Feasibility of Aquifer Recharge Using Reclaimed Water in the Tampa Bay Area March 31, 2009 Phil Waller, P.E.

Slides:



Advertisements
Similar presentations
State of California Lahontan Water Quality Control Board Update on Salt & Nutrient Management Plans.
Advertisements

The CSO Abatement Project Presented by: Paul Nordstrom Director of Operations and Engineering.
Presented by: Ronald O. Nichols LADWP General Manager
w-fn005 1 Ocean Outfall Legislation Compliance City of Hollywood Department of Public Utilities LARGE USER MEETING October 2, 2008.
n Headquarters:Raleigh, N.C. n Employees:17,355 n Customers:2.8 million n Primary Subsidiaries: CP&L, Florida Power, NCNG, Progress Telecom, SRS n Operating.
This presentation is an abbreviated version of the original PowerPoint presentation of June 23, This version was presented at the Commissioners’
The Town of Discovery Bay Community Services District Wastewater Treatment Plant Master Plan NOVEMBER 9, 2011.
The Idaho Department of Environmental Quality Mark Mason, P.E., Engineering Manager Idaho DEQ - Boise Regional Office 1445 North Orchard Boise, ID
LEE COUNTY UTILITIES DIVISION Integrated Water Resources Master Plan
Michele Robertson, PG Is Deep Injection a Disposal Option in Arizona? GATEKEEPER REGULATORY ROUNDUP 2011 February 16, 2011.
Extensive culture: low intensity aquaculture providing only small increases over natural productivity. Extensive fish culture systems have low stocking.
Eld Polk County Southeast Regional Wellfield. Polk County, Florida  Central Florida (Landlocked)  554 Lakes  Headwaters to Multiple Rivers (Low Volume)
Monterey Peninsula Water Supply Project - Presentation to Monterey Co. Water Resources Agency June 25, 2012.
Shell and Prairie Creek Watershed Management Plan – Reasonable Assurance Documentation And Agricultural Reservoirs Southwest Florida Water Management District.
Aquifer Recharge Using Reclaimed Water in the Tampa Bay Area Phil Waller, P.E.
Mid-Florida Materials (MFM) (Division of Hubbard Construction) C&D Debris Disposal Facility Renewal of C&D Permit.
Water Treatment for NYC Croton Schematic. NYC Filtration Plant for Delaware and Catskill Systems  Filtration avoidance criteria  Alternatives to Filtration.
Water Treatment for NYC Croton Schematic. NYC Filtration Plant for Delaware and Catskill Systems ä Filtration avoidance criteria ä Alternatives to Filtration.
Reclaimed Water–A Sustainable Source for Florida’s Growing Water Needs Larry R. Parsons, Ph.D. Citrus Research & Education Center Lake Alfred Liz Felter.
 Groundwater Supply ◦ Quantity ◦ Quality  Infrastructure ◦ Treatment ◦ Transmission ◦ Distribution  Response Plans ◦ Long-term ◦ Short-term ◦ Emergencies.
1 South Orange Coastal Ocean Desalination (SOCOD) Project, Ocean Desalination Costs and Recent Public Opinions November 2011 Status Update Karl Seckel,
Equus Beds ASR Program – Wichita’s Future Water Supply September 6, 2012.
COMPREHENSIVE FLOODPLAIN MANAGEMENT : Promoting Wise Uses of Floodplains CA Department of Water Resources/ CIFMCG Workshop July 2006.
Sole Source Contracts for Administrative Hearing Southeast Water Supply Augmentation Project Presented to: Orange County Board of County Commissioners.
Michael Tamblin, P.E., BCEE Stearns & Wheler, LLC Protecting and Enhancing the Ramapo Watershed – A Designated Sole Source Aquifer Supplying New York and.
CENTRAL FLORIDA COORDINATION AREA Central Florida Water Initiative Central Florida Water Initiative Regional Water Supply Plan Bill Graf Intergovernmental.
Feasibility of Aquifer Storage and Recovery in the Upper Colorado River Basin Presented by: Western Water & Land, Inc. Grand Junction, Colorado.
Cottonwood Water & Sanitation DistrictSeptember 2002 Arber Indirect Potable Reuse at Cottonwood Water and Sanitation District Rick Arber, Ben Johnson Richard.
Integrated Constructed Wetlands Regulatory Aspects - the EPA’s role Aoife Loughnane Inspector, Environmental Licensing Programme Environmental Protection.
SAWS' Twin Oaks Aquifer Storage and Recovery Project SAWS' Twin Oaks Aquifer Storage and Recovery Project October Texas Innovative Water 2010 Roberto.
