CPG.
Phased Array Feeds John O’Sullivan SKANZ 2012 CSIRO Astronomy and Space Science,
SKA Introduction Jan Geralt Bij de Vaate Andrew Faulkner, Andre Gunst, Peter Hall.
S. Montebugnoli 2 nd SKADS Workshop October 2007 Stelio Montebugnoli IRA - INAF- Italy.
Transition from SKADS to PrepSKA Richard Schilizzi Lisbon, 3 October 2008.
LOFAR AND AFRICA Daan du Toit DST – South Africa.
Philippe Picard1 System Design 4 th SKADS Workshop, Lisbon, 2-3 October 2008 Aperture Arrays system design Front end RF combining: an efficient way to.
Andrew Faulkner1 Technology Readiness Levels 4 th SKADS Workshop, Lisbon Technology Readiness Levels TRLs Andrew Faulkner.
Stelio Montebugnoli BEST 4 th SKADS Workshop, Lisbon, 2-3 October 2008 S.Montebgnoli IRA -INAF- Bologna –Italy- 4 th SKADS Workshop, Lisbon, 2-3 October.
AAs in PEP Jan Geralt Bij de Vaate. PEP Project Execution Plan for the pre construction phase of the SKA Consortium to be formed AA-low ready for construction.
AA-mid Strategy to proceed to SRR & next steps AuthorAndrew Faulkner AA dCoDR: 23 November 2011.
SKA DRAO SKA success dependent on technology development –major improvements in price/performance Survey Speed -> (A eff / T sys ) 2 x Field of View.
S.Montebugnoli BEST 4 th SKADS Workshop, Lisbon, 2-3 October 2008 Stelio Montebugnoli IRA -INAF- Bologna –Italy- SKADS 4th -Lisbon- Oct 2-3, 2008.
2 nd SKADS Workshop October 2007P. Colom & A.J. Boonstra 1 Outline -progress in RFI mitigation (methods inventory) -system design & RFI mitigation:
ASKAP: Setting the scene Max Voronkov ASKAP Computing 23 rd August 2010.
AAVS processing: Uniboard implementation. UNIBOARD Jive led FP7 project UniBoard, high integration density >> processing / m3
Australian SKA Pathfinder (ASKAP) David R DeBoer ATNF Assistant Director ASKAP Theme Leader 06 November 2007.
AAVS 0.5: An Overview Peter Hall ICRAR/Curtin, Bologna, October 22, 2012.
Andrew Faulkner1 DS4 Deliverables 4 th SKADS Workshop, Lisbon DS4 Deliverables Andrew Faulkner.
A real-time software backend for the GMRT : towards hybrid backends CASPER meeting Capetown 30th September 2009 Collaborators : Jayanta Roy (NCRA) Yashwant.
K-Band Focal Plane Array Project Engineering Overview Matt Morgan National Radio Astronomy Observatory 2/27/2008.
Rosie Bolton 2 nd SKADS Workshop October 2007 SKADS System Design and Costing: Update and next steps Rosie Bolton University of Cambridge.
Georgina Harris 11 th October nd SKADS Workshop – Observatoire de Paris 2-PAD Infrastructure Georgina Harris SKADS System Design and Team Leader.
DHCAL Jan Blaha R&D is in framework of the CALICE collaboration CLIC08 Workshop CERN, 14 – 17 October 2008.
Keith Grainge Calibration issuesAA-low Technical Progress meeting Calibration Issues Keith Grainge.
6 May 2009Lynn Baker AWG Meeting LA1 TDP Antenna and Feed Plan Lynn Baker Antenna Working Group Meeting Los Angeles, CA May 6, 2009.
 History of early Universe; the Epoch of Reionization  Goal: Map the evolution of structure of the early Universe using the Murchison Widefield Array.
Engineering Commissioning May 2016 SKA1 LOW – Assembly, Integration & Verification Adam MacLeod AIV Consortium Manager & ASKAP System Engineer.
Andrew Faulkner April 2016 STFC Industry Day: Low Frequency Aperture Array Andrew Faulkner Project Engineer.
European Pre-AAVS1 Update AADC all-hands, Bologna, 9-13 May 2016 Nima Razavi-Ghods.
2016 AADC - LFAA AADC: Aperture Array Design & Construction Consortium LFAA: Low Frequency Aperture Array Array Prototypes Bologna, 11 May 2016, 9:30 AM.
Fibre Evaluation for MRO Conditions
Multi-beaming & Wide Field Surveys
Digital Receivers for Radio Astronomy
Mid Frequency Aperture Arrays
Improved radio data analysis with LOPES Katrin Link, for the LOPES Collaboration #0404, ICRC 2011, Beijing.
Signal Processing for Aperture Arrays
IRA – INAF Bologna (I) DS-6 16 September 2018 SKADS Workshop 2006
Technical Foundations & Enabling Technologies – DS4
DIISR and the Pre-construction Phase October 2011
SKA PEP - Dish Array WP5 Phase 1 Dishes with Single Pixel Feed Systems
ATCA Wideband Continuum Operation
SKAMP Square Kilometre Array Molonglo Prototype
Presentation transcript:

System designAA Consortium - BolognaOctober 2012 AA Consortium The path to AAVS1 22 October 2012

System designAA Consortium - BolognaOctober 2012 AA Consortium AAVS1 Precursor to AAVS2 – the pre-production prototype of SKA Phase 1 A large system yet to be fully defined (work in Stage 1 PEP) Probably ~256 dual polarisation elements in a number (4?) stations To verify: –All the front end electromagnetic and analogue systems –Deployment in volume –Costs and construction time in for AA-low –Scaleable processing systems –Algorithm and control of the beamforming systems –RFI screening To be built on the SKA site in Western Australia

System designAA Consortium - BolognaOctober 2012 AA Consortium Developing AAVS1 Based on, and extensions, of precursor verification systems AAVS0 local in Europe AAVS0.5 on target site LOFAR in Europe MWA in Australia PAPER in South Africa

System designAA Consortium - BolognaOctober 2012 AA Consortium Uses of AAVS0 Develop and test the electromagnetic performance of the element and array Test the mechanical design and deployment issues Develop LNA and analog chain design Develop the prototype processing and algorithms Take AAVS0 to a “16 element” AAVS1 development system, making AAVS1 ready for deployment BUT Affected by RFI and uses higher power on its amplifiers, ADC may not have sufficient resolution Tough to see anything much Astronomically

System designAA Consortium - BolognaOctober 2012 AA Consortium Uses of AAVS0.5 Deployment considerations at the SKA1-low site Consortium logistics in accessing the MRO Testing surrounding low-power, low-noise amplifiers and analog gain chains Signal processing trade-offs in a clean RFI environment Limited astronomical testing with a small system Potential materials issues in the environmental conditions of the site Opportunities to correlate with MWA for beam performance tests, in the event that this is seen as possible and desirable by MWA collaborators

System designAA Consortium - BolognaOctober 2012 AA Consortium What can we do with AAVS0.5? Measure noise temp at low noise site Check the local RFI with a realistic system Test the low power properties with low noise amplifiers and gain chain Use Australian commitment for AA-low! Establish AA-low near the target Australian site