Presented by : Steven J Edwards, Head of Income and Pricing, Wales & West Utilities GDN Allowed and collected revenue awareness presentation for Shippers.

Slides:



Advertisements
Similar presentations
Mod 0508 Revised Distributed Gas Charging Arrangements  Proposed change to take into account that flows from DN Entry points to DN Supply Points should.
Advertisements

Non-code User Pays. 2 What we will cover Background Current Services Governance Arrangements What is working well What is not working as well.
Funding UKLink Process changes (User Pays). 2 Purpose of Presentation  Review of User Pays  Principles  Application to date  National Grid NTS observations.
RIIO-T1 impact on allowed revenues and network charges 6 September 2012.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
UNC Modification Proposal Revised Timescales for LDZ Shrinkage Arrangements Simon Trivella – 25 th September 2008 Distribution Workstream.
Project Nexus Workgroup 9 th September Background During detailed design a number of areas have been identified that require clarification with.
SGN’s April 09 Mod 186 Report DCMF Meeting – April 27 th 2009.
Mod 0445 – Amendment to the Arrangements for Daily Metered Supply Point Capacity Ofgem Direction to Provide Further Evidence National Grid Distribution.
Entry Capacity Release Methodology Statement Transmission Workstream, 4 th May 2006.
Industry Dialogue on xoserve Services Progress Report for Ofgem 5 th December 2006.
User Pays Funding – Potential Licence Mechanism Simon Trivella – January 21 st 2010 Governance Workstream.
UK GAS DISTRIBUTION DN Charging Methodology Forum NGGD Oct-14 Mod0186 Dave Chalmers / Mike Lapper.
EHV generation charging methodology change Harvey Jones.
DN Update 24 th May 2007 LDZ System Charges Capacity/Commodity Split and Interruptible Discounts.
1 Mod Review Group 126 Feb 07 slides 126 Review Group – Restriction of Invoice Billing Period  The review proposal is primarily concerned with restricting.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
UNC G7.3.7 Invoicing Read Estimation Proposal Requirement for Read Estimation & Proposed Methodology Dean Johnson Distribution Workstream – 25 th August.
LDZ Shrinkage - a National Grid Overview Chris Warner Mod 0194/RG 0208 June 2008.
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
National Grid UK Distribution Update Gas Customer Forum 29 th January 2007 Kerri Matthews.
UNC Proposal 329 – Review of Industry Charging & Contractual Arrangements - DM SHQs and DM SOQs Joel Martin – 21/09/10.
UP presentation Transmission wstream Jan 08 1 user pays services implementation January 2008.
Governance and Charging Methodology for User Pays Services 10 th January 2007.
DN Interruption Reform Distribution Workstream 23 rd July 2009.
Shrinkage Forum Tuesday 8 March 2011, 31 Homer Road.
Total xoserve income £(a)m (ASA services – includes element for transporter funded changet) Transporter funded change budget built into service charge.
Modification proposal 0073 ‘Revision to the Notice Period regarding the implementation of changes to Transportation charges’ Transmission Workstream, 2.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
DNPC08 Review of Standard LDZ System Charges 6 September 2010.
