PHENIX Run-13 status Hubert van Hecke for the PHENIX collaboration 1Hubert van Hecke - 05 Feb 13.

Slides:



Advertisements
Similar presentations
2/6/ PHENIX WEEKLY PLANNING Feb. 6, 2014 Don Lynch.
Advertisements

DoE Review June 6-7, 2000 Current Detector Configuration June 6, 2000  Solenoid, Central Preshower installed in central bore  A-layer MDTs installed.
PHENIX Vertex Tracker Atsushi Taketani for PHENIX collaboration RIKEN Nishina Center RIKEN Brookhaven Research Center 1.Over view of Vertex detector 2.Physics.
The Physics Potential of the PHENIX VTX and FVTX Detectors Eric J. Mannel WWND 13-Apr-2012.
PHENIX Run-14 Status January 28, 2014 Klaus Dehmelt 1Klaus Dehmelt - Jan 28, 2014 RHIC Time meeting.
APS Meeting April 5-8, 2003 at Philadelphia Chunhui Luo 1 Chunhui Luo Inclusive J/ψ Production at DØ.
David L. Winter for the PHENIX Collaboration PHENIX Silicon Detector Upgrades RHIC & AGS Annual Users' Meeting Workshop 3 RHIC Future: New Physics Through.
Time Meeting 3/17/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
1/12/20121 PHENIX WEEKLY PLANNING 1/12/2012 Don Lynch.
PHENIX WEEKLY PLANNING 1/4/2007 Don Lynch. 1/4/207 Weekly Planning Meeting 2.
PHENIX Status, 2/22/11 VTX commissioning on beam Local polarimeter in service 9.6% in blue, -16.6% Residual transverse component for longitudinal beam.
PHENIX WEEKLY PLANNING 2/15/2007 Don Lynch. 2/15/207 Weekly Planning Meeting 2 Remaining Schedule StartComplete Cosmic Ray Run (Run 6.9)In Progress All.
Time Meeting 2/3/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
2/9/20121 PHENIX WEEKLY PLANNING 2/9/2012 Don Lynch.
6/6/ PHENIX WEEKLY PLANNING 6/6/2013 Don Lynch Note: No PHENIX planning meeting this week due to end of run party. Feel free to discuss safety and.
1/5/20121 PHENIX WEEKLY PLANNING 1/5/2012 Don Lynch.
Time Meeting PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
12/26/2013-1/2/ PHENIX WEEKLY PLANNING Dec. 26, Jan. 2, 2014 Don Lynch.
PHENIX Run-13 status Hubert van Hecke for the PHENIX collaboration 1Hubert van Hecke - 05 Mar 13.
PHENIX WEEKLY PLANNING 3/8/2007 Don Lynch. 3/8/207 Weekly Planning Meeting 2 Schedule Cosmic Ray Run (Run 6.9) Continues…. All Up Commissioning In Progress.
12/29/20121 PHENIX WEEKLY PLANNING 12/29/2011 Don Lynch.
The W program at PHENIX R. Seidl (University of Illinois and RBRC) for the PHENIX Collaboration Workshop on Parity Violating Spin Asymmetries BNL, April.
Takao Sakaguchi, BNL Run-11 PHENIX Run Coordinator PHENIX Run-11 Report Sakaguchi, RHIC retreat 1 RHIC retreat version.
PHENIX Run-13 status Hubert van Hecke 1Hubert van Hecke - 05 Feb 13 Time meeting.
1/9/ PHENIX WEEKLY PLANNING Jan. 9, 2014 Don Lynch.
Swadhin Taneja Stony Brook University On behalf of Vertex detector team at PHENIX Collaboration 112/2/2015S. Taneja -- DNP Conference, Santa Fe Nov 1-6.
Time Meeting 3/17/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
4/10/ PHENIX WEEKLY PLANNING April 10, 2014 Don Lynch.
PHENIX STATUS Stefan Bathe, Time Meeting, June 1, 2010.
Time Meeting 3/10/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
PHENIX WEEKLY PLANNING 3/6/2008 Don Lynch. 3/6/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
1 PHENIX WEEKLY PLANNING December 3, 2015 Carter Biggs.
10/18/20121 PHENIX WEEKLY PLANNING 10/18/12 Don Lynch.
5/1/ PHENIX WEEKLY PLANNING May 1, 2014 Don Lynch.
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
11/8/20121 PHENIX WEEKLY PLANNING 11/8/12 Don Lynch.
PHENIX WEEKLY PLANNING 3/22/2007 Don Lynch. 3/22/2007 Weekly Planning Meeting 2 Schedule Re-Start 5 man shifts 3/20/07 Beam: blue ring 3/8/07, in yellow.
PHENIX WEEKLY PLANNING 1/10/2008 Don Lynch. 1/10/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn Going1/18 Gas.
PHENIX WEEKLY PLANNING 2/9/06 Don Lynch. Prep Schedule for Run 6 BBC N&S dried, tested re-installed, final tested [DONE] MuTr FEE and anode purge lines.
9/27/20121 PHENIX WEEKLY PLANNING 9/27/2012 Don Lynch.
1 PHENIX WEEKLY PLANNING January 21, 2016 Carter Biggs.
PHENIX WEEKLY PLANNING 10/4/2007 Don Lynch. 10/4/2007 Weekly Planning Meeting 2007 PHENIX Shutdown October 2007: Finish MPC South Installation, replace.
PM Meeting PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
1/27/2016 R.Seidl: status of simulation1 W muon analysis in PHENIX Status of the background understanding, signal, smearing and asymmetries R.Seidl (RBRC)
4/24/ PHENIX WEEKLY PLANNING April 24, 2014 Don Lynch.
1 12/30/2010 PHENIX WEEKLY PLANNING 12/30/2010 Don Lynch.
4/17/ PHENIX WEEKLY PLANNING April 17, 2014 Don Lynch.
12/6/20121 PHENIX WEEKLY PLANNING 12/6/12 Don Lynch.
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
1/26/20121 PHENIX WEEKLY PLANNING 1/26/2012 Don Lynch.
PHENIX WEEKLY PLANNING 11/15/2007 Don Lynch. 11/8/2007 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn Going11/30.
PHENIX WEEKLY PLANNING 3/15/2007 Don Lynch. 3/15/2007 Weekly Planning Meeting 2 Schedule Cosmic Ray Run (Run 6.9) Done All Up Commissioning On Going Re-Start.
PHENIX Run-13 status Hubert van Hecke for the PHENIX collaboration Time - 02 April 2013.
5/24/20121 PHENIX WEEKLY PLANNING 5/24/2012 Don Lynch.
PHENIX WEEKLY PLANNING 6/28/2007 Don Lynch. 6/14/2007 Weekly Planning Meeting 2007 Summer Shutdown Schedule ItemStartComplete RPC Factory set up5/ ?
PHENIX WEEKLY PLANNING 5/7/2007 Don Lynch (Thursday is Monday this week)
Preparations for Run 6 Don Lynch February 13, 2006.
3/7/20131 PHENIX WEEKLY PLANNING 3/7/2013 Don Lynch.
PHENIX WEEKLY PLANNING 3/1/2007 Don Lynch March: in like a lion Out like a lamb.
Jamaica 11 Jan.8, 2009 Muon Trigger Upgrade at PHENIX RIKEN/RBRC Itaru Nakagawa RIKEN/RBRC Itaru Nakagawa.
12/08/20111 PHENIX WEEKLY PLANNING 12/08/2011 Don Lynch.
Atlas status report. LHC Cooldown Status LHC is proceeding with the cooldown and the hardware commissioning L.Evans is asking the experiments to close.
2/20/ PHENIX WEEKLY PLANNING Feb. 20, 2014 Don Lynch.
PHENIX Plan for Run13 Kieran Boyle RSC 01/11/20131.
1 2/19/2009 PHENIX WEEKLY PLANNING 2/19/2009 Don Lynch.
Silicon Pixel Detector for the PHENIX experiment at the BNL RHIC
Run16 Y. Akiba.
VTX readiness for RUN15 Y. Akiba.
Presentation transcript:

