PHENIX Run-13 status Hubert van Hecke 1Hubert van Hecke - 05 Feb 13 Time meeting.

Slides:



Advertisements
Similar presentations
Run8 – Coming sooner than we had thought Mike Leitch Run8 Coordinator November 7 th /7/20071MJL.
Advertisements

4/11/20131 PHENIX WEEKLY PLANNING 4/11/2013 Don Lynch.
Summery of Cooling System Teflon Leaks* *This is independent of the internal problems Rob Pisani.
2/6/ PHENIX WEEKLY PLANNING Feb. 6, 2014 Don Lynch.
DoE Review June 6-7, 2000 Current Detector Configuration June 6, 2000  Solenoid, Central Preshower installed in central bore  A-layer MDTs installed.
PHENIX Vertex Tracker Atsushi Taketani for PHENIX collaboration RIKEN Nishina Center RIKEN Brookhaven Research Center 1.Over view of Vertex detector 2.Physics.
The Physics Potential of the PHENIX VTX and FVTX Detectors Eric J. Mannel WWND 13-Apr-2012.
Time Meeting 1/20/2015 PHENIX Run-15 Preparations Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
PHENIX Run-14 Status January 28, 2014 Klaus Dehmelt 1Klaus Dehmelt - Jan 28, 2014 RHIC Time meeting.
12/12/ PHENIX WEEKLY PLANNING Dec. 12, 2013 Don Lynch.
David L. Winter for the PHENIX Collaboration PHENIX Silicon Detector Upgrades RHIC & AGS Annual Users' Meeting Workshop 3 RHIC Future: New Physics Through.
1/12/20121 PHENIX WEEKLY PLANNING 1/12/2012 Don Lynch.
Jon S Kapustinsky 11/17/2010 Jon S Kapustinsky FVTX Commissioning Plan 1.71 Jon S Kapustinsky 1.
9/26/ PHENIX WEEKLY PLANNING Sep. 26, 2013 Don Lynch.
1/30/ PHENIX WEEKLY PLANNING Jan. 30, 2014 Don Lynch.
PHENIX Status, 2/22/11 VTX commissioning on beam Local polarimeter in service 9.6% in blue, -16.6% Residual transverse component for longitudinal beam.
Time Meeting 2/3/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
2/9/20121 PHENIX WEEKLY PLANNING 2/9/2012 Don Lynch.
6/6/ PHENIX WEEKLY PLANNING 6/6/2013 Don Lynch Note: No PHENIX planning meeting this week due to end of run party. Feel free to discuss safety and.
1/5/20121 PHENIX WEEKLY PLANNING 1/5/2012 Don Lynch.
5/9/ PHENIX WEEKLY PLANNING 5/9/2013 Don Lynch.
12/26/2013-1/2/ PHENIX WEEKLY PLANNING Dec. 26, Jan. 2, 2014 Don Lynch.
12/5/ PHENIX WEEKLY PLANNING Dec. 5, 2013 Don Lynch.
ATLAS SCT End-Cap C Integration 1.Introduction: to the SCT within ATLAS 2.End-Cap C Reception at CERN 3.Final Assembly 4.Integration with the TRT 5.Combined.
PHENIX Run-13 status Hubert van Hecke for the PHENIX collaboration 1Hubert van Hecke - 05 Mar 13.
PHENIX WEEKLY PLANNING 3/8/2007 Don Lynch. 3/8/207 Weekly Planning Meeting 2 Schedule Cosmic Ray Run (Run 6.9) Continues…. All Up Commissioning In Progress.
12/29/20121 PHENIX WEEKLY PLANNING 12/29/2011 Don Lynch.
PHENIX Run-13 status Hubert van Hecke for the PHENIX collaboration 1Hubert van Hecke - 05 Feb 13.
1/9/ PHENIX WEEKLY PLANNING Jan. 9, 2014 Don Lynch.
Swadhin Taneja Stony Brook University On behalf of Vertex detector team at PHENIX Collaboration 112/2/2015S. Taneja -- DNP Conference, Santa Fe Nov 1-6.
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
4/10/ PHENIX WEEKLY PLANNING April 10, 2014 Don Lynch.
PHENIX STATUS Stefan Bathe, Time Meeting, June 1, 2010.
Luca Spogli Università Roma Tre & INFN Roma Tre
1 PHENIX WEEKLY PLANNING December 3, 2015 Carter Biggs.
PHENIX WEEKLY PLANNING 3/27/2008 Don Lynch. 3/27/2008 Weekly Planning Meeting2 Shutdown ’08 Schedule CM Crane ReviewMar Purge Flammable Gas, Magnet.
10/18/20121 PHENIX WEEKLY PLANNING 10/18/12 Don Lynch.
5/1/ PHENIX WEEKLY PLANNING May 1, 2014 Don Lynch.
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
PHENIX WEEKLY PLANNING 3/22/2007 Don Lynch. 3/22/2007 Weekly Planning Meeting 2 Schedule Re-Start 5 man shifts 3/20/07 Beam: blue ring 3/8/07, in yellow.