Review of Entry Capacity and the Appropriate Allocation of Financial Risk Review Group th Sept 2008.
Proposed DN Pensions Deficit Charge Transmission Workstream 2 November 2006.
Modification Proposal 0395 & 0398 – Limitation on Retrospective Invoicing and Invoice Correction 1 st December 2011.
1 v1 iGT CSEP Billing Solution ScottishPower Proposals April 08.
Customer Charge On behalf of all DNs 25 October 2010.
Gas Distribution Transportation Charging What are the Risks to Pricing predictability? Stephen Marland Pricing Manager
1 Mod Review Group 126 Mar 2007 slides 126 Review Group – Restriction of Invoice Billing Period  The review proposal is primarily concerned with restricting.
Emergency Cashout Prices and Emergency Curtailment Quantity (ECQ) Adjustment Ritchard Hewitt Gas Code Development Manager.
Transmission workstream 6 April Overview of TPCR Third Consultation UNC transmission workstream – 6 April Mark Feather.
Agency Charging Statement Overview of Consultation 11 th February 2008.
1 Review Group 264 Rules & Options Analysis for BSSOQ Methodology Changes Post MOD th September 2009.
1 Mod Review Group 126 Apr 2007 slides 126 Review Group – Restriction of Invoice Billing Period  These slides describe the business rules for the treatment.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th March 2009.
DNPC08 Review of Standard LDZ System Charges Consultation Responses 25 October 2010.
Energy Market Issues for Biomethane Projects Workshop - 31 October 2011 RIIO-GD1 Environmental Incentives.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th Feb 2009.
UNC Modification Proposal 0380 Periodic Annual Quantity Calculation Calculation of Daily Supply Point Capacity Alan Raper – DNCMF 26 th September 2011.
Modification 0232 Presentation for Total By Gareth Evans.
Industry Dialogue on xoserve Services 14 th September 2007.
PN UNC Workgroup Invoicing 10 th January Objectives of the Workgroups To determine business principles for future Invoicing processes –Consider/review.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Proposal to modify Standard Special Conditions A4, A5 and D11 of the Gas Transporter licence Distribution Charging Methodology Forum (DCMF) 13 August 2007.
DN Interruption Reform Transmission Workstream Mark Freeman 5 th April 2007.
Customer Charge On behalf of all DNs 19 November 2010.
Stuart Forrest, Network Planning Manager, Scotia Gas Networks 19 th October 2010 MOD Review of Industry Charging & Contractual Arrangements in Relation.
Background Current balance of LDZ System and Customer charges
Wales & West Utilities Entry – Standard Special Condition D12
User Pays Funding – Potential Licence Mechanism
Transmission Workstream 4th July 2007
Mod 0621 Amendments to Gas Transmission Charging Regime
DNPC06 From 1 October 2012 the DNs will pay the NTS Exit Capacity charges to the NTS and recover the cost from shippers DNPC06 put forward for consultation.
CSEPs Reconciliation Proposals
Exit Capacity Substitution and Revision
Modification 0117 – Additional Considerations
Questions for Consultation
0476 Alignment of DN Charging Methodology with RIIO-GD1 Arrangements
Presentation on behalf of all DNs Lorraine Goodall - SGN
UNC Transmission Workstream 7th December 2006
User Pays Principles and Governance
PN UNC Workgroup (AQ topic)
Presentation transcript:

