TQM Study For Telecom Towers King Fahd University of Petroleum & Minerals Department of Construction Engineering & Management CEM 515: Project Quality.

Slides:



Advertisements
Similar presentations
TQM Study in Royal Commission of Jubail CEM 515. Purpose of the royal commission Is to develop, construct and maintain the infrastructure of Jubail-2:
Advertisements

Background Presenters Work done in preparation for WHS changes
Tree Diagrams 1. Learning Objectives Upon completing this module, you will be able to:  Understand the purpose and use of a Tree Diagram (TD)  Construct,
CEM-512 Value Engineering Highway Project: South Interchange.
How to Document A Business Management System
Project Change Management
REQUEST FOR PROPOSALS RFP #08-56 Project Management and Procurement Assistance Consultant for an Intelligent Transit System Solution (I.T.S.S.) October.
King Fahd University of Petroleum and Minerals Department of Construction Engineering and Management CEM Instructor: Dr. Soliman Al-Mohawis Important.
1 Technology Implementation Dr. Khaled Bubshait. 2 Dr. Khaled Ahmed Bubshait Khaled Bubshait is a Professor of project/operations Management at King Fahd.
OHT 8.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Review objectives Formal design reviews (FDRs) Participants Preparations.
Quality Management Dr. S.W. Poon. Quality Management Introduction Meaning of quality Quality Control (QC) Quality Assurance (QA) Differences between QC.
KFUPM, Department of Construction Engineering and Management CEM 520 LIABILITY ALLOCATION AMONG THE PARTIES TO FIXED-PRICE CONSTRUCTIN CONTRACTS IN SAUDI.
In the Name of God Most Greasiest the Most Merciful.
Done by: Abdulrahman A. Al-Hussain I.D Done for: Prof. Abdulaziz Bubshait Term 082 – June 2009 King Fahd University of Petroleum and Minerals.
Process Engineer’s Role in Project Management Dr Abdullah Malik.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
ولقد خلقنا السماوات والأرض وما بينهما في ستة أيام وما مسنا من لغوب (سورة ق )
1 BROOKHAVEN SCIENCE ASSOCIATES As-Built Drawings and Commissioning Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional.
CHAPTER 5 Infrastructure Components PART I. 2 ESGD5125 SEM II 2009/2010 Dr. Samy Abu Naser 2 Learning Objectives: To discuss: The need for SQA procedures.
CEM 515 Saeed A Al-Saeed (936091) Prepared for Dr. Abdulaziz A. Bubshait.
Authorization and Inspection of Cyclotron Facilities Inspections.
1 BROOKHAVEN SCIENCE ASSOCIATES Construction Management Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities.
Systems Development Lifecycle Project Identification & Selection Project Initiation & Planning Analysis Logical Design Physical Design Implementation Maintenance.
Project Quality Management CEM515 Professor Abdulaziz A. Bubshait STD. MOHAMMED AL-SAQAR ID
Quality Function Deployment in Maintenance Work Planning by S.O.Duffuaa, A.H.Al-Ghamdi, A.Al-Amer.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
Lecture #9 Project Quality Management Quality Processes- Quality Assurance and Quality Control Ghazala Amin.
1 King Fahd University of Petroleum & Minerals Department of Construction Engineering & Management CEM 515: Project Quality Management Case study of 8-phases.
CHAPTER#08 MANAGEMENT OF TECHNICAL PROPOSALS AND SPECIFICATIONS Lecture No. 08 Course: Engineering Management 19 april 2013 MED DEPARTMENT, U.E.T TAXILA.
Project management Dr. Khaled Bubshait 1 Dr. Khaled A. Bubshait Project Management.
Module 12 Session 12.1 Visual 1 Module 12 Terminating the Project Session 12.1: Terminating the Project.
Evaluation of EU Structural Funds information and publicity activities in Lithuania in Implementing recommendations for Dr. Klaudijus.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
Pre-Project Components
Assuring Safety for Clinical Techniques and Procedures MODULE 5 Facilitative Supervision for Quality Improvement Curriculum 2008.
Hall 180 Cryogenic test facility: Project management: Project Change Request, EVM and Interface Sheet L. Serio.
Understanding Fire Sprinkler Systems (c) Nothing in this Act shall be construed to prevent a fire sprinkler contractor licensed under the Fire Sprinkler.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Systems Development Life Cycle
Wastewater Treatment Plant # 2 Engineering Services Council Workshop July 8, 2014.
Final Year Project 1 (FYP 1)
King Fahd University of Petroleum & Minerals College of Computer Sciences & Engineering Computer Science Department Summer Training Presentation 2 July.
King Fahd University of Petroleum & Minerals Construction Engineering & Management Dept. Prepared For: Dr. Abdulaziz A. Bubshait Prepared By: Abdullah.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Internal Auditing ISO 9001:2015
CEM-515 TQM Study in the System of Offering and Requesting Courses in SAUDI ARAMCO Done by Abdulwahid Al-Zahrani ID #
1 Geant4 Documentation Dennis Wright Geant4 Delta Review 9 October 2002 Internal documentation review Documentation improvements Plans for future improvements.
McDonough Bolyard Peck Educational Series HVAC Commissioning Presented by: Doug Wren Steve Baxter September 30, 2003.
King Fahd University of Petroleum & Minerals Department of Construction Engineering & Management CEM 515: Project Quality Management Case study of Implementation.
1 Punch list / Close Out - Project Completion Best Practices May 2016.
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
0 Design Change Construction & Completion Management (Outline and related procedures) Hanul NPP Engineering Center.
GOVERNMENT OF TAMIL NADU HIGHWAYS DEPARTMENT HIGHWAYS RESEARCH STATION Training program for newly recruited Assistant Engineers.
Organizational Project Management Maturity Model (OPM3)
Mechanical Engineering Facilities Engineering
Administration of a FIDIC Contract - Commencement Date to + 28 Days -
Faculty of Postgraduate Studies and Scientific Research German University in Cairo Modeling to Reduce Variation Order in Construction Projects in Egypt.
((Organizing relationship between the Owner and Contractor involved in construction project at Palestine)) By: Maw`ed Abu Shamleh Malaak Hamaydi Supervisor:
ETPRES MISSION Conducted: in Jakarta, June 2012
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
CEM 515 Process analysis & Improvement
GMP Inspection Process
In the Name of God Most Greasiest the Most Merciful
Selma Update June 8, 2017.
CEM 515 Process analysis & Improvement
Geant4 Documentation Geant4 Workshop 4 October 2002 Dennis Wright
105 Indiana Administrative Code Article 13
TEXAS DSHS HIV Care services group
CIM Cooperative Work Program (COOP)
Presentation transcript:

TQM Study For Telecom Towers King Fahd University of Petroleum & Minerals Department of Construction Engineering & Management CEM 515: Project Quality Management Prepared for: Dr. Abdulaziz Bubshait Abdullah Al-Sharif ID#

Presentation Outline Presentation Outline  Introduction (Tower Eng. Team)  Study Objective  Study Analysis  Conclusion

Purpose of Tower Eng. Team  Provide technical assistance to PMT during design and construction of telecom towers.  Coordinate project activities with contractors, engineers, CSD, Loss Prevention and Inspection Departments.  Prepare detailed scope of work including detailed estimation for manpower and material required for construction.  Review and approve engineering design for new towers.  Review tower related sections of projects DBSP and specifications documents.

Purpose of Tower Eng. Team a. Propose and implement structural upgrades of sub- standard towers. b. Perform structural analysis of existing towers to examine the addition of new antennas and recommend strengthening of towers, where required. c. Review tower related Saudi Aramco Standards and recommend changes and revisions d. Study and approve new antenna installation on existing towers. e. Perform MCI of new towers and reinforcing of exiting towers.. f. Perform Paint Inspections for Comms. Operations Dept. as part of a preventive maintenance program.

Problem statement  Installed/removed antenna on communication towers without our knowledge resulted in project delay

Effects Project completion delays Project completion delays Rework of the completed activities Rework of the completed activities Reject of work already paid/accepted Reject of work already paid/accepted Base future study of new system on incorrect information Base future study of new system on incorrect information Saudi Aramco Drawings not updated Saudi Aramco Drawings not updated

Pareto The results were based on personal experience and experts opinion from their involvements in the project

Flow Chart Start ESR for the study Conduct the study Findings and results End YES NO Area where problem is noticed Available and accurate antenna date sheet Close ESR Site visit shall be conducted

Cause and effect diagram Project Delay Project Management Team Facilities Eng. GroupContractor ProponentComm Operation Dept. New staff Lack of knowledge of SA standards and procedures No Motivation Overload Work overload Lack of accurate information Work overload Lack of technical experience Lack of knowledge No Motivation Lack of knowledge Not familiar with procedures Poor Inspection Lack of knowledge

Solution & Recommendations Regular inspections by Comm Operation Dept shall be done as per SAESs and SAEPs Regular inspections by Comm Operation Dept shall be done as per SAESs and SAEPs Proponent, PMT and Contractor shall report any installation or removal of antenna to Comm Oprt. Dept. Proponent, PMT and Contractor shall report any installation or removal of antenna to Comm Oprt. Dept. Assign an individual from Comm Oprt. Dept. to maintain the data base and he will responsible for it. Assign an individual from Comm Oprt. Dept. to maintain the data base and he will responsible for it. Comm Oprt Dept should provide a copy of the updated antenna stat sheet. Comm Oprt Dept should provide a copy of the updated antenna stat sheet. All installation shall be approved by FEG. All installation shall be approved by FEG. Motivate people Motivate people

THANKS