Slide 0 National Spectrum Managers Association Industry Round Table: Fixed Service Mitchell Lazarus 703-812-0440 | May 22, 2007.

Slides:



Advertisements
Similar presentations
FCC Actions To Support Development of WISPS Julius P. Knapp Deputy Chief Office of Engineering and Technology Federal Communications Commission.
Advertisements

Millimeter Wave Regulation IEEE EMC – DC/No. VA Mitchell Lazarus | January 31, 2012 Millimeter Wave Regulation IEEE EMC.
Doc.: /xxr0 Submission November 2011 John Notor, Notor ResearchSlide 1 FCC Actions Related to Progeny LMS Notice: This document has been prepared.
Montana Safe Digging Law 2014 Joint Engineers Conference Thu - Nov :00am-11:30am.
Protecting RNSS Spectrum Domestic and International Activities Karl B. Nebbia Associate Administrator Office of Spectrum Management National Telecommunications.
FCC NPRM on 3G Todd D.Gray Dow, Lohnes & Albertson Counsel, National ITFS Association.
Wireless Systems and 3G in the United States Sydney, Australia March 19, 2001 Jack Deasy Chief, Multilateral & Development Branch Telecommunications Division,
Transparency in Communications Regulation: Suggestions for RATEL Part II: Internet Implementation and An Example Michael J. Marcus, Sc.D., FIEEE Marcus.
Upcoming FCC Spectrum Auctions Bryan N. Tramont Wilkinson Barker Knauer, LLP
Doc.: 18-12/002r2 Submission January 2012 John Notor, Notor ResearchSlide 1 RR-TAG Opening Report Notice: This document has been prepared to assist IEEE.
New Federal Spectrum Access System - US 3.5GHz bands -
April 2009 doc.: IEEE /xxxxr0 May 2015
Submission November 2011 Michael Lynch, MJ Lynch & Associates RR-TAG Closing Report Report of the November 2011 Plenary meeting.
NSMA Working Group 3 Frequency Coordination and New Issues 2015 Conference Report Larrie Sutliff, Chair NSMA Spectrum Management.
Current Issues Affecting Fixed Wireless: An Update on FWCC Activities National Spectrum Management Association Cheng-yi Liu |
Telecommunications Issues for Wind Power Facilities Interdepartment Radio Advisory Committee Presentation June 14, 2005.
Wireless Broadband Service in Rural America Rural TeleCon ‘06 October 24, 2006 Paul D’Ari Spectrum Competition and Policy Division Federal Communications.
0 Slide 0 Preventing Interference from Earth Station Vessels National Spectrum Managers Association May 19, 2004 Mitchell Lazarus | |
Slide 0 Spectrum on a Budget E DUCAUSE October 9, 2006 Mitchell Lazarus | |
(MVDDS) Multichannel Video Distribution and Data Service Auction #53.
Tribal Lands Bidding Credits Extending Wireless Services to Tribal Lands Michael E Connelly Attorney Advisor, Mobility Division November 20, MHz.
Overview of Service Rules and Due Diligence Dwain Livingston Senior Engineer Mobility Division, WTB November 1, – 1990 MHz BROADBAND PCS Auction.
Doc.: IEEE /013r0 Submission March 2003 Carl R. Stevenson, Agere Systems RR-TAG Opening Report Report on January Interim Meeting Report.
A View from the FCC’s Office of Engineering & Technology NSMA Spectrum 2008 May 21, 2008 Julius P. Knapp Chief Office of Engineering and Technology Federal.
Tribal Lands Bidding Credits Extending Wireless Services to Tribal Lands Michael Connelly Attorney Advisor Mobility Division, Wireless Telecommunications.
Millimeter Wave Regulation IEEE EMC – DC/No. VA Mitchell Lazarus | January 31, 2012 Millimeter Wave Regulation IEEE EMC.
Overview of Due Diligence and Post-Auction Process Michael E Connelly Attorney Advisor Mobility Division Wireless Telecommunications Bureau December 3,
Doc.: IEEE /0023r0 Submission May 2009 Rich Kennedy, Research In MotionSlide 1 TV White Spaces Regulatory History Date: Authors:
C OMSEARCH TM Regulatory Review presented at National Spectrum Managers Association Spectrum Management 2004 May 19, 2004 Rosslyn, VA presented by Ken.