Presented by : Steven J Edwards, Head of Income and Pricing, Wales & West Utilities GDN Allowed and collected revenue awareness presentation for Shippers Monday 17 th Sept 2007

2 Topics to cover The Gas Transporter Licence Allowed revenue setting process with Ofgem The elements of Allowed revenue The elements of collected revenue Relationship between Allowed revenue and collected revenue Example calculations – areas that contribute to pricing fluctuations Summary

3 Disclaimer This presentation is given to the Shipper community with the sole objective of increasing awareness of the community of the elements of GDN Allowed Revenue and its relationship with collected revenue. This presentation is a high level view of the Price Control conditions of the GDN to which specific reference should be made. The presenter, Wales & West Utilities and other GDNs will not be responsible or liable for any use of this document or the excel examples used. All figures are fictitious and are used for illustrative purposes only.

4 The Gas Transporter licence Standard Special section A : Applies to all ex Transco Gas Transporters, Transmission and Distribution, Standard Special section D: Applies to all ex Transco Distribution Networks Special Condition section E: Is specific to each Licensee Special condition E2B contains the algebra that defines GDN allowed Revenue There are obligations in all sections around charging and pricing that Transporters must adhere to when applying charging methodologies and price changes.

5 Allowed Revenue setting process with Ofgem Consultation process prior to a Price control period and at the end of a Price control period. GDNs submit data as requested by Ofgem and provide responses to “ Narrative “ questions as required by Ofgem Ofgem, GDNs and wider industry all engaged in this transparent process Ofgem propose an outcome and GDNs agree or not GDN Licence modified to reflect that outcome and is in place for the period of the Price control period GDNS are allowed to collect the revenue agreed via the PCR process with licence conditions around over / under recoveries Once an outcome is accepted it is in principle in place for the period of the Price control review

6 The Elements of Allowed Revenue ( 1 ) “ K” brought forward. The under or over recovery from the previous period Logging up process / any other outcomes of previous price control. The accepted outcome of the forthcoming Price control review. The 2002/3 to 2006/7 PCR, The interim 2007/8 PCR The 2008/9 to 2012/13 PCR

7 The Elements of Allowed Revenue ( 2 ) An allowance is developed for the Price control period which is underpinned by allowances for each year. Within the Algebra in E2B, the Revenue Allowance for the period ( normally 5 years ) is translated into an opening year 1 Core Allowed Revenue. This is then rolled forward and adjusted each year for the following items : RPI X Any volume driver Cost Pass through Incentives - currently : Repex, Shrinkage, Exit Capacity

8 The Elements of Collected Revenue ( 1 ) Licence conditions to ensure that charges are set to recover allowed revenue Licence conditions to ensure that charges are cost reflective Licence conditions about notification periods and publication of charges All DNs use single entity Xoserve as billing interface with Shippers UNC defines Shipper / DN relationship

9 The Elements of Collected Revenue ( 2 ) Actual collected revenue is influenced by : Allowed revenue Charge Types Number of loads, SOQs, AQs The rates for each of the charge types The price changes that occur in a year Actual Volume throughputs Reconciliation income Other events : Meter errors etc

10 The Relationship between Allowed and collected revenue ( 1 ) Each year the DNs have a requirement to return to Ofgem their annual comparison on Allowed and Collected Revenue Allowed revenue will vary from year to year due to :  K brought forward from a previous period  The end of a formula period, Closure and start changes  Any volume driver applied  Incentive revenues

11 The Relationship between Allowed and collected revenue ( 2 ) Collected revenue will within a year and from year to year due to :  Actual volumes, AQs, SOQs and Loads  The level of Price change implemented Remember collected follows Allowed therefore collected also varies due to  K brought forward from a previous period  The end of a formula period, Closure and start change  Incentive revenues Key Point : Collected Revenue follows Allowed Revenue

12 The Relationship between Allowed and collected revenue ( 3 ) What are ( have been ) the causes of price changes from year to year ?  The non alignment of the volume driver in allowed revenue to the impact volumes have had on annual actual collected  The unpredictability of actual volumes and their differing impact on Allowed Revenue and collected revenue, then the subsequent impact on K  The high dependency of collected revenues on volumes  End of a price control period, start of an interim period – i.e changes in allowed revenues from year to year.  The timing of an Oct price rise also means that your price change is generally higher than would be needed with an April price change as the Oct price change is designed to collect an annual allowed amount over 6 months as opposed to 12 months Key Point : DNs are allowed to collect their annual allowed Price Control Revenues. Any under or overs fall into K the following year

13 The Relationship between Allowed and collected revenue ( 4 ) Excel examples

14 Summary Allowed Revenues are a licence output and subject to Price control process Collected revenue follows Allowed Revenue DNs aim to collect annual Allowed revenue within the same year The more stable year on year Allowed revenue is the more stable the price changes will be The more stable / predictable collected revenue is the more stable price changes will be The more the volume impacts on Allowed and collected are aligned the less likelihood there is of large K factors impacting the following year A reduction / removal of actual volume impacts on Allowed and collected will reduce price instability

15 GDN Allowed and Collected Revenue Any Questions ?