Short and Long Range Water Supply Planning and Aquifer Performance Test (APT)
Aurora’s Prairie Waters Project – A Sustainable and Innovative Water Supply Solution Colorado State University September 17, 2007 Mark Pifher/Aurora Water.
Withlacoochee Regional Water Supply Authority Water Supply Plan Update - Progress Report #3 May 15 – June 18.
CITRIS 2010 Real-time monitoring of Managed Aquifer Recharge: Application of thermal methods at remote sites to improve water resources A. T. Fisher 1,
1 Update Ocean Desalination Feasibility Studies Karl Seckel Assistant General Manager.
South Orange Coastal Ocean Desalination (SOCOD) Project Dana Point/Doheny Beach, California November 2010 Status.
Maximizing Water Supply Sustainability for the Goleta Valley Ryan Drake Water Supply and Conservation Manager 2015 Central Coast Sustainability Summit.
Levy Nuclear Plant Overview of Water Issues Presented by Jamie Hunter to the FDEP – Central District’s 13 th Annual Power Generation Conference Lake Buena.
Geospatial Analysis of the Big Spring, TX Area. Types of Wastewater Reuse Non-Potable Reuse Watering lawns Industrial cooling Indirect Potable Reuse Aquifer.
POTABLE REUSE THE ALTERNATIVE WATER SUPPLY. Florida Section WateReuse Association November 9, 2015 Chuck Drake, PG.
City of Tallahassee Wastewater Treatment System Hydrogeology Workshop – 2005 May 12 – 13, 2005.
0 Modeling of Salt-Water Intrusion James L. Kennedy, Ph.D., P.G. Georgia Environmental Protection Division State Geologist.
MSSC 2011 Annual Salinity Summit February 17 – 18, 2011 Thirty Years of Success in Implementing Desalination By Roger K. Noack, P.E. HDR Engineering, Inc.
City of San Diego’s Recycled Water Study Item W15a October 10, 2012 Presentation to the California Coastal Commission.
The David W. York Award JEA South Grid Reuse System Tom Bartol, P.E.
Potable Reuse in Texas: A Glimpse into the New Water Frontier Ellen McDonald, Ph.D., P.E. Alan Plummer Associates, Inc.
Water Supply Orange County Presented by Kirby B. Green Executive Director St. Johns River Water Management District January 27, 2009.
Withlacoochee Regional Water Supply Authority Water Supply Plan Update - Progress Report #5 July 15 – September 15.
BY: MARTY WANIELISTA, PHD., P.E. BMPTRAINS MODEL: BACKGROUND INFORMATION ON HARVESTING.
20th Salt Water Intrusion Meeting
December 10, 2009 TOWN OF PALM BEACH WATER COMMITTEE Discussion of Water Plant Options.
Began funding reclaimed projects in projects funded 325 projects completed $435M leveraged $1 Billion 970 miles of pipelines 248 MGD reuse capacity.
Silicon Valley Advanced Water Purification Center And Future of Purified Water Use Tour Guides: Miguel Silva Tour Coordinators: Amy Fry, Michelle Pelayo-Osorio.
1 GE-Sw011 Southern Regional Wastewater Treatment Plant Ocean Outfall Rule Change Pilot Testing Plan of Study Development Monday, February 13, 2012.
Miami-Dade Water & Sewer Department Miami-Dade Water and Sewer Department |  1   Reuse, Every Drop Has Value Seminar FPL JPA.
GWRS Final Expansion Project and SP-173 Update GWRS Steering Committee Meeting April 11, 2016.
University of Nevada Advanced Water Treatment Technologies Demonstration Project Western Regional Water Commission June 21, 2017.
Aquifer Test Analysis Carter Lake, Iowa
Development and Application of a Groundwater-Flow Model of the Atlantic Coastal Plain aquifers, Aiken County, South Carolina to Support Water Resource.
RAPID INFILTRATION BASIN Design and Permitting Services
Modeling ASR Hydraulics and Plume Geometry
Flow Equalization Jae K. (Jim) Park Dept. of Civil and Environmental Engineering University of Wisconsin-Madison.
Reuse and Wastewater Disposal
AIF Florida Water Forum
October 29, 2018 Terry Lauritsen, P.E.
July 1, 2019 City of Sunrise Floridan Aquifer Test Program Searching for Sustainable Water Quality and Yield Imagine the result.
Chino Basin Watermaster
CENTRAL FLORIDA POTABLE REUSE TEST PROJECTS .
August 30, 2019 Robert Beltran, PE , BCEE
Frostproof Site Hydrogeological Investigation of
Presentation transcript:

Feasibility of Aquifer Recharge Using Reclaimed Water in the Tampa Bay Area March 31, 2009 Phil Waller, P.E.

SWUCA and MIA Recovery Strategy

Aquifer Recharge Concepts Direct Aquifer Recharge Recharge Wells Indirect Aquifer Recharge Rapid Infiltration Basin (RIB)

Project Scope of Work Task 1 – Similar Projects, Hydrogeology, Water Quality, and Permitting Summary Task 2 – Groundwater Modeling of indirect and direct aquifer recharge concepts Task 3 – Cost Analyses of selected recharge concepts Task 4 – Final Summary Report of findings

Similar Projects Review Direct and Indirect Recharge California Groundwater Replenishment System in Orange Co., CA

Similar Projects Review RIBs in Florida Commonly used for effluent disposal Secondary treatment required Some wetland polishing prior to RIBs WATER CONSERVII – Orange Co. Florida

FDEP Reclaimed Water Treatment Requirements Difficulty Less More

Ambient Aquifer Water Quality Avon Park Formation TDS mg/L

> 3,000 mg/L Filtration and HLD Meet Drinking Water Standards Ambient Aquifer Water Quality Avon Park Formation TDS mg/L

< 3,000 mg/L > 500 mg/L Multiple Barriers TOC / TOX 1 Year Pilot Test Ambient Aquifer Water Quality Avon Park Formation TDS mg/L

< 500 mg/L Avon Park Formation TDS mg/L Ambient Aquifer Water Quality Multiple Barriers Carbon Absorption TOC / TOX Mutagenecity Testing 2 Year Full Scale Test

SWFWMD Permitting No new groundwater level impacts to the MIA. Minimum flows and levels established for priority water bodies in the SWUCA. Net benefit in the SWUCA must be demonstrated.

Indirect Aquifer Recharge Concepts Areas Area 2 – Moderate connection to UFA Lakeland Area Area 3 – Minimal connection to UFA Engineering Enhancements Area 1 – High connection to UFA Lake Wales Ridge Area

Change in water level in the Upper Floridan Aquifer Drawdown (ft) Area 1 Indirect Recharge Model Simulation 4 MGD Withdrawal Only From Avon Park Formation

Area 1 Indirect Recharge Model Simulation 5 MGD Recharge and 4 MGD Withdrawal From Avon Park Formation Change in water level in the Upper Floridan Aquifer Drawdown (ft)Mounding (ft)

