24 March 2014 The ups and downs of the MaPSA project March

Slides:



Advertisements
Similar presentations
Progress with the 3T Demonstrator Proposal A.Marchioro CERN April 2010.
Advertisements

Z x 725 Sensor Mark 140 x Sensor Coordinates Bump Bond Pad Ø = 12/ FE PAD#2 110 x 210 LM Structure FE Chip Coordinates Bump.
2x2 module & stave layouts. 2 options “Small chip” “Big chip” Boundary between “small” and “big” is determined by the 6” sensor wafer layout that must.
LOW COST AND LOW MASS BUMP BONDING SAMI VAEHAENEN – CERN PH-ESE 1.
Naming Convention HFT PIXEL 12-June pixel identification sector – ladder – chip - row - column 1-10in out1 out2 out Alternative.
UK – quad module. Experience with FE-I4 UK groups relatively new to ATLAS pixel Have 5 USBPix systems up and running now – Glasgow, Edinburgh, Manchester,
3D PACKAGING SOLUTIONS FOR FUTURE PIXEL DETECTORS Timo Tick – CERN
WP6 interconnect technology part
Naming Convention HFT PIXEL 12-June-2009 Updated 03/08/2013 By LG to include row and column information for Ultimate sensors.
Status and outlook of the Medipix3 TSV project
3D chip and sensor Status of the VICTOR chip and associated sensor Bonding and interconnect of chip and sensor Input on sensor design and interconnection.
Plans for Demonstrator Flip Chip Bonding GTK meeting 9/12/08 1.
Technology For Realizing 3D Integration By-Dipyaman Modak.
M.Friedl, C.Irmler, M.Pernicka HEPHY Vienna
Bump Bonding and Thinning of Hybrid Pixel Detectors Kiyoshi Tanida (RIKEN) Johann M. Heuser (RIKEN) PHENIX upgrade workshop, Aug 2002 Contents Bump bonding.
Application of through-silicon-via (TSV) technology to making of high-resolution CMOS image sensors Name: Qian YU Student ID:
NA62 Gigatracker Working Group Meeting 2 February 2010 Massimiliano Fiorini CERN.
Si Pixel Tracking Detectors Introduction Sensor Readout Chip Mechanical Issues Performance -Diamond.
Fabian Hügging – University of Bonn – February WP3: Post processing and 3D Interconnection M. Barbero, L. Gonella, F. Hügging, H. Krüger and.
Tracker Upgrade Week –Sensors Meeting Sensor Production 24. July 2014 Marko Dragicevic.
13 Dec. 2007Switched Capacitor DCDC Update --- M. Garcia-Sciveres1 Pixel integrated stave concepts Valencia 2007 SLHC workshop.
M.Oriunno, SLAC Stave cable and module options. M.Oriunno, SLAC Background - module The IBL electrical unit for data output is a single chip The use of.
VELO Module Kickoff Summary Richard Plackett – VELO Pixel Chip Meeting CERN, 13th November 09.
CMS Phase 2 Tracker R&D R. Lipton 3/27/2014 Module R&D Allocation: Requested ~ $320k, received ~160k – Eliminate VICTR testing (continue with FNAL funds.
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese U.S. ATLAS Review Revised Version November 29, 2000.
Phase 2 Tracker R&D Background: Initial work was in the context of the long barrel on local tracklet- based designs. designs of support structures and.
Module Development Plan I believe that we are ready to proceed to a program to demonstrate a PS module based on “2.5 D” interconnections. This is based.
Foundry Characteristics
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese Revised Version December 18, 2000.
2 Silicon pixel part Done and to be written Written! Under way To be done Introduction 1.Hybrid Pixel Assembly Concept 2.Silicon sensor 1.First thinned.
Phase 2 Tracker R&D Background: Initial work was in the context of the long barrel on local tracklet- based designs. designs of support structures and.
Communications G. Darbo – INFN / Genova IBL MB#15, 5 October 2009 o Bump Bonding Selex / INFN Roma, October, 30 th 2009 G. Darbo - INFN / Genova.
CMS Pixel-Strip Project ACES Fourth Common ATLAS CMS Electronics Workshop for LHC upgrades Wednesday, 19 March 2014 Kostas Kloukinas PH-ESE, CERN.
MPA-LIGHT: Design and results of a 65 nm digital readout Macro Pixel ASIC prototype with on- chip particle recognition for the Phase II CMS outer tracker.
H.-G. Moser MPI Munich Valerio Re INFN AIDA WP3 Summary 1 Status of milestones and deliverables Status of sub-projects Plans for the last year of AIDA.
M. Gilchriese - November 14, Module Decision - To Do List By pixel meetings associated with February 22-26, 1999 ATLAS week Beyond making and testing.
Hybrid circuits and substrate technologies for the CMS tracker upgrade G. Blanchot 04/MAY/2012G. Blanchot - WIT
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/10/20102.
Pixel power R&D in Spain F. Arteche Phase II days Phase 2 pixel electronics meeting CERN - May 2015.
Phase 2 Production Discussion We would like to review the conclusions reached at Caltech on US involvement in the phase 2 outer tracker This will be presented.
UK Bump Bonding (Flip-chip) Meeting at Daresbury (15th May): Tentative Agenda 10:00 Coffee Introduction and Welcome: Phil Allport (Liverpool) 10:40.
PS Module Ron Lipton, Feb A bit of History During much of the conceptual design phase of the outer tracker we had focused on the “long barrel”
Strip Tracker Costing Analysis Status Carl Haber July 25, 2011.
RD program on hybrids & Interconnects Background & motivation At sLHC the luminosity will increase by a factor 10 The physics requirement on the tracker.
1ICC Proprietary MEMS DEVICE WAFER LEVEL PACKAGING TECHNICAL PRESENTATION Customer Device Wafer.
Status report Pillar-1: Technology. The “Helmholtz-Cube” Vertically Integrated Detector Technology Replace standard sensor with: 3D and edgeless sensors,
PACKAGE FABRICATION TECHNOLOGY Submitted By: Prashant singh.
The medipix3 TSV project
R&D on substrates for CMS tracker hybrids G. Blanchot 07/NOV/2011G. Blanchot - R&D on substrates for CMS tracker hybrids1.
B => J/     Gerd J. Kunde PHENIX Silicon Endcap  Mini-strips (50um*2mm – 50um*11mm)  Will not use ALICE chip  Instead custom design based on.
On-Module Interconnection and CNM Projects DEPFET Meeting, Bonn, February Ladislav Andricek, MPI für Physik, HLL  update on thinning  samples.
WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE MID TERM REVIEW CERN 3 RD AUGUST 2010 Work Package 1: Pixel detector systems for particle.
CMS Phase 2 Tracker R&D R. Lipton 2/27/2014
Sensors Pixel dimension 300 x 300 μm2 Standard p-in-n sensors
Si Sensors for Additional Tracker
P. Morettini Towards Pixel TDR PM - ITk Italia - Introduction 8/2/2017.
Update on Bump Bonding GTK-Meeting Sep. 2, 2008 pr.
Status of Medipix Quads in Institute of Physics Prague
Hybrid Pixel R&D and Interconnect Technologies
Highlights of Atlas Upgrade Week, March 2011
Sensor Layout Options Aim is to understand the implication and constrains of possible sensor design/layout on the general ID Layout. Keep both ATLAS “drum”
Status Caltech meeting – discussions of assembly centers, US responsibilities We will try to organize a PS module assembly workshop at Brown April 30 –
Sensor Wafer: Final Layout
Adapting the via last Design
CERN & LAL contribution to AIDA2020 WP4 on interconnections: Pixel module integration using TSVs and direct laser soldering Malte Backhaus, Michael Campbell,
Track Trigger Meeting 1/17/2013
SIT AND FTD DESIGN FOR ILD
Upgrade Phase 2 Mechanics meeting, 21 March 2013 Introduction
Outer Tracker Module Design meeting, 27 January 2014 News on the PS and 2S module geometries 200 W / 2m 100 W / 5m News on PS and 2S module geometries,
Updates on the Silicon Tracker 2S Module
Presentation transcript:

24 March 2014 The ups and downs of the MaPSA project March

MaPSA-Light Development (1) March + = MPA-wafer Sensor or MPA-MPW 6” or 8” Nov 2013

MaPSA-Light Development (1) March + = MPA-wafer Sensor or MPA-Light-MPW 6” or 8” NEW Sensor-Light 4”

MaPSA-Light Development (2) Try also assembly without requiring compatibility with TSV option, to have a best-case comparison basis March MPA wafer MPA wafer-level Test Sensor wafer Sensor test Sensor UBM, bump, dice MPA TSV Option MPA UBM, dice MaPSA assembly MaPSA test Chip foundry Sensor foundry Assembler 1 (TSV) Assembler 2 (no TSV) Assembler 3 (only TSV) HEP Nov 2013

Chats with TSV-capable companies IPdia – Visit to CERN 15 Jan IMEC – Visit to IMEC 26 Feb Both agreed that $/wafer was a likely TSV processing price – (Si sensor 6” wafer price estimate: 1200 CHF) Both spontaneously proposed alternatives to TSVs for MPA-MPA interconnectivity March

Outer Tracker Layout Evolution March Tilted Barrel is becoming baseline (no need for MPA z-interconnectivity anymore)

MaPSA-Light Development (2) TSV compatibility becomes low priority March MPA wafer MPA wafer-level Test Sensor wafer Sensor test Sensor UBM, bump, dice MPA TSV Option MPA UBM, dice MaPSA assembly MaPSA test Chip foundry Sensor foundry Assembler 1 (TSV) Assembler 2 (no TSV) Assembler 3 (only TSV) HEP NEW

MaPSA-Light Development (3) 8 Substrate Strip sensor Cooling SSA March 2014 MAPSA Nov 2013

MaPSA-Light Development (3) 9 March 2014 NEW PS module completely re-designed to cope with thermal load

MPA and bumps are between sensors ! 10 Strip sensor March 2014 Cooling Pixel Sensor …Plus: Cannot get bumped MPAs from TSMC Because of mixed wire/bump bond requirement - Why not shift constraint to more flexible sensor producer ?

Flipping the MaPSA upside down 11 Strip sensor March 2014 Cooling Pixel Sensor Strip sensor Cooling Extended Pixel Sensor Proposal Nov 2013

MaPSA-Light Development (3) Pixel Sensor is extended to include passive routing edge and wire bond area – Can this be done in 6” and 8” wafer? MPA has an additional I/O bump row – Can bumped 12” MPA-wafer be tested? Assembler does only MPA dicing and flip chipping MPA directly cooled (sensor cooled through MPA) Pix sensor HV connection as in 2S module No material between pix and strip sensor March Proposal Extended Pixel Sensor

Generous Development Sequence March MPA-Light design Req Doc RFQ Study OK MaPSA-Light Report MaPSA Test Production Q Q2Q3Q4Q Sensor-Light design Nov 2013

Slipping Development Sequence March MPA-Light design Req Doc RFQ Study OK MaPSA-Light Report MaPSA Test Production Q Q2Q3Q4Q Sensor-Light design NEW Flipped MPA