SFCG Report to CEOS Frequency Protection for EO Satellites 1 23 rd CEOS Plenary I Phuket, Thailand I 3-5 Novenber 2009.
Wireless Roundup Spectrum Management 2007 NSMA Presented by David Meyer May 22, 2007.
Doc.: 18-12/108r0 Submission October 26, 2012 Slide 1 FCC TV Band Incentive Auction: Impact on Unlicensed Operation Notice: This document has been prepared.
Providing Useful Regulatory Solutions T T & C Telecommunication Regulatory Consultants Shayla E. Taylor TT&C USITUA WRC Seminar September 19, 2007.
Overview of Service Rules and Due Diligence Keith Harper Electronics Engineer Mobility Division, WTB March 7, 2007 BROADBAND PCS Auction No. 71 Seminar.
Licensing Matters Licensing Matters Phase II 220 MHz Service (Auction No. 72) Allen Barna Senior Attorney, Mobility Division Wireless.
Doc.: IEEE d Submission November 2014 John Notor, Notor Research Slide 1 Project: IEEE P Working Group for Wireless Personal Area.
1 Spectrum Management 2008 Industry Association Roundtable Paul J. Sinderbrand Wilkinson Barker Knauer, LLP
Technical Issues, Due Diligence and Licensing Parameters Keith Harper Engineer Mobility Division, WTB June 10, 2008 Auction 78 Seminar BROADBAND PCS.
1 WiMAX and the Canadian Radio Spectrum April 28, 2006 Angela Choi Communications Engineer Pacific Region Industry Canada
0 Slide 0 National Spectrum Managers Association Industry Round Table – Fixed Wireless Service May 20, 2008 Mitchell Lazarus | |
1 NSMA Spectrum Management Association Roundtable Tuesday, May 21, 2002 Jill M. Lyon Vice President & General Counsel.
Doc.: IEEE j Submission Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title:
Earth Station on Vessels An Update to the NSMA Spectrum Management 2006 Presented by Ken Ryan, Skjei Telecom May 17, 2006.
71-95 GHz Registration A Streamlined Approach to Licensing.
SPECTRUM MANAGEMENT 2004 National Spectrum Managers Association Satellite Spectrum Management Issues Carlos M. Nalda May 19, 2004.
National Telecommunications and Information Administration Edward M. Davison Deputy Associate Administrator Office of Spectrum Management National Telecommunications.
FCC Public Safety Regulatory Update IGA State and Local Government Webinar May 2, 2012 Federal Communications Commission Public Safety and Homeland Security.
0 Slide 0 Evolving Methods of Controlling Interference National Spectrum Managers Association May 19, 2004 Mitchell Lazarus | |
NSMA Working Group Conference Report Larrie Sutliff, Chair NSMA Spectrum Management /16/2012.
Air-to-Ground Mobile Broadband on Aircraft FM48#10 - Info 002.
U.S. Commercial Air-Ground Services USA/CAN/ECC Spectrum Management Consultation, June Washington DC FM48#7-Info002 (US ECC(12)025)
Spectrum Sharing in 3.5 GHz Band
Promoting Spectrum Access for Wireless Microphone Operations.
1 70/80/90 GHz Web-Based Coordination Improving the Effectiveness of the Domestic Spectrum Management Process National Spectrum Managers Association Arlington,
ITFS Becomes EBS New Rules and New Band Plan Presented by Edwin N. Lavergne February 15, 2005.
0 Slide 0 National Spectrum Managers Association Unlicensed Devices May 16, 2006 Mitchell Lazarus | |
Basics of the U.S. Table of Frequency Allocations
Operation of Radar Services in 76 – 81 GHz band
July 2012 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: FCC MBAN Overview of Report and Order Date.
Mobile VSATs An Overview of Ku-Band Mobile Satellite Services
4.9 GHz National Plan Update
Satellite Industry Association Spectrum Priorities and Objectives May 20, 2008 S I A M E M B E R C O M P A N I E S.
National Spectrum Managers Association
Basics of the U.S. Table of Frequency Allocations
Indoor Location Accuracy NPRM
FCC Spectrum Sharing in the 3.5GHz Band Comments Approval
MHz FCC Action Date: Authors: May 2006 May 2006
FCC FNPRM Responses Date: Authors: August 2016
Discussion on 6 GHz Band Support
Presentation transcript:

Slide 0 National Spectrum Managers Association Industry Round Table: Fixed Service Mitchell Lazarus | May 22, 2007

Slide 1 Fixed Wireless Communications Coalition  Companies, associations, individuals interested in terrestrial fixed microwave communications  Manufacturers of microwave equipment, licensees of terrestrial fixed microwave systems and their associations, frequency coordinators, communications service providers and their associations  railroads, public utilities, petroleum and pipeline entities, public safety agencies, and/or their respective associations, local and mobile telecommunications carriers, video providers, attorneys, engineers.

Slide 2 Current Issues  Open:  2-Foot antennas at 11 GHz  NASA seeks to protect EESS  FAA seeks expanded notice  NTIA requests earth station parity  MSSI waiver request  Resolved:  18 GHz rechanneling  Interference temperature  Orbital-arc petition.

Slide 3 2-Foot Antennas at 11 GHz  May 2004: FiberTower filed petition for rulemaking  2-foot antennas at 11 GHz: more service sites, lower cost, better esthetics, zoning compliance  proposed coordination rules fully protect full-size users, satellite earth stations  Sole opposition: satellite industry fears more FS use  June 2006: FiberTower received waiver; others pending  March 2007: FCC issued NPRM  comments due May 25; reply comments June 11  may need revision to accommodate smaller compliant antennas.

Slide 4 NASA Seeks to Protect EESS  NASA: wants U.S. at WRC to back new limits on 10.6 GHz and out-of-band limits on GHz (LMDS Block B)  can satisfy 10.6 GHz requirements with automatic transmit power control  main issue: grandfathering units that lack ATPC  Unclear if NASA has met procedural requirements for WRC-07.

Slide 5 FAA Seeks Expanded Notice  FAA NPRM proposes: 1.60 days' notice prior to commencement of, or certain changes to, operations at , , , MHz, GHz. 2.extend FAA notice period of tower construction from 30 to 60 days 3.expand towers subject to notice  Strong opposition from telecommunications industries  Pending.

Slide 6 NTIA Earth Station Parity  NTIA requests that federal earth stations operate on parity basis with private earth stations with private satellites  FWCC: no objection if NTIA coordinates like everybody else  Pending.

Slide 7 MSSI Waiver Request  MSSI manufactures ultra-wideband-like tracking device at MHz  Sought increased peak power for  “high risk industrial sites such as Petroleum Facilities (production and storage), Chemical Facilities (production and storage), Power Plants (nuclear, hydraulic, electric), Mills (Steel, Paper, Pulp, etc.), Mines of all types and similar potentially hazardous industrial sites where real time personnel tracking is required for safety purposes."  FWCC and MSSI negotiated narrowly-named industries, limited applications, automatic shut-off, maximum duty cycle, marketing limitations  Pending.

Slide 8 Orbital-Arc Petition  FS links near orbital arc require waiver  always granted – but block conditional licensing  1999: NSMA sponsored rulemaking petition  supported by NSMA, FWCC, Alcatel, Harris, DMC (Stratex), Comsearch, Pinnacle, UTC, AAR  opposed: three satellite interests  May 2007: FCC denied  said it would grant waivers faster.

Slide 9 Interference Temperature  November 2003: FCC issued NOI/NPRM  NPRM proposed unlicensed devices in MHz, GHz FS bands  based on detect-and-avoid (DAA) technology  April-May 2004: strong opposition, negligible support  FWCC showed that DAA cannot protect FS receivers  May 2007: FCC terminated proceeding.

Slide GHz Rechanneling  : FCC split 18 GHz band between FS and FSS  inadvertently eliminated 5 and 6 MHz FS channels  left only 10, 20, 40, 80 MHz  May 2002: FWCC and NSMA jointly filed for waiver:  asked to coordinate 2.5, 5, 6, 30, and 50 MHz channels  no opposition  April 2004: FCC released NPRM  no opposition  Granted September 2006.

Slide 11 Thank you! Mitchell Lazarus | |