Modeled Direct Aquifer Recharge Areas

20 MGD Recharge Only Model Simulations Area 5 Water Level Improvements MIA PR Area 1 Middle+1.99 ft+0.33 ft Area 2 South+2.10 ft+0.60 ft Area 3 South+1.77 ft+0.75 ft

Direct Aquifer Recharge Modeled Withdrawal Areas

Coastal (Area 1) Direct Aquifer Recharge 20 MGD Recharge with 15 MGD Withdrawal Response Summary

Inland (Area 2) Direct Aquifer Recharge 20 MGD Recharge with 15 MGD Withdrawal Response Summary Area 3S MIA= feet PR= feet

Inland (Area 2) Direct Aquifer Recharge 20 MGD Recharge with 15 MGD Withdrawal Response Summary

Combination Configurations Selected for Costing

Indirect Recharge Configuration WWTF 5-Mile Long Pipeline 2 Withdrawal Wells 5-Mile Long Pipeline 5 MGD, 500 ACRE, 4 RIB Site 1-mile distance Chloramination Pump Station Indirect Recharge 5 MGD AADF Withdrawal 4 MGD AADF

Coastal Direct Recharge Configuration Advanced WWTF UV Storage Tank Direct Recharge 20 MGD AADFWithdrawal 15 MGD AADF 10-Mile Long Pipeline Chloramination Future Facilities Located at AWWTP (10-acre footprint) Cl Recharge Wells 24 Monitor Wells 890 acres 15-Mile Pipeline UV Vacuum DO Removal 8 Withdrawal Wells (1-acre per well) Pump Station

Inland Direct Recharge Configuration Advanced WWTF Pump Station AOP/ UV Direct Recharge 20 MGD AADF Future Facilities Located at AWWTP (20-acre footprint) Withdrawal 15 MGD AADF 10-Mile Long Pipeline Cl 2 - RO MF Chloramination 20-Mile Pipeline UV Vacuum DO Removal 8 Withdrawal Wells (1-acre per well) Storage Tank 16Recharge Wells 24 Monitor Wells 890 acres

Estimated 2009 Recharge Concept Costs Recharge Rate (AADF in MGD) Withdrawal Rate (AADF in MGD) Total Recharge and Withdrawal Capital Costs (Million $) Annual O & M and Capital Costs (Million $) Total Production Cost $/1,000 Gallons Indirect Aquifer Recharge Areas 1 & 2 54$51.9$6.4$4.36 Indirect Aquifer Recharge Area 3 54$64.8$7.6$5.19 Direct Aquifer Recharge Area 1 Middle 109$134.2$12.6$ & 10$250.9$23.8$ $230.0$22.1$ & 9$248.7$23.7$ $237.4$22.8$3.47 Direct Aquifer Recharge Area 2 South 109$224.3$22.6$ & 10$422.3$42.9$ $401.3$41.3$ & 9$420.0$42.9$ $408.7$41.9$6.38

Recharge Concept Summary Recharge Type Capital Costs ($ Million) Production Costs ($/1,000 gal) RiskIssues Rapid Infiltration Basins 1 $52M$4.30Low Land intensive Common to Florida Minimal MIA water level improvement RIBs with Engineered Enhancements 2 $65M$5.20High Land intensive Minimal MIA water level improvement Connector wells difficult to permit Coastal Direct Recharge 3 $230M$4.00MediumMetals mobilization Inland Direct Recharge 4 $420M$7.50High Metals mobilization Supplemental treatment Full-scale testing 1 5 MGD Recharge and 4 MGD Withdrawal 2 5 MGD Recharge and 4 MGD Withdrawal 3 20 MGD Recharge and 15 MGD Withdrawal 4 20 MGD Recharge and 15 MGD Withdrawal

Feasibility of Aquifer Recharge Using Reclaimed Water in the Tampa Bay Area The End Phil Waller, P.E.