1/31/20131 PHENIX WEEKLY PLANNING 1/31/2013 Don Lynch.
PHENIX WEEKLY PLANNING 1/10/2008 Don Lynch. 1/10/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn Going1/18 Gas.
PHENIX WEEKLY PLANNING 2/9/06 Don Lynch. Prep Schedule for Run 6 BBC N&S dried, tested re-installed, final tested [DONE] MuTr FEE and anode purge lines.
1 PHENIX WEEKLY PLANNING January 21, 2016 Carter Biggs.
PHENIX WEEKLY PLANNING 10/4/2007 Don Lynch. 10/4/2007 Weekly Planning Meeting 2007 PHENIX Shutdown October 2007: Finish MPC South Installation, replace.
4/24/ PHENIX WEEKLY PLANNING April 24, 2014 Don Lynch.
1 12/30/2010 PHENIX WEEKLY PLANNING 12/30/2010 Don Lynch.
5/16/ PHENIX WEEKLY PLANNING 5/16/2013 Don Lynch.
3/20/ PHENIX WEEKLY PLANNING March 20, 2014 Don Lynch.
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
PHENIX WEEKLY PLANNING 11/15/2007 Don Lynch. 11/8/2007 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn Going11/30.
PHENIX WEEKLY PLANNING 3/15/2007 Don Lynch. 3/15/2007 Weekly Planning Meeting 2 Schedule Cosmic Ray Run (Run 6.9) Done All Up Commissioning On Going Re-Start.
PHENIX Run-13 status Hubert van Hecke for the PHENIX collaboration Time - 02 April 2013.
5/24/20121 PHENIX WEEKLY PLANNING 5/24/2012 Don Lynch.
12/19/ PHENIX WEEKLY PLANNING Dec. 19, 2013 Don Lynch.
PHENIX WEEKLY PLANNING 5/7/2007 Don Lynch (Thursday is Monday this week)
Preparations for Run 6 Don Lynch February 13, 2006.
DON LYNCH OCTOBER 28, October 28, 2014 sPHENIX Detector Integration & Assembly Concept.
3/7/20131 PHENIX WEEKLY PLANNING 3/7/2013 Don Lynch.
VTX Half LAYER 4 LAYER 3 LAYER 1 LAYER 2 EACH LAYER’S BARRELL MOUNT NEEDS TO BE REFERENCED TO KINEMATIC MOUNTS AND IT’S MOUNTED LADDERS.
PHENIX WEEKLY PLANNING 3/1/2007 Don Lynch March: in like a lion Out like a lamb.
12/08/20111 PHENIX WEEKLY PLANNING 12/08/2011 Don Lynch.
PHENIX WEEKLY PLANNING 11/8/2007 Don Lynch. 11/8/2007 Weekly Planning Meeting2 Run 8 Prep Schedule ItemStartFinish Elec. Cooling Water upgrade(CA) (under.
9/5/ PHENIX WEEKLY PLANNING Sep. 5, 2013 Don Lynch.
2/20/ PHENIX WEEKLY PLANNING Feb. 20, 2014 Don Lynch.
PHENIX Plan for Run13 Kieran Boyle RSC 01/11/20131.
21 Mar 2007ALICE - Paul Dauncey1 ALICE CR07: Installation and Commissioning Paul Dauncey Material from: L. Leistam: “ALICE Status” W. Riegler: “Commissioning.
Time Meeting 2/10/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
Run16 Y. Akiba.
VTX readiness for RUN15 Y. Akiba.
Presentation transcript:

PHENIX Run-13 status Hubert van Hecke 1Hubert van Hecke - 05 Feb 13 Time meeting

Commissioning continues Commissioning was going well in December, but Massive leaks were seen in the outer barrel layer of the VTX (stripixels) Removed the East half of the detector, disassembled it, reassembled with only the FVTX, and reinstalled in the IR Investigation identified galvanic corrosion between carbon and Aluminum as the cause VTX pixels (inner 2 barrels) and FVTX don’t use Aluminum 2Hubert van Hecke - 05 Feb 13 Time meeting FVTX VTX stripixels VTX pixels

Commissioning continues FVTX back and operating (>96% live channels) Flammable gas is on since Feb 1, 2-person watch shifts started Jan 22 First Cosmic data taken last night Magnets on today Shielding wall is up, plan to roll in on Friday 8 Full shifts starting Feb 11 3Hubert van Hecke - 05 Feb 13 Time meeting

Near-term objectives Commission all systems Overnight, run cosmics – Cosmics are needed to study momentum smearing, charge-sign efficiencies, trigger issues, backgrounds etc. – Cosmics will be collected in beam down-time periods throughout the run Commission with beam as it arrives 4Hubert van Hecke - 05 Feb 13 Time meeting