PHENIX Run-13 status Hubert van Hecke for the PHENIX collaboration 1Hubert van Hecke - 05 Feb 13

Important systems for Run-13 W trigger – Both RPC’s are now in the trigger MPC – Muon Piston Calorimeter – Trigger on forward pi0 VTX - silicon vertex detector, and the FVTX – forward silicon detector 2Hubert van Hecke - 05 Feb 13

RPCs RPC1 (shown), located in front of the Muon arms, RPC3 located behind the Muon arms Added shielding in the tunnel Added cooling 3Hubert van Hecke - 05 Feb 13

MPCs – Muon Piston Counters Beam dump during Run-12 damaged South MPC Repaired during the shutdown, and reinstalled We are still vulnerable to such an event 4Hubert van Hecke - 05 Feb 13

VTX and FVTX Commissioning was going well in December, but Massive leaks were seen in the outer barrel layer of the VTX (stripixels) Removed the East half of the detector in January, disassembled it, reassembled with only the FVTX, and reinstalled in the IR Rapid investigation identified galvanic corrosion between carbon and Aluminum as the cause VTX pixels (inner 2 barrels) and FVTX don’t use Aluminum FVTX (again) fully functional 5Hubert van Hecke - 05 Feb 13 FVTX VTX stripixels VTX pixels

Commissioning continues FVTX back and operating (>96% live channels) Flammable gas is on since Feb 1, 2-person watch shifts started Jan 22 First Cosmic data taken last night Magnets on today Shielding wall is up, plan to roll in on Friday 8 Full shifts starting Feb 11 6Hubert van Hecke - 05 Feb 13 Time meeting

Run-13 top priority: finish the W program 7Hubert van Hecke - 05 Feb 13 Inclusive high pT leptons ∫Ldt=300pb -1 in 30cm, P≥ pb -1 recorded in Run-13 -> ~750pb -1 delivered

After that, energy scan program 8Hubert van Hecke - 05 Feb 13

backup 9Hubert van Hecke - 05 